Lauderdale County’s website lists a Road Department, a Revenue Commissioner and a License Commissioner, but no building department. The City of Florence Building Department issues permits inside Florence and requires them for new homes within a 3-mile radius outside the city limits, which it calls its planning jurisdiction. Killen, Rogersville and St. Florian run building permits of their own. Everywhere in the unincorporated county, the County Engineering Department administers the Flood Damage Prevention Ordinance the Commission updated on February 12, 2024, and reviews subdivision plats for a $25 Permit to Develop.
What construction approvals apply in Lauderdale County?
County Engineering Department
- Floodplain Development Permit before any development in a special flood hazard area, including accessory and agricultural structures
- Proposed plat review and a Permit to Develop when land is subdivided outside a city’s planning jurisdiction
- A signed agreement before a utility is placed in a county right-of-way
City of Florence Building Department
- Any building work or change of occupancy inside the city limits
- Electrical, gas, mechanical and plumbing systems inside the city
- New homes in the 3-mile planning jurisdiction
- Signs; banners up to 32 square feet need no permit
Development here has the ordinance’s wide meaning: buildings, filling, grading, paving, excavation, drilling and the storage of equipment or materials all count.
Short on time to read all of this?
Get a free quote →Who issues building permits in each part of Lauderdale County?
| Area | Who issues building permits | Office and phone |
|---|---|---|
| Florence, and new homes within 3 miles of its limits | City of Florence Building Department; Justin Mason is the Building Official | 110 West College St., Suite 216, Florence · (256) 760-6325; Monday to Friday, 8:00 a.m. to 5:00 p.m. |
| Killen | The Town: the 2023 Florence-Lauderdale hazard mitigation plan lists a Town of Killen Building Code, with Codes Enforcement at Town Hall in charge | Killen Town Hall · (256) 757-1246 |
| Rogersville | The Town’s Building Inspector. Zoning Ordinance 11-14-2011/2014 requires a building permit for any new work, renovation or repair that touches foundations, structure, gas lines, water lines or electrical wiring, accessory buildings included, charged under the Town’s current fee schedule | Town Hall, 50 Wheeler Street · (256) 247-5446 |
| St. Florian | The Town’s Building Department. Ordinance No. 86 of February 14, 2011 covers the town limits and the police jurisdiction and adopts the 2009 International Codes and the 2011 National Electrical Code; plans for a new building are left at Town Hall for the Town’s inspectors to review | Town Hall, 83 Saint Florian Road, Florence · (256) 767-3690 |
| Lexington | Not stated on the Town’s website; Florence does not serve the town | Town Hall, 11060 Highway 101 · (256) 229-5221; Monday to Friday, 8 a.m. to 4 p.m. |
| Waterloo | Not stated; Florence names Waterloo as a place where it issues no permits and makes no inspections | Waterloo Town Hall · (256) 764-3237 |
| Anderson | Not stated in any published source | Anderson Town Hall · (256) 247-3617 |
| Unincorporated county, including Center Star and Greenhill | No county building department is listed, and Florence excludes Center Star and Greenhill by name. Flood zone and subdivision approvals come from the County Engineer | Road Department, 1630 State Street, Florence · 256-760-5880 |
The 2023 hazard mitigation plan names no building code for Anderson, Lexington or Waterloo.
Lauderdale County building and development permit types
- Floodplain Development Permit, applied for on the County’s own forms through the County Engineer, who is the Floodplain Administrator.
- Permit to Develop, issued by the County Engineer after the Commission approves a proposed subdivision plat.
- Utility Permit, an agreement with the County Engineer for utility facilities on a public right-of-way, backed by a certified check or bond.
- City of Florence Building Permit application, emailed with digital plans to buildingplans@florenceal.org with the property address in the subject line.
- Manufactured home registration at the Revenue Commissioner’s Office, due within 30 days of purchase.
Not sure this scope needs a permit?
Get a free quote →Lauderdale County permit fees
| County charge | Amount |
|---|---|
| Permit to Develop (Subdivision Regulations, 2011) | $25 |
| Subdivision inspection fee | $200 plus $10 per lot or site |
| Fine for selling or leasing lots without approval | $1,000 per lot, doubled if unpaid after 30 days |
| Manufactured home registration, owner-occupied | $29 single wide; $53 double wide |
| Manufactured home registration, rental | $53 single wide; $101 double wide or larger |
The flood ordinance attached to the Commission’s minutes sets no application fee for the Floodplain Development Permit.
Florence charges by valuation on its Fees page: $15 for the first $1,000 plus $5 for each additional thousand up to $50,000, $260 plus $4 per thousand from $50,000 to $100,000, $460 plus $3 per thousand to $500,000, and $1,660 plus $2 per thousand above that. A new house is valued at $49 per heated square foot and $12.25 per unheated square foot, which is the valuation the fee is worked from, not the fee itself. Moving a building costs $100.
St. Florian’s Ordinance No. 86 uses the same four valuation steps ($15, $260, $460 and $1,660 bases, with nothing due on work of $1,000 or less unless an inspection is needed, at $15 each) but values a house at $50 per heated square foot and $12.50 per square foot for unheated space, garages and accessory buildings. A house with 2,000 heated square feet is therefore valued at $100,000 and pays $460. Commercial and other work is charged on its actual cost, a swimming pool is $50, moving a building or manufactured home is $100, and work started before the permit pays double. Rogersville’s ordinance points to the Town’s current fee schedule without printing it.
Electrical, plumbing, HVAC and gas in Lauderdale County
No county office issues trade permits. Inside Florence, electrical, gas, mechanical and plumbing work each need a City permit, and the department has its own electrical inspector and plumbing and gas inspector. St. Florian has a Building Inspector and an Electrical Inspector and charges $50 to inspect an electrical or gas hookup.
Rather talk it over?
Call 1-855-478-4290 →For a house on a septic tank, approval comes from the Lauderdale County Health Department at 4112 Chisholm Road, Florence (256-764-7453). Florence asks for that approval with the plans for a new home on septic, and for a copy of the Health Department’s septic tank certificate once the system is in.
Application documents for Lauderdale County
Floodplain Development Permit
- Plans in duplicate, drawn to scale, showing ground elevations and the proposed work
- Plot plan with base flood elevations, flood zone and floodway boundaries, certified by a licensed engineer or surveyor
- Lowest floor elevation of every proposed structure
- Foundation plan showing how the building will be elevated and any flood openings
- How enclosed areas below the lowest floor will be used
- An engineer’s report if a watercourse will be altered or moved
New home in Florence’s jurisdiction
- Digital building plans
- Plot plan by a registered land surveyor showing where the house will stand
- Health Department approval if the lot is on septic
The County Engineer takes at least 30 days to review a subdivision application.
How to apply in Lauderdale County: 6 steps
Inside the city, or within 3 miles of its limits for a new home, the application goes to the Florence Building Department.
Killen, Rogersville and St. Florian issue their own building permits, St. Florian in its police jurisdiction too; Lexington, Anderson and Waterloo publish nothing.
The Road Department page links to it. A site in a special flood hazard area needs the Floodplain Development Permit first.
Submit the flood application and certified plot plan at 1630 State Street, Florence.
Apply to the Health Department on Chisholm Road.
Give the County Engineer the as-built certificate once the lowest floor is in, and the finished-construction certificate at the end.
Rather not deal with the Lauderdale County building department?
Get a free quote →Inspections and closeout in Lauderdale County
Under the flood ordinance the Floodplain Administrator makes periodic inspections while work is under way and may enter the site during normal business hours. Work done before the as-built elevation certificate is submitted is at the permit holder’s risk, and missing or uncorrected certificates can bring a stop-work order. The project closes with a Certificate of Compliance Letter, issued only after the FEMA elevation certificate for the finished building has been reviewed.
In Florence’s jurisdiction the contractor calls for each inspection, in a fixed order that runs from the footing to the final electrical, plumbing and structural inspection, and the yellow permit card must be posted on site or the inspector will not inspect.
St. Florian books inspections by phone on (256) 767-3690. In Rogersville the Building Inspector makes the final inspection and issues the certificate of occupancy within 3 days of being told the building is ready.
Lauderdale County-specific permit considerations
Flood elevations: where a base flood elevation is known, the lowest floor of a new or substantially improved building, including a basement, must be at least 1 foot above it. In flood zones with no base flood elevation, the floor must be at least 3 feet above the highest adjacent grade.
Subdivision limits: the county regulations do not apply inside the territorial jurisdiction of a municipal planning commission. Where they do apply, the developer has 1 year from the Permit to Develop to begin work.
Florence review times: the City says new-home plans generally take 7 days to review, and commercial or industrial plans 15 to 20 working days.
Permit life in the towns: every St. Florian permit expires one year from purchase. A Rogersville permit lapses if nothing has been built above the foundation within 90 days of issue, and the building must be finished within one year.
St. Florian fines: Ordinance No. 104-A sets $500 for a violation of the building ordinance, $1,000 for occupying a commercial building without a Certificate of Occupancy, $100 a day for occupying a home without one, and $250 for working without the proper licence.
County offices: the courthouse at 200 S. Court Street, Florence, is open Monday to Friday from 8 a.m. to 5 p.m.; the Commission office is on (256) 760-5750.
Want this handled start to finish?
Get a free quote →Alabama building code
From 1 January 2027, under Act 2024-443, a residential home builder must build to the applicable residential code (the Alabama Residential Building Code, or the local code where one applies) even where no building department inspects the work. Since 1 October 2024 the Alabama Home Builders Licensure Board adopts the residential code, and the Licensing Board for General Contractors the commercial energy code. Alabama’s codes and the 2027 change
Official Lauderdale County resources
- Lauderdale County Road Department
- Commission minutes of February 12, 2024, with the Flood Damage Prevention Ordinance
- Lauderdale County Subdivision Regulations (2011)
- Lauderdale County Utility Permit agreement
- Lauderdale County municipalities and town hall phone numbers
- Lauderdale County manufactured housing registration
- City of Florence permits
- City of Florence Building Department
- Town of St. Florian Building Department
- St. Florian Ordinance No. 86: codes and permit fees
- Town of Rogersville ordinances, with the Zoning Ordinance
- Lauderdale County Health Department contacts
- Florence-Lauderdale Multi-Hazard Mitigation Plan (2023)
Inspections are where schedules slip.
Get a free quote →Lauderdale County building permit FAQs
Does Lauderdale County, Alabama issue building permits?
The County lists no building department. Its Engineering Department issues floodplain development permits and subdivision approvals; building permits come from Florence in the city and, for new homes, within 3 miles of its limits.
Do I need a Florence permit if I build just outside the city?
For a new home, yes, if the site is within a 3-mile radius of the city limits. Florence does not issue permits in Center Star, Greenhill, Killen, Lexington, Rogersville, St. Florian or Waterloo.
Who issues building permits in Killen?
The Town of Killen. The 2023 county hazard mitigation plan lists a Town of Killen Building Code enforced from Town Hall, (256) 757-1246.
Who issues building permits in St. Florian and Rogersville?
Each town does. St. Florian’s Building Department is at Town Hall, 83 Saint Florian Road, (256) 767-3690, and its ordinance also covers the police jurisdiction. In Rogersville the Building Inspector issues permits under the Zoning Ordinance; Town Hall is on (256) 247-5446.
How high must a building be in a Lauderdale County flood zone?
At least 1 foot above the base flood elevation, or 3 feet above the highest adjacent grade where no base flood elevation exists.
What does it cost to subdivide land in the county?
The Permit to Develop is $25 and the subdivision inspection fee is $200 plus $10 per lot or site.
Who approves septic systems in Lauderdale County?
The Lauderdale County Health Department, 4112 Chisholm Road, Florence, 256-764-7453.
Where is the county floodplain office?
At the Road Department, 1630 State Street, Florence, 256-760-5880. The County Engineer is the Floodplain Administrator.
Simplify Lauderdale County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Alabama. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lauderdale County sooner?
Let Alliance prepare, file, and track your Lauderdale County permits while your crew stays on the job.
More Alabama permitting guides
This guide is provided by Alliance Permitting for general information about Lauderdale County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.