Racine Building Permit — Filed & Tracked For You

Racine wrote its permit rules into Chapter 18 with unusual specificity — down to a dedicated section requiring building permits for hoop houses — and stamps an eighteen-month life on every permit it issues.

Scope: City of RacineCode route: Wisconsin UDC + Commercial Building CodeTrades: State licensed
Authority
Building Department730 Washington Avenue
Delegation
Second-class city — all sizesReview via E-Plan Exam
Permit life
Eighteen months from issuanceSec. 18-93, printed on the forms
Named category
Hoop housesSec. 18-392 requires a permit

Racine's building law lives in Chapter 18 of the Municipal Code, and it is granular: a chief building inspector established by ordinance, reinspection fees, a mechanical division running from furnaces to oil burners — and Section 18-392, which requires a building permit for a hoop house by name.

The Building Department at 730 Washington Avenue administers and enforces the city and state building, heating, plumbing and electrical codes, issues permits, inspects construction and investigates violations, with the Chief Building Inspector leading the office.

This guide covers the City of Racine. Mount Pleasant, Sturtevant, Caledonia and the county's Development Services office are separate authorities — the county handles shoreland, sanitary and unincorporated zoning, none of which reaches inside the city.

📜

Permits here come with a clock. Under Section 18-93, printed on the city's own application forms, every building permit is valid for eighteen months from the date of issuance. Let it lapse mid-project and you are back at the counter — and work started without a permit may draw double permit fees.

What requires a building permit in Racine?

Wisconsin splits construction into two statewide instruments, and neither one is a city invention. One- and two-family homes run on the Wisconsin Uniform Dwelling Code (SPS 320 to 325), a code Wisconsin wrote for itself — the state never adopted the International Residential Code, so IRC chapter references from other states simply do not apply here. Everything that is a public building or a place of employment, including any residential building of three or more units, runs on the Wisconsin Commercial Building Code (SPS 361 to 366), which moved to the 2021 I-codes effective September 1, 2025; plans submitted on or after November 1, 2025 must comply with the 2021 editions. Under Wis. Stat. 101.65(1c) and 101.02(7r)(a), Racine may not enforce different technical standards — local ordinances must strictly conform to the state codes.

Typically permit required

  • New buildings, additions, alterations and repairs within Chapter 18's scope, on both tracks
  • Hoop houses — a permit category of their own under Section 18-392
  • Plumbing, electrical and HVAC work under Section 18-393 trade permits
  • Mechanical appurtenances under Division 6 — furnaces, boilers, gas and oil appliances, air conditioning and refrigeration systems
  • Moving or securing damaged and unsafe buildings, which Chapter 18 regulates expressly

Often exempt

  • Ordinary maintenance and finishes that do not alter structure or systems
  • Work below Chapter 18's stated thresholds — confirm the current lines with the Department
  • Buildings used for farming — exempt from the state code under Wis. Stat. 101.05(5), with farming defined by DSPS rule; a produce stand stays exempt only while the farmer raised substantially all of what it sells
  • Primitive rural hunting cabins — carved out of municipal jurisdiction by Wis. Stat. 101.65(1g)
  • Bed-and-breakfast establishments as defined by statute (Wis. Stat. 101.05(2))

What is actually local, and what is not

Racine adopts the state codes at Section 18-30 and cannot vary their technical content; what Chapter 18 adds is administration with teeth. The eighteen-month permit life, the hoop-house category, reinspection fees set by ordinance and the double-fee posture on unpermitted work are all local law layered on the statewide standards.

Who handles permitting in Racine?

The Building Department, led by the Chief Building Inspector, issues permits and inspects for the city. Racine holds second-class-city delegation covering commercial buildings of all sizes and contracts plan review to E-Plan Exam per the state's delegated-authority roster.

Racine permitting contact
DetailInformation
DepartmentCity of Racine Building Department
Counter730 Washington Avenue, Room 1, Racine, WI 53403
Phone(262) 636-9171 — department; (262) 636-9497 — Chief Building Inspector
Commercial plan reviewAll sizes via city delegation; performed by E-Plan Exam
Ordinance backboneMunicipal Code Chapter 18, Buildings and Building Regulations

Permit types

Residential permits

Houses run on the Uniform Dwelling Code with permits from 730 Washington Avenue. The city's forms carry the full state apparatus: the 101.65(1r) advisory that an uninsured or unbonded contractor may leave the owner exposed, the owner-occupier Cautionary Statement for those acting as their own general contractor, and the DHS 163 lead-safe block for pre-1978 buildings — triggered at six square feet of disturbed paint per room inside, twenty square feet outside, or any window work.

How Wisconsin contractor licensing works

Wisconsin has no state general contractor license for commercial work — the city's own forms note that 2013 Wisconsin Act 20 ended state building-contractor registration on July 2, 2013. For one- and two-family work the state requires a Dwelling Contractor certification on the business and a Dwelling Contractor Qualifier on an individual, and under Wis. Stat. 101.65(1m) Racine may not issue a building permit to a contractor who cannot produce them; owner-occupants are exempt. Electricians and plumbers are licensed statewide by DSPS. HVAC contractors only register with the state — there is no state HVAC license — which is exactly where local rules step in. Racine adds no municipal trade license; its local force is Chapter 18's administrative machinery, from the permit clock to the mechanical division.

Commercial permits

Commercial plans route through the city's all-size delegation with E-Plan Exam reviewing; approval precedes the permit and the fifty-thousand-cubic-foot seal-and-supervise requirements apply as everywhere in Wisconsin. The eighteen-month permit life applies to commercial permits the same as residential — phase long projects accordingly.

Mechanical work, and where the state reviews directly

Commercial plan review in Wisconsin is a two-step: under Wis. Stat. 101.12(3)(h) the plan approval comes first and the local permit cannot issue without it. The state review trigger is 25,000 cubic feet, plus categorical triggers at any size for schools, high-hazard occupancies and residential buildings of three or more units. At 50,000 cubic feet plans must be prepared, signed and sealed by a Wisconsin-registered design professional, with a supervising professional retained for construction observation. Commercial plumbing plans go to review at sixteen or more fixtures.

Racine permit costs and fees

Fees follow the adopted schedule with reinspection fees fixed by ordinance at Section 18-4. The number that catches people is not a fee at all — it is the calendar.

Racine fee reference points
ItemFee or rule
Permit lifeEighteen months from issuance, Section 18-93 — renew before it lapses
Unpermitted workDouble permit fees may be charged, per the city's forms
ReinspectionSet by ordinance under Section 18-4 — confirm the current figure
Trade and building feesPer the current adopted schedule at filing
⚠️

Pre-1978 buildings carry the lead-safe trigger. Disturb six square feet of paint in a room, twenty square feet outside, or any window in a pre-1978 dwelling or child-occupied building and DHS 163 lead-safe certification applies — the block is printed on Racine's own permit forms.

Trade permits and who may pull them

Trades are state-credentialed and permitted under Section 18-393, with the mechanical division adding its own permit requirements for heating and refrigeration equipment.

Permit required

  • Electrical — state license; city permit under Chapter 18
  • Plumbing — state license; city permit
  • HVAC and mechanical — state registration; Division 6 permits for furnaces, boilers, gas and oil appliances, and air conditioning systems
  • One- and two-family general work — state Dwelling Contractor plus Qualifier, or the owner's Cautionary Statement

Typically exempt

  • Owner-occupants within the state exemptions, Cautionary Statement signed
  • Maintenance below Chapter 18 thresholds

How to apply for a Racine building permit

1. Confirm the parcel is city, not county

Mount Pleasant, Sturtevant, Caledonia and county Development Services are separate counters.

2. Scope against Chapter 18

Check the named categories — including Section 18-392 if the project is a hoop house.

3. Assemble credentials and statements

State trade licenses, Dwelling Contractor papers or the owner's Cautionary Statement, lead-safe certification where DHS 163 triggers.

4. File at 730 Washington Avenue

Standard application plus construction plans and site survey.

5. Calendar the permit clock

Eighteen months from issuance under Section 18-93 — renew before expiry on long projects.

6. Close out inspections

Through final, with reinspection fees set by ordinance if a visit fails.

Review, corrections and what actually causes delay

Racine's review moves at the pace of a complete submittal; the local failure mode is temporal, not technical — projects that drift past the eighteen-month line and lapse mid-build. Phase the permit strategy on anything long, and renew before Section 18-93 runs out.

Inspections in Racine

The Department inspects building and trade work through final, investigates violations, and charges ordinance-set reinspection fees for failed visits. Unsafe and damaged buildings have their own Chapter 18 provisions, including on moving them.

Racine permit search and official resources

Frequently asked questions

How long is a Racine permit good for?

Eighteen months from the date of issuance, under Section 18-93 — it is printed on the application forms. Renew before it lapses on long projects.

Does a hoop house really need a building permit?

Yes — by name. Section 18-392 of the Municipal Code requires building permits for hoop houses.

What happens if work starts without a permit?

The city's forms warn that any work done without permits may result in double permit fees.

Who reviews commercial plans?

The city holds all-size second-class-city delegation and contracts the review to E-Plan Exam, so plans stay in the city's process.

When do lead-safe rules apply?

In pre-1978 dwellings and child-occupied buildings: at six square feet of disturbed paint per room, twenty square feet of exterior paint, or any window work, DHS 163 certification applies.

Which code governs my house project?

The Wisconsin Uniform Dwelling Code, SPS 320 to 325. Wisconsin never adopted the International Residential Code.

Simplify Racine permitting with Alliance Permitting

Racine is administered by ordinance and calendar. We scope against Chapter 18's named categories, file complete at 730 Washington Avenue, and manage the eighteen-month clock — renewals included — so the permit outlives the project instead of the other way around.

Ready to break ground in Racine sooner?

Send us the scope and the parcel. We confirm the review path with the Racine Building Department, assemble the submittal, file it, and track it through issuance — corrections included.