Lewis County, West Virginia Building Permit Guide

Lewis County publishes no building permit of its own: its Floodplain Administration office reviews new development for flood risk, the Health Department permits septic systems, and Weston permits building inside the city.

Authority: Lewis County Floodplain AdministrationBuilding permits: City of Weston onlyPhone: 304-269-6567
County role
Floodplain determinations201 Orchard Street, Weston
Weston permit fee
$25 + $10 per $1,000Up to 3 business days
Septic permits
Lewis County Health Department304-269-8218
2025 population
16,394U.S. Census Vintage 2025

Lewis County has no building permit of its own; for land outside Weston, the county Floodplain Administration office makes floodplain determinations for new development and the Lewis County Health Department permits septic systems. Inside Weston, the City’s Building Inspector issues permits for $25 plus $10 per $1,000 of job cost, and approval can take up to 3 business days.

What needs a permit in Lewis County?

The county publishes no building permit of its own; its permitting role is floodplain management. The Lewis County Floodplain Administration office makes floodplain determinations for new development, keeps the county’s flood maps and records of past floods, and advises on safer land use. Septic systems are permitted by the Lewis County Health Department.

Unincorporated county and Jane Lew

  • Floodplain determination for new development from the county Floodplain Administration office
  • Construction permit for a new, modified or repaired septic system from the Health Department

City of Weston

  • Building permit for new construction, remodels, additions, accessory buildings, demolition, and electrical, plumbing, mechanical and sign work
  • Floodplain approval by the City’s Floodplain Administrator
  • Permit for excavation or work in the City right of way

Short on time to read all of this?

Get a free quote →

Who issues permits in Lewis County?

Lewis County permit contacts
OfficeContact
Lewis County Floodplain Administration201 Orchard Street, Weston, WV 26452; 304-269-6567
Lewis County Commission office110 Center Avenue, Weston; 304-269-8200; Monday–Friday 8:00 a.m.–4:00 p.m.
Septic permitsLewis County Health Department, 125 Court Avenue, Weston; 304-269-8218 (after-hours emergencies 304-269-8241); Monday–Friday 8:00 a.m.–4:00 p.m.
City of Weston building permitsMunicipal Building, 102 W. 2nd Street, Weston; 304-269-6141

Both towns in the county:

  • Weston (3,736 residents): one City official serves as Building Inspector, Code Official, Zoning Officer and Floodplain Administrator, and issues the City’s building permits from the Municipal Building.
  • Jane Lew (395): the state’s floodplain contact list shows Lewis County’s floodplain office covering the town; the town publishes no building permit rules online, so ask town hall before building.

Permit types

  • County floodplain determination: the Floodplain Administration office checks new development against the flood maps.
  • Septic construction permit: issued by the Health Department after a Sanitarian approves the site and the installer’s proposed system.
  • Weston building permit: one application covering new construction, remodels and additions, single-family, multi-family, apartment, commercial and industrial buildings, accessory buildings, demolition, and electrical, plumbing, mechanical and sign work. It can be emailed or handed in at the Municipal Building.
  • Weston right-of-way permit: for excavation or other work in a City street or right of way.

Fees

Lewis County and Weston permit fees
PermitFee
Weston building permit$25 plus $10 for each $1,000 of job cost
Septic system, conventional single-family$222
Septic system, all other types$450
Septic tank modification, tank only$140
Septic modification, lines only$110

Not sure this scope needs a permit?

Get a free quote →

Weston bases the fee on the value of all materials and labor, rounded to the nearest dollar. Health Department sewage system permits are valid for one year from issue.

⚠️ Fees under review: Weston City Council’s August 3, 2026 agenda included “waiving various fees related to flood relief” after the July 21–22 flood, and the minutes are not posted; separately, the Lewis County Board of Health has proposed new environmental health fees to take effect January 1, 2027, with the draft schedule open for comment at the department. Ask the City and the Health Department which fees apply to your job.

Electrical, plumbing and HVAC work

In Weston, electrical, plumbing and mechanical work goes on the City building permit application, which also has a box for electrical inspection, and the City inspects electrical and plumbing work. The application lists the contractor’s West Virginia licence number and City business licence number, and the City checks that city fees and B&O taxes are current. The county publishes no trade permit for land outside Weston.

What to submit

  • Weston building permit: the applicant’s details, the physical address and description of the work, plans for all contractors’ work, the total job cost, whether the site is in a flood area, contractor and subcontractor licence numbers, and a copy of the contract if there is one.
  • Septic permit: an on-site sewage system application completed by the owner or a certified installer after the installer’s percolation test and site evaluation.
  • Floodplain determination: the location of the new development, checked against the county’s flood maps.

Rather talk it over?

Call 1-855-478-4290 →

How to get permits in Lewis County

1. Check the location

Inside Weston, apply to the City; elsewhere, start with the county Floodplain Administration office.

2. Get a floodplain determination

Ask the floodplain office at 201 Orchard Street whether the site is in a flood area.

3. Hire a certified septic installer

Where there is no public sewer, the installer tests the soil and proposes the system.

4. Apply to the Health Department

Submit the sewage system application; a Sanitarian visits and then issues the construction permit.

5. File the Weston permit

In Weston, email or hand in the building permit application and allow up to 3 business days.

6. Call for inspections

Have the septic system inspected before it is covered, and in Weston book footing, foundation, electrical and plumbing inspections.

Inspections

Weston requires inspections of footings, foundations, electrical and plumbing work, scheduled with the City’s Building Inspector, and its permits expire six months after issue. For septic systems, the installer must call the Health Department when the system is finished but before it is covered, so the Sanitarian can check it against the approved plan; any change to that plan during construction must be cleared with the department first.

Rather not deal with the Lewis County building department?

Get a free quote →

Local details that matter in Lewis County

Comprehensive plan: the Lewis County Planning Commission posted a draft comprehensive plan for public comment and then sent the County Commission a resolution approving it, which was on the Commission’s agendas from September 22 to October 6, 2026. The plan’s action items include updating the county floodplain ordinance, and Jane Lew has said it is interested in adopting the county plan as its own.

Home sales with septic: for a Health Department home loan evaluation, the house must have been occupied for the last 30 days and the tank not pumped in the last 30 days; the Sanitarian returns after 2 days to look for dye at the surface, and the tank must be pumped if that has not been done in the last 3 years.

Weston facade grants: the City runs a 2026 facade grant program, with its own application packet on the City forms page.

West Virginia building code

West Virginia lets each county and city adopt the State Building Code or no building code at all; no other building code may be adopted, and floodplain, sewage and fire rules can apply either way. West Virginia rules

Official Lewis County permitting resources

Official Lewis County, health department and City of Weston pages used for permits.

Want this handled start to finish?

Get a free quote →

Lewis County permit FAQs

Inspections are where schedules slip.

Get a free quote →

Does Lewis County issue building permits?

The county publishes no building permit; its role is floodplain determinations for new development, and Weston issues its own building permits.

How much is a building permit in Weston?

$25 plus $10 for each $1,000 of job cost, and approval can take up to 3 business days.

Who issues septic permits in Lewis County?

The Lewis County Health Department, 125 Court Avenue, Weston (304-269-8218); a conventional single-family system permit is $222 under the current schedule.

Who handles floodplain questions in Jane Lew?

The Lewis County Floodplain Administration office (304-269-6567), which the state lists as covering the town.

How long is a Weston permit valid?

Six months from the date it is issued.

Simplify Lewis County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in West Virginia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Lewis County sooner?

Let Alliance prepare, file, and track your Lewis County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Lewis County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.