Hampshire County, West Virginia Building Permit Guide

Hampshire County enforces the West Virginia State Building Code, and its Planning Office in the Old Jail on North High Street in Romney issues building permits, reviews plans and inspects new homes outside Romney and Capon Bridge.

Authority: Hampshire County Planning OfficeCode: State Building Code, 2018 IRC (Ord. PC 25-02)Phone: 304-822-7018
Authority
County Planning Office90 N. High Street, Romney
Permit fee
$25 up to $12,500Over $12,500: $2 per $1,000
Inspections
Booked via the Planning OfficeFooting to final, then a CO
2025 population
24,105U.S. Census estimate

Hampshire County is one of the West Virginia counties that has adopted the State Building Code: its Planning Office issues building permits, reviews plans, inspects the work and issues the Certificate of Occupancy. The permit fee is $25 for work valued up to $12,500 and $2 per thousand for work valued over $12,500, paid with a separate check for inspection fees.

What requires a permit in Hampshire County?

The county’s packet says building permits are required for all improvements made on a property, and lists:

Homes

  • New homes: stick-built, log or other construction, modular, double-wide and single-wide
  • Additions
  • Remodels and renovations
  • Replacement windows and doors that need structural or header changes
  • Changing roofing material, for example shingles to metal

Other structures

  • Decks and porches
  • Garages, carports, barns, lean-tos and sheds
  • Pavilions and bridges
  • Signs
  • Pools and hot tubs
  • Privacy and stockade fencing

Under Ordinance PC 25-02 the building code does not apply to buildings used mainly for agriculture, including agritourism, and permit fees are waived for exempt agricultural and church buildings. When the Planning Office cannot tell whether a building qualifies, the owner asks the West Virginia Commissioner of Agriculture for a ruling.

Who issues building permits in Hampshire County?

All permit documents and fees, including the inspection packet, go to the Hampshire County Planning Office. Jarrett Hott is the county’s Code and Compliance Official and Floodplain Administrator, and the Town of Romney’s ordinance describes county inspections as done by a certified inspector employed by the County. The office also handles floodplain permits, and the Planning Commission meets on the third Wednesday of each month.

The County Commission adopted the Hampshire County Unified Building Permit Ordinance on February 10, 2026; at its first reading the Planning Office described it as setting down the permit process the office already used. The building code itself is adopted by Ordinance PC 25-02.

Short on time to read all of this?

Get a free quote →
Who permits where in Hampshire County
AreaWho issues permits
Unincorporated Hampshire CountyHampshire County Planning Office, the Old Jail, 90 N. High Street, Romney (mail: PO Box 883, Romney, WV 26757); 304-822-7018; Monday to Friday, 8 a.m. to 4 p.m.
RomneyTown of Romney issues the permit; the County Planning Office inspects under a cooperative agreement. Town office, 340 East Main Street, 304-822-5118
Capon BridgeTown Council reviews a building application; the Town’s code inspector is Middle Department Inspection Agency. Town office, 304-856-3625
Septic systems and wellsHampshire County Health Department, 16189 Northwestern Turnpike, Augusta; 304-496-9640

Hampshire County permit packages

The Planning Office publishes a separate application packet for each kind of job:

  • Residential building (new homes)
  • Residential additions
  • Deck, porch or attached carport
  • Mobile, modular or manufactured building
  • Outbuildings
  • Roofs
  • Electric

Each packet holds the Hampshire County Building Permit Application, a site plan sheet that is required for every application, and an Affidavit of Exemption for owners doing their own work or contractors without employees. The new-home packet adds a Single Family Dwelling Construction Detail Form that answers the plan reviewer’s questions about footings, framing, stairs, egress windows, smoke alarms and wiring.

Hampshire County permit costs and fees

The permit application fee is based on the current market value of the construction.

Hampshire County building permit application fee
Cost of constructionFee
$0 to $12,500$25
Over $12,500$2 per thousand

Inspection fees are separate: the application form has its own inspection fee line, and the packet asks for two checks, one for the permit and one for inspections, both payable to the Hampshire County Sheriff. All application fees are non-refundable.

Not sure this scope needs a permit?

Get a free quote →

Electrical, plumbing and mechanical work

The county applies the trade codes adopted with the State Building Code in Ordinance PC 25-02: the 2018 International Plumbing, Mechanical and Fuel Gas Codes and the 2020 National Electrical Code, with the 2018 International Residential Code for homes. Plumbing and electrical work is inspected under the county building permit (plumbing under the slab, rough-ins at framing, and the final), and the office publishes a separate Electric Building Application Packet. For energy, homes follow the 2015 International Energy Conservation Code and commercial buildings ASHRAE 90.1-2013.

Hampshire County application documents

Always

  • Building Permit Application
  • Site plan with all buildings, wells, septic systems, driveways and setbacks, drawn to scale or dimensioned
  • List of all contractors with WV contractor licence numbers, or an Affidavit of Exemption
  • Permit fee and inspection fee, paid on submittal

When it applies

  • Septic permit for new homes and bedroom additions
  • Well permit for new homes
  • Public Service District letter of availability for public water or sewer
  • Plat showing the building site when any of the property is in the 100-year floodplain
  • Flood Elevation Certificate from an engineer or surveyor when the site is in or too close to the floodplain
  • Plans to the 2018 IRC and 2020 NEC with the Construction Detail Form for new homes

The septic permit is not needed for additions without bedrooms or bathrooms, chicken houses or non-residential barns and outbuildings, and the well permit is waived for wells that existed before July 1, 1986. Where a septic or well permit is needed, it must be in hand before you apply, even if the system is not yet installed.

How to apply: 6-step Hampshire County process

1. Get water and wastewater approvals

Well and septic permits from the Hampshire County Health Department, or an availability letter from Central Hampshire PSD (304-496-8882).

2. Draw plans to the county code

Homes are designed to the 2018 IRC and 2020 NEC; ask the Planning Office which details belong on the plans.

3. Submit the packet

Bring the application, site plan, contractor list, inspection application and both fee checks to the Planning Office.

4. Answer plan review questions

The office reviews the plans and asks for more information if needed.

5. Post the permit and start within 6 months

The permit expires if work has not begun within 6 months; ask for an extension before the expiration date.

6. Call each inspection

Footers, foundation, framing, plumbing, electrical and final, then the Certificate of Occupancy.

Rather talk it over?

Call 1-855-478-4290 →

Hampshire County inspections

The permit applicant or an authorized agent schedules every inspection through the Planning Office (304-822-7018), and the county asks you not to book one until the work is ready. The permit must be posted where it can be seen from the road, and the approved plans, stamped “Subject to Field Approval”, must be on site for each visit.

  • Footing: after forming, before concrete is placed.
  • Foundation: French drain and waterproofing before backfill, and the seal plate before framing.
  • Plumbing under slab: before the floor is poured; it can be combined with the foundation inspection.
  • Framing: before insulation, after heating, plumbing and wiring rough-ins are in and plumbing is pressure tested.
  • Wallboard: where fire-rated construction is required.
  • Final: building, plumbing and electrical, before occupancy.

The Certificate of Occupancy is issued once every inspection has passed. If a permit expires, a new application must be approved before work can resume.

Romney, Capon Bridge and floodplain rules

Romney: under the Town’s Unified Building Permit Ordinance (No. 2025.10.20, amended November 10, 2025), building permits are issued through the Town, which collects fees on the county Planning Office schedule and passes all inspection fees to the county. The Town reviews applications within 10 business days, and county inspectors carry out inspections within 10 business days of a request. Exempt projects that add a structure still need a notice of work and an exemption placard, and permits lapse if work does not start within 180 days. Applications can be emailed to the Town office with supporting documents.

Rather not deal with the Hampshire County building department?

Get a free quote →

Capon Bridge: any construction inside town limits needs a Building Application under Town Ordinances 15 and 17, presented to Town Council with a drawing and a description of materials. Remodels and structural changes are inspected by the Town’s code inspector, Middle Department Inspection Agency. Council meets on the second Tuesday of each month at 7 p.m. The state’s floodplain manager list (October 2025) shows Capon Bridge’s floodplain management handled by the county Planning Office (304-822-7018).

Floodplain: the county’s adopted floodplain ordinance dates from 1987 and was amended through 2008. A building site in the 100-year floodplain must comply with that ordinance before the permit is issued: the structure is elevated on a foundation designed and certified by a professional engineer, or properly vented.

⚠️ Changes on the table: the County Commission’s October 13, 2026 agenda listed a Planning Commission request to amend the Building Permit Ordinance and the first reading of a new 2026 Floodplain Ordinance, whose draft adds a flat floodplain determination fee plus a value-based fee in mapped flood areas. Fees and procedures may change once these are adopted.

Appeals: Ordinance PC 25-02, including its five-member Board of Appeals for building code decisions, runs until August 1, 2027 unless the County Commission amends it.

West Virginia building code

West Virginia lets each county and city adopt the State Building Code or no building code at all; no other building code may be adopted, and floodplain, sewage and fire rules can apply either way. West Virginia rules

Want this handled start to finish?

Get a free quote →

Official Hampshire County permitting resources

Inspections are where schedules slip.

Get a free quote →

Hampshire County permit FAQs

Who issues building permits in Hampshire County?

The Hampshire County Planning Office in Romney, for land outside the towns. Romney issues its own permits with county inspections, and Capon Bridge reviews building applications at Town Council.

How much is a building permit in Hampshire County?

$25 for construction valued up to $12,500 and $2 per thousand when the value is over $12,500, plus a separate inspection fee. Both are paid by check to the Hampshire County Sheriff.

Which building code does Hampshire County use?

The West Virginia State Building Code adopted by Ordinance PC 25-02 in June 2025, including the 2018 International Residential Code and the 2020 National Electrical Code.

Do I need a permit to put a metal roof on my house?

Yes, when you change roofing material, for example from shingles to metal. The county has a separate roof permit packet.

Do I need a septic permit before applying?

For a new home or a bedroom addition, yes: the septic permit from the Hampshire County Health Department must be in hand when you apply, even if the system is not yet built.

Who schedules inspections?

The permit applicant or an authorized agent, through the Planning Office at 304-822-7018, once the work is ready.

Are farm buildings exempt?

Buildings used mainly for agriculture, including agritourism, are exempt from the building code under Ordinance PC 25-02, and their permit fees are waived.

Simplify Hampshire County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in West Virginia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Hampshire County sooner?

Let Alliance prepare, file, and track your Hampshire County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Hampshire County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.