Building permits in Sandy are issued by the city’s Building & Code Compliance Division, part of Community Development at 10000 South Centennial Parkway, Suite 210 (801-568-7250, Monday to Friday 8 a.m. to 5 p.m.), and every application, payment and inspection request goes through the Sandy Cityworks portal. Fees are flat amounts by valuation band in the FY 2027 adopted budget — $4,866 for a new house valued at $100,000 to $500,000 — plus plan review at 65% of the permit fee and a 1% state charge. Sandy sits on the east side of the Salt Lake Valley, bordered by cities that permit their own work and by White City, which is served by the Municipal Services District.
Work inside Sandy city limits. White City next door is served by the Municipal Services District.
In Sandy, checking the city ordinance is not enough. The Legislature writes construction code amendments for a few named cities directly into the state construction code, and two sections apply to Sandy: Utah Code 15A-4-107 amends the building code and 15A-4-207 amends the residential code. Both require ignition-resistant construction in the areas Sandy designates as wildland-urban interface, as the Fire Marshal determines.
What requires a permit in Sandy?
The Sandy City Building Division issues building permits for work inside Sandy city limits. Sandy sits on the east side of the Salt Lake Valley between Midvale, Draper, Cottonwood Heights and White City, the last of which is served by the Municipal Services District rather than a city department of its own.
Sandy is one of the jurisdictions the Legislature has singled out. Rather than leaving every city to write its own local amendments, the Legislature has codified amendments for specific named jurisdictions directly into the state construction code, in Title 15A, Chapter 4 of the Utah Code. Where that applies, a city’s construction amendments sit in the Utah Code rather than in its municipal ordinances — so the instinct to look only at the city ordinance can miss the governing text entirely. Sandy City has its own sections: Utah Code 15A-4-107 amends the building code and 15A-4-207 amends the residential code for Sandy. Park City and Salt Lake City also have building or residential code sections, and South Jordan has a plumbing code section (15A-4-303). Section 15A-4-107 requires an NFPA 13 sprinkler system in buildings of any occupancy where the fire flow exceeds 2,000 gallons per minute (one- and two-family homes and town homes excepted, subject to the state fire code), and adds an appendix requiring ignition-resistant construction in the city’s wildland-urban interface areas, using the 2006 International Wildland-Urban Interface Code to rate fire hazard severity. Section 15A-4-207 adds the same ignition-resistant requirement to the residential code as Section R324.
Permit required
- All construction within Sandy City, including electrical, gas, mechanical and plumbing systems, apart from the listed exemptions
- New single-family homes, townhomes and duplexes, additions, remodels and basement finishes, and basement egress doors
- Detached garages, pergolas, shops and other accessory buildings over 200 square feet; decks and covered patios
- Exterior finish, windows, doors and re-roofs; swimming pools and spas; demolition; grading
- Fences 7 feet and over; furnace, air conditioner, water heater and gas line work; electrical service upgrades, generators, solar and battery storage
- Commercial new buildings, additions, tenant improvements, apartments, trade work and telecom
No building permit
- Fences not over 7 feet high
- One-story detached tool and storage sheds, playhouses and similar buildings up to 200 square feet, which still have to meet setbacks
- Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work
- Prefabricated above-ground pools less than 24 inches deep and not over 5,000 gallons
- Retaining walls not over 4 feet high
- Sidewalks and driveways, which need a Public Works permit instead
Utah adopts one construction code for the whole state; cities and counties enforce it, and any local amendments are set by the Legislature. Utah rules
Sandy building department: who handles permitting
The Building & Code Compliance Division handles permit applications and inspections. Its permit page lists the city’s permit types, each with its own requirement sheet, and names the code editions in force: the 2021 IRC, the 2024 IBC, IFC, IPC, IMC, IFGC, IEBC and IECC, the 2023 NEC and ICC A117.1-2009. Applications, document uploads, fee payments and inspection requests all go through Sandy Cityworks; once an application is received, staff review it and contact the applicant about any deficiencies and the payment due. Planning and zoning questions go to the Planning Division at 801-568-6058.
Sandy is also an inspection provider beyond its own boundary. It is one of three jurisdictions named in the Greater Salt Lake Municipal Services District's mutual aid agreement for building inspection services, alongside West Valley City and West Jordan. Under that arrangement Sandy inspectors may cover the district's service area when the district cannot fulfil an inspection request with three or more days' notice — arranged through the district's own inspectors first.
Geography shapes the eastern half of the city. Sandy runs from the valley floor up onto the bench and toward Little Cottonwood Canyon, so slope, seismic and geotechnical conditions vary across the city. The new-home requirements call for a geotechnical report where the lot slopes more than 15%, and lots in the Sensitive Area Overlay (areas of 30% slope) follow special grading-plan requirements.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Authority | Sandy City Building & Code Compliance Division, 10000 Centennial Parkway, Room 210, Sandy, UT 84070 |
| Phone | 801-568-7279 (permit questions); Community Development front desk 801-568-7250, Monday to Friday 8 a.m. to 5 p.m. |
| Portal | Sandy Cityworks: applications, uploads, fees, inspection scheduling and cancellation |
| Governing code | 2021 IRC, 2024 IBC and companion codes, 2023 NEC |
| City amendments | Utah Code 15A-4-107 (building) and 15A-4-207 (residential) |
| Fees | FY 2027 adopted budget fee schedule |
| Mutual aid | Named as an inspection partner for the Municipal Services District |
| Mutual aid trigger | Where the district cannot inspect with three or more days' notice |
| Third-party route | Available where the city cannot inspect within three business days |
| Design conditions | Geotechnical report on lots over 15% slope; Sensitive Area Overlay grading rules at 30% slope |
| Contractor licence | Utah DOPL, with qualifiers on several classifications |
| Neighbours | White City is served by the Municipal Services District |
Sandy borders a community that is not a city department. White City, immediately adjacent, is served by the Greater Salt Lake Municipal Services District rather than by its own building department, so an address a few streets away can go to an entirely different organisation. Draper, Midvale, Cottonwood Heights and South Jordan each permit their own work.
In 2025, building permits issued in Sandy authorized 25 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.
Sandy permits: record types and what each covers
The record catalog follows Sandy’s own permit-type list, and two of the governing amendments are published in the Utah Code rather than the city code.
Residential permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New construction | New dwellings, additions, and accessory structures above the local size threshold | Plan review against the state-adopted 2021 International Residential Code with Utah amendments, plus zoning and setbacks | Valuation-based |
| Addition | Added conditioned or unconditioned space attached to an existing dwelling | Structural and energy review; since 1 July 2026 houses follow Utah's own energy chapter in the residential code, with one set of insulation values statewide | Valuation-based |
| Renovation / alteration | Structural changes, layout changes, or added plumbing, mechanical, or electrical | Plan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not move | Valuation-based |
| Reroof | Roof covering replacement, recover, and structural deck repair | Deck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural check | Valuation or squares |
| Solar photovoltaic | Rooftop or ground-mount arrays, with or without battery storage | Single local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in Utah | Flat or system-size based |
| Battery energy storage | Wall or floor-mounted storage added to a dwelling | Electrical review plus fire separation, ventilation, and location check | Flat or per-permit minimum |
| Electrical | Service changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiring | Local trade review and local inspection against the 2023 National Electrical Code, which applies statewide | Per-permit or per-device |
| Plumbing | New piping, repipes, fixtures, gas piping, and water heater replacement | Local trade review; performed by a contractor holding the matching state licence classification and qualifier | Per-permit minimum or per-fixture |
| Mechanical / HVAC | Changeouts, new ductwork, and refrigeration | Local trade review; changeout volume is heavy given Utah heating loads and wide seasonal swings | Per-permit minimum or per-unit |
| Patio cover and shade structure | Attached and detached covers, ramadas, and carports | Structural review for wind uplift and attachment, plus zoning for setbacks and lot coverage | Valuation or flat |
| Swimming pool | In-ground and above-ground pools and spas | Barrier, bonding, and electrical review; the state code adopts the residential provisions of the 2024 International Swimming Pool and Spa Code | Valuation or flat |
| Manufactured home set-up | Placing or re-siting a manufactured or modular home | Federal HUD label for manufactured homes or a state decal for modular units, with local zoning, floodplain, foundation, and utility connection review | Flat or per-unit |
| Demolition | Full or partial demolition of a dwelling or accessory structure | Utility disconnect confirmation, dust control where earthmoving is involved, and site restoration check | Flat |
| Geotechnical investigation | Bench and canyon-adjacent parcels | Slope and seismic conditions can require engineered foundations | A design cost |
| Utah Code amendments | Any project before design begins | Sandy’s sprinkler and wildland-urban interface amendments are in Utah Code 15A-4-107 and 15A-4-207 | No fee |
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New commercial construction | Ground-up commercial, industrial, and institutional buildings | Concurrent review against the state-adopted 2024 International Building Code with Utah amendments, plus fire and zoning | Valuation-based |
| Tenant improvement / upfit | Interior fit-out of an existing tenant space | Building, trade, and life-safety review; accessibility attaches on change of use | Valuation-based |
| Change of occupancy | Converting a building or space to a different use group | Occupancy classification, egress, and accessibility review | Valuation or flat |
| Commercial electrical | Service, distribution, and branch circuit work | Local trade review and local inspection; Utah has no central state electrical permit for either residential or commercial work | Per-permit or valuation |
| Commercial plumbing | Process piping, fixtures, backflow, and grease waste | Local trade review; backflow and grease interceptor sign-off where applicable | Per-fixture or valuation |
| Commercial mechanical | Rooftop units, kitchen exhaust and hood systems, and refrigeration | Local trade review; hood and suppression systems draw fire review alongside mechanical | Per-unit or valuation |
| Commercial reroof | Roof covering replacement on a commercial structure | Deck, dry-in, and attachment inspection | Valuation or squares |
| Signage | Wall, ground, and illuminated signs | Zoning review for size and placement, plus electrical where illuminated | Flat or per-sign |
| Grading and drainage | Clearing, grading, and site work that alters drainage | Civil review of grading and drainage, separate from the building permit | Acreage or valuation |
| Dust control permit | Earthmoving, trenching, and construction dust on a qualifying site | Utah Division of Air Quality, not the building department; a fugitive dust control plan is required for qualifying sites larger than a quarter acre | Set by the Utah Division of Air Quality where a dust control plan is required |
| Commercial demolition | Full or partial demolition of a commercial structure | Utility disconnect, asbestos notification, dust control, and site restoration | Flat or valuation |
| Mutual aid inspection | The Municipal Services District's service area | Arranged through the district's own inspectors first | Per the agreement |
| Commercial building permit | New commercial construction and tenant improvement | Subject to the sprinkler and wildland-urban interface amendments in Utah Code 15A-4-107 | Per the city schedule |
Rather talk it over?
Call 1-855-478-4290 →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Residential
- Building and trade permits are issued and inspected by the same local authority
- There is no separate state electrical permit — electrical is a local record
- A state contractor licence in the correct classification is required, with a named qualifier where the classification demands one
- Properties on septic need on-site wastewater approval before ground is broken
Commercial — multi-discipline
- Concurrent review across building, trades, fire, and zoning
- Signed and sealed plans across every affected discipline
- The licensee's classification must match the actual scope of work
- Accessibility and life-safety review attach to any change of occupancy
Records you will actually see in Sandy
| Record | What it covers |
|---|---|
| Building permit | New construction, additions, remodels and alterations |
| Trade permit | Electrical, plumbing, mechanical and gas by the licensed contractor |
| Solar photovoltaic permit | Arrays, inverters and battery storage |
| Geotechnical review | On bench and canyon-adjacent parcels |
| Re-roof permit | Roof covering replacement and structural deck repair |
| Demolition permit | Removal of a building or structure |
| Mutual aid inspection | Provided to the Municipal Services District's area |
| Third-party inspection | Where the city cannot inspect within three business days |
| Certificate of occupancy | Once every required inspection is clear |
Solar permits in Sandy
Solar in Sandy is permitted and inspected by the city under Utah's statewide adopted editions. The FY 2027 schedule’s smaller residential solar category (printed “Solar <10,000 kW”) pays $372 for a system valued under $50,000. The Utah rule governing every trade here is the edition split: the building, plumbing, mechanical, fuel gas and energy codes moved to their 2024 editions in July 2026, while the residential code stayed on 2021 and the electrical code on 2023. Reading the building code year and inferring the electrical year gets rapid shutdown, labelling and conductor requirements wrong. On bench parcels the snow load and the seismic condition both bear on the attachment detail, and the seismic picture on the east side of the valley is not the valley-floor one.
Installing here? Alliance handles solar permit applications and the utility interconnection paperwork.
Roofing permits in Sandy
A residential re-roof is filed with the exterior finish, windows and doors permit type and costs $115 under the FY 2027 schedule; siding or stucco is also $115 and a window or door permit $70. Sandy runs from the valley floor onto the bench, so take the snow load for the actual site.
Solar and roofing work follow the statewide code, and utilities run interconnection on their own timeline. Utah rules
Roofing crews can hand this off: Alliance takes care of roofing permits through to the issued permit.
Sandy permit cost
Sandy prices residential and commercial permits as flat amounts for each permit type and valuation band, published in the fee schedule of the FY 2027 adopted budget. Plan review is added at 65% of the total permit fee, and a state charge of 1% of the total permit fee applies to all building fees.
Rather not deal with the building department?
Get a free quote →| Permit | Fee |
|---|---|
| New single-family home | $2,967 under $100,000 valuation; $4,866 for $100,000–$500,000; $6,837 for $500,000–$1,000,000; $8,569 to $2,500,000; $10,185 to $5,000,000; $12,572 above |
| New townhome or duplex | $2,237 under $100,000; $3,966 for $100,000–$500,000; $6,532 for $500,000–$1,000,000; $8,008 to $2,500,000 |
| Addition | $345 under $10,000; $527 to $50,000; $1,987 to $100,000; $2,867 for $100,000–$500,000; $4,584 to $1,000,000 |
| Basement finish | $169 under $5,000; $254 to $10,000; $296 to $20,000; $387 for $20,000–$500,000 |
| Remodel | $169 under $5,000; $254 to $10,000; $296 to $20,000; $430 to $100,000; $514 to $500,000 |
| Accessory building | $200 under 400 sq ft; over 400 sq ft from $524 (under $10,000 valuation) |
| Deck or covered patio | $375 |
| Swimming pool (in-ground) | $570 under $100,000; $965 above, plus a $2,500 pool bond |
| Re-roof; siding or stucco; window or door | $115; $115; $70 |
| Furnace/AC, water heater, plumbing, service upgrade, egress, generator | $105 each |
| Fence (printed “8 ft+”); retaining wall 4 ft and over | $160; $230 under $100,000 valuation |
| Demolition; grading | $70 each |
Worked example. A new house valued at $450,000 falls in the $100,000–$500,000 band: $4,866 for the permit, $3,162.90 for plan review at 65%, and $48.66 for the 1% state charge, or $8,077.56 before impact and utility fees.
| Item | Fee |
|---|---|
| Plan review | 65% of the total permit fee |
| State charge | 1% of the total permit fee |
| Re-inspection; other inspections with no listed fee | $70 each |
| Work without a permit | Investigation fee equal to the permit fee |
| Permit renewal or transfer | $70 |
| Power-to-panel bond (single lot) | $500 |
| Impact fees for a single-family home | Parks $6,988; storm water $1,354 per equivalent residential unit; fire/EMS $415; police $66 |
| Water connection/impact fee and meter set (3/4-inch meter) | $5,105 and $265 |
The city collects its own impact fees, and Sandy Public Utilities collects the water connection fee, its review fees and any meter-upgrade bond when it issues its final letter. Sewer service comes from one of four districts — Midvalley Improvement District, Sandy Suburban Improvement District, Cottonwood Sewer Improvement District or South Valley Sewer District — and the city publishes a sewer district map to find the right one.
Sandy trade permits
Sandy permits and inspects electrical, plumbing and mechanical work itself under the statewide editions, and stand-alone residential trade permits are flat $105 fees under the FY 2027 schedule.
Electrical permits
Required for service changes, panel work, new circuits, solar and EV charging. Sandy lists the 2023 NEC, and its permit documents include an electrical load calculation form; a new home lists the Rocky Mountain Power work order number as a deferred submittal.
Alliance handles electrical permit filing for contractors here. More on this: who pulls the electrical permit.
Plumbing and gas permits
Required for new piping, repipes, fixtures, water heaters and gas piping. Water heater and water softener replacements are $105 permits, and a new home needs a gas line schematic before its 4-way inspection.
Mechanical permits
Required for furnaces, boilers, air conditioning, heat pumps and ductwork. A furnace or air conditioner replacement is a $105 residential permit, and new homes submit Manual J, D and S heat loss calculations.
Geotechnical and structural
Not a trade permit, but the discipline the east side of the city most often demands. New homes need plans, a grading plan and structural calculations stamped by a Utah-licensed engineer, and a geotechnical report where the lot slopes more than 15%.
Contractors are licensed by the state Division of Professional Licensing, and a business licence must name a qualifier. Utah rules
Sandy application documents
Each permit type on the city’s list has a requirement sheet, and every document listed as required must be uploaded before the permit is processed. For a new single-family home the sheet asks for:
- A combined plan set (architectural, mechanical, plumbing, electrical and structural) stamped by a Utah-licensed engineer
- A site and grading plan and structural calculations, both stamped
- A Res-Check and Manual J, D and S heat loss calculations
- Square footage entered in the online application: finished space above grade, finished and unfinished basement, garage and deck or covered patio
- A full SWPPP and NOI, not needed to start review but required before excavation
- The owner-builder form if the owner is acting as contractor
- Deferred items: the Rocky Mountain Power work order number, a gas line schematic before the 4-way inspection and a blower door test before the final
Want this handled start to finish?
Get a free quote →Detached accessory buildings need combined plans and a scaled site plan, with plans stamped by a Utah engineer when the building exceeds 750 square feet or has walls over 10 feet. Other city forms include the special testing agreement, the floodplain development permit, the sensitive area overlay requirements, the utility release list for building in a public utility easement and the contractor information form. A lot without sewer service needs an onsite wastewater (septic) permit from the Salt Lake County Health Department before construction.
Sandy permit application: how to apply step by step
Here is how to get a building permit in Sandy, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.
White City next door is served by the Municipal Services District, and Draper, Midvale, Cottonwood Heights and South Jordan permit their own work.
Read Utah Code 15A-4-107 and 15A-4-207 with the city code: they add the fire-flow sprinkler rule and ignition-resistant construction in Sandy’s wildland-urban interface areas.
Sandy lists the 2021 IRC, the 2024 IBC and companion codes and the 2023 NEC. Keep the residential and electrical editions straight against the building, plumbing and mechanical codes.
Lots sloping more than 15% need a geotechnical report, and lots in the Sensitive Area Overlay follow its grading-plan requirements.
Create a Sandy Cityworks account (activated by email), pick the permit type, upload every required document and pay through the portal once staff send the amount due. Clear the Public Utilities SWPPP and grading items before any site work starts.
Schedule and cancel inspections from the Choose Actions menu in Cityworks, keep the permit and approved plans on site, and submit the gas line schematic and blower door test when the 4-way and final come up.
Inspections in Sandy
Inspections are scheduled, and cancelled, in Sandy Cityworks against the issued permit, using the Choose Actions menu on the case; the same screen shows the case status. A re-inspection costs $70 under the FY 2027 schedule. Sandy’s inspectors also cover the Municipal Services District’s service area under the mutual aid agreement when the district cannot fulfil a request with three or more days’ notice.
New homes carry inspection milestones written into their requirement sheet: the gas line schematic is due before the 4-way inspection and a blower door test before the final. Townhomes and commercial buildings use the city’s certificate of occupancy sign-off forms, and a $500 power-to-panel bond applies to a single lot.
Close-out follows the ordinary sequence to the certificate of occupancy once every required inspection has passed. Projects that need special inspections sign the city’s special testing agreement.
Utah law lets you use a third-party inspection firm when the building department cannot inspect within three business days. Utah rules
Sandy permit search and official resources
These are the primary Sandy and Utah sources behind this guide. Two of the amendments that govern Sandy projects are in the Utah Code, listed below with the city’s pages.
- Sandy City building permits
- Utah Code Title 15A, State Construction and Fire Codes Act
- Utah Code Section 15A-2-103, adopted code editions
- Greater Salt Lake MSD building permits and inspections, with its mutual aid notice
- Utah DOPL contracting
- Utah DOPL licence lookup
- Utah State Construction Registry
- Sandy Cityworks permit portal
- Sandy paperless permits and plans: account setup and scheduling inspections
- Sandy requirements: residential single-family dwelling (new)
- Sandy requirements: residential accessory building
- Sandy Public Utilities requirements for residential projects
- Sandy FY 2027 adopted budget, with the fee schedule
- Utah Code 15A-4-107, IBC amendments for Sandy City
- Utah Code 15A-4-207, IRC amendments for Sandy City
- Salt Lake County Health Department septic and onsite wastewater permits
Inspections are where schedules slip.
Get a free quote →Frequently asked questions
Why would Sandy's amendments be in state law?
Because the Legislature codifies construction code amendments for a few named jurisdictions directly in the state construction code. Sandy has two: Utah Code 15A-4-107 amends the building code and 15A-4-207 the residential code. Park City has both kinds, Salt Lake City has building code amendments and South Jordan a plumbing code amendment.
How much is a building permit in Sandy?
Sandy charges flat amounts by permit type and valuation band. Under the FY 2027 adopted budget a new house valued at $100,000 to $500,000 pays $4,866, plus plan review at 65% of the permit fee and a 1% state charge; a deck or covered patio is $375, a re-roof $115 and a water heater or furnace replacement $105.
Do I need a permit for a shed or fence in Sandy?
Not for a one-story shed or playhouse up to 200 square feet or a fence under 7 feet, but both still have to meet the Planning Division’s setbacks and rules, and larger accessory buildings need a building permit. Sandy’s permit list names fences 7 feet and over, its exemption list fences not over 7 feet, and the fee schedule prices “Fence (8 ft+)” at $160; ask the Building Division (801-568-7279) about a fence of exactly 7 feet.
Which codes apply?
Utah's statewide adopted editions under Title 15A. The building, plumbing, mechanical, fuel gas, energy, existing building and pool codes moved to 2024 editions in July 2026; the residential code remains 2021 and the electrical code 2023.
Does Sandy inspect outside the city?
Yes, under a mutual aid arrangement. The Greater Salt Lake Municipal Services District names Sandy City, West Valley City and West Jordan City in its agreement for building inspection services, triggered where the district cannot fulfil a request with three or more days' notice. Use must first be arranged with the district's inspectors.
Who permits White City?
The Greater Salt Lake Municipal Services District, not a city department of its own and not Sandy. It is one of several communities in the valley served that way, which is why an address a few streets from Sandy can go to a different organisation entirely.
Do bench parcels need extra engineering?
Often. Sandy runs from the valley floor onto the bench and toward Little Cottonwood Canyon, so slope, seismic and soils conditions vary substantially. A prototype that works on the valley floor may need geotechnical investigation and engineered foundations higher up.
How do I schedule or cancel an inspection in Sandy?
Open the case in Sandy Cityworks and use its Choose Actions menu, the same menu used to pay fees. A re-inspection is charged at $70.
Does a new house in Sandy need fire sprinklers?
Sandy’s building code amendment, Utah Code 15A-4-107, requires sprinklers where fire flow exceeds 2,000 gallons per minute but exempts one- and two-family homes and town homes except as the state fire code provides, and Public Utilities notes that fire sprinklers may be required on a new home depending on the fire flow at the site.
When can site work start on a new Sandy home?
Not on the building permit alone. Sandy Public Utilities has to approve the stormwater and grading items first, including a Common Plan SWPPP and the state NOI (allow up to five business days), before it issues its final letter and collects the water connection fees.
What happens if I build without a permit?
Sandy’s FY 2027 schedule adds a work-without-a-permit investigation fee equal to the permit fee, and the schedule also lists a $1,000 permit violation bond.
Is Sandy in Salt Lake County?
Yes, but the county does not permit it. Salt Lake County's unincorporated areas and several member communities are served by the Greater Salt Lake Municipal Services District; Sandy permits its own work through its Building Division.
Can an owner act as the contractor in Sandy?
Yes. Sandy’s new-home requirement sheet asks for the owner-builder form when the owner acts as the contractor. Otherwise the work is done by contractors licensed by the Utah Division of Professional Licensing.
Simplify Sandy permitting with Alliance Permitting
Sandy’s sprinkler and wildland-urban interface amendments are written into state law, Utah Code 15A-4-107 and 15A-4-207, not the municipal code. Alliance Permitting prepares, files and tracks Sandy permits through issuance.
Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Sandy because the work is done by people who have stood at the counter:
- We check the state construction code for city-specific amendments, not just the ordinance.
- We settle the geotechnical position early on bench and canyon-adjacent parcels.
- We separate Sandy from White City at the outset, since the latter is an MSD parcel.
- We keep the residential and electrical code split straight against the newer families.
Alliance Permitting is a permit documentation and expediting service in Utah. We are not a law firm and do not provide legal advice, and we are not the permitting authority.
Ready to break ground in Sandy sooner?
Let Alliance prepare, file, and track your Sandy permits while your crew stays on the job.
More Utah permitting guides
Salt Lake County building permits
Read guide →South Jordan building permits
Read guide →Millcreek building permits
Read guide →Sanpete County Building Permit Guide
Read guide →Santaquin Building Permit Guide
Read guide →Saratoga Springs Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Sandy permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.