Tredyffrin Township, Pennsylvania Building Permit Guide

To get a building permit in Tredyffrin Township, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Tredyffrin Township takes every building, stormwater, tree removal and contractor application through its Clariti online portal, invoices the fee after plan review, and has its plans checked and inspected by Barry Isett & Associates.

Authority: Tredyffrin Permits & InspectionsFiling: Clariti portal onlyPhone: 610-644-1400, press #4
Office
Permits & Inspections1100 DuPortail Road, Berwyn
Apply
Clariti portalMail and email no longer accepted
Payment
Invoiced after reviewPermit issued 24–48 hours after payment
Inspectors
Barry Isett & AssociatesElectrical: United Inspection Agency

Tredyffrin Township’s Permits and Inspections office at 1100 DuPortail Road, Berwyn, issues building, trade, stormwater and tree removal permits; its staff list is headed by Erin McPherson, Director of Planning and Zoning and Zoning Officer. Every application now goes through the township’s Clariti portal; nothing is paid at filing, because the applicant is invoiced once the plans are reviewed. Barry Isett & Associates is the appointed plan review and inspection agency for 2026, and the fee schedule, Resolution 2026-06, prices a house addition under 500 square feet at $104.50 plus 75 cents a square foot.

What requires a building permit in Tredyffrin Township?

Tredyffrin’s rule covers building, enlarging, altering, repairing, moving or demolishing a building, changing its occupancy, and installing or replacing any regulated electrical, gas, mechanical or plumbing system. The township also prints the ordinary repairs that need no permit.

Permit needed

  • Additions, new houses and structural alterations, including cutting walls, beams or load-bearing supports
  • Attached decks, and detached decks or garages over 1,000 square feet
  • Changes to egress, and new or relocated water, sewer, gas, drain or vent piping, wiring or ductwork
  • Electrical work, including generators and solar panels (an electrical permit only for solar)
  • Pools and hot tubs, fences, sheds, signs and demolition
  • Fuel storage tank installation (mechanical)

Ordinary repairs, no permit

  • Painting, papering, tiling, carpeting, cabinets and countertops
  • Prefabricated pools under 24 inches deep, and playground equipment at a one- or two-family home
  • Window replacement without structural change, and wall-mounted awnings projecting no more than 54 inches
  • Reroofing up to 25% of the roof area in any 12 months, and replacing existing siding
  • Porch or stoop repairs that do not support a roof, insulation, gutters, and like-for-like faucet, toilet or 20-amp fixture replacements

Detached decks and garages under 1,000 square feet take a zoning permit application instead of the building application. Any project disturbing more than 500 square feet needs a stormwater and grading permit, and smaller ones file a stormwater exemption.

What Tredyffrin decides and what the state holds

Tredyffrin opted in to enforce the UCC on May 3, 2004, with local amendments recorded by L&I. The Board of Supervisors sets fees by resolution, appointed the 2026 inspection agency in January, and adopts local ordinances the state code does not cover: the zoning code (Chapter 208), the stormwater ordinance, the Woodland Conservation Ordinance of August 28, 2023, and Chapter 151 property registration for student homes, which the Board replaced in full with Ordinance HR-499 on September 21, 2026. Data centers are under discussion but not regulated yet: on that date the supervisors said they were considering the issue, and a presentation on municipal controls for data centers is posted with the November 4, 2026 meeting materials; no data-center ordinance appears in the posted minutes.

Short on time to read all of this?

Get a free quote →

Tredyffrin Township building department: who handles permitting

The township issues the permits; plan review and inspections are contracted. At the January 5, 2026 organization meeting the Board appointed Barry Isett & Associates for plan review and inspection services for 2026, and the department lists United Inspection Agency as its electrical inspectors. Zoning reviews, zoning certificates and Zoning Hearing Board filings run through the Planning and Zoning side of the same department.

Tredyffrin Township permit contacts
DetailInformation
OfficePermits and Inspections, Tredyffrin Township Building, 1100 DuPortail Road, Berwyn, PA 19312
Phone and email610-644-1400, press #4; permits@tredyffrin.gov; permits and licensing lines 610-408-3610 and 610-408-3631
HoursMonday to Friday, 8 a.m. to 4:30 p.m.; building permit applications not accepted after 4 p.m.
DirectorErin McPherson, Director of Planning and Zoning and Zoning Officer (zoning line 610-408-3614)
Inspection agenciesBarry Isett & Associates (building); United Inspection Agency, 215-542-9977 (electrical)

The township is moving its website and email from tredyffrin.org to tredyffrin.gov through 2026, aiming to finish by the start of 2027.

Tredyffrin permit types

Clariti carries residential and commercial building permits, stormwater and grading permits, tree removal permits, contractor registration and student housing registration. Mailed and emailed applications are no longer accepted, so drawings and forms are uploaded with the application.

Residential permits

  • Additions and structural work: a site diagram of the whole lot with property lines, setbacks and streets, and plans sealed by a Pennsylvania-licensed professional for structural changes. New homes also file a use and occupancy application.
  • Decks: a site diagram, construction drawings and the deck’s square footage.
  • Demolition: letters showing each utility, including the township sewer authority, has been disconnected when a whole building comes down, plus the age of the home and a map of the adjoining properties.
  • Pools and hot tubs: a zoning table listing setbacks, impervious and building coverage, steep slopes and any wetlands or streams; a separate fence permit; and an electrical permit showing the bonding grid within 3 feet of the water. A pool must sit at least 15 feet from the nearest foundation.
  • Generators: an electrical permit, a site diagram with distances to windows, doors and lot lines, and a plumbing permit too for a natural gas connection.

Commercial permits

Commercial work follows the township’s commercial requirements sheet. A use and occupancy permit is needed before occupying a new building or altered tenant space, for a new occupant, a change of use, or extending a nonconforming use; with construction it is filed alongside the building application, and a change of occupant with no construction needs an architect’s seal on the application. A commercial certificate also waits on sign-off from the Township Engineer, the Municipal Authority for sewer connections, L&I state registration, PennDOT or the township for highway occupancy, and the Chester County Health Department for wells, septic systems or food service.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning Hearing Board. Variances, special exceptions and appeals from the Zoning Officer; applications are due by the first day of the month of the hearing, usually on the fourth Thursday at 7 p.m., with November and December set apart in the 2026 schedule. A single-family case costs $1,000.
  • Conditional use and land development. Conditional uses go through the Planning Commission and Board of Supervisors ($2,000). New homes in a subdivision pay a recreation and open space contribution of $2,449 per single-family detached unit.
  • Stormwater and grading. A permit for more than 500 square feet of disturbance ($1,000 for a single-family house, including two reviews and two inspections) or an exemption for 499 square feet or less ($50); a $3,500 escrow applies where the work misses the stormwater ordinance’s standards or needs a flood study.
  • Trees. Removing more than five trees of 6 inches or more in diameter in a rolling 12 months needs a tree removal permit ($250) and compensatory planting; dead or hazardous trees are exempt.
  • Sewer, wells and septic. Public sewer connections go through the Municipal Authority; on-lot septic systems and wells are permitted by the Chester County Health Department (610-344-6225).

Tredyffrin permit costs and fees

The Board of Supervisors adopted the 2026 fee schedule as Resolution 2026-06 at its January 5, 2026 organization meeting, 7 to 0. Building fees include two plan reviews and two inspections. Cost-based permits use the township’s own formula, (project cost ÷ $85) × $2.50 plus the base fee, and the fee calculator worksheet on the permits page applies it.

Rather talk it over?

Call 1-855-478-4290 →
Tredyffrin Township 2026 permit fees (Resolution 2026-06)
ItemFee
Residential construction, alterations, patios and decks: under 500 sq ft$104.50 plus $0.75 per sq ft
Residential: 500 to 1,000 sq ft / over 1,000 sq ft$104.50 plus $0.50 per sq ft / $104.50 plus $0.25 per sq ft
Non-residential: under 500 / 500–1,000 / over 1,000 sq ft$104.50 + $1 / $204.50 + $0.50 / $254.50 + $0.25 per sq ft
Residential electrical, HVAC or plumbing$104.50 plus $2.50 per $85 of cost (non-residential base $204.50)
Residential fence, roofing or stucco siding, pool or hot tub$54.50 plus $2.50 per $85 of cost
Shed under 144 sq ft / 144–1,000 sq ft$104.50 / $104.50 plus $0.50 per sq ft
Residential demolition$104.50 plus $2.50 per $100 of cost
Use and occupancy, residential / non-residential$104.50 / $204.50 per unit
Extra plan review / extra inspection / expedited review$200 / $120 / plus 50% of the permit fee
Stormwater and grading permit, single-family house / exemption$1,000 per dwelling / $50
Tree removal permit$250 (payment in lieu of planting $500)
Contractor registration$75
Sewer connection review and inspection / tapping fee$250 / $21.45 plus $13.34 per gallon a day of capacity
State UCC fee$4.50 per permit under state law; the township schedule has no separate line for it

Worked examples: a 400-square-foot deck is $104.50 plus 400 × $0.75, or $404.50. An $8,500 furnace and air conditioning job is ($8,500 ÷ $85) × $2.50, or $250, plus $104.50, for $354.50. A new house connecting to public sewer is allocated 275 gallons a day, so its tapping fee is 275 × $34.79, or $9,567.25. The square-foot bands do not chain, so a 499-square-foot job costs more than a 500-square-foot one. Starting work without a permit doubles the fee.

Trade permits and who may pull them

Every contractor must register with the township ($75) through Clariti, as the requirements sheet puts it: “All Contractors must be Registered with the Township.” Tredyffrin’s pages show no separate local electrician or plumber license; home improvement firms also need their state HICPA registration.

  • Electrical: permits priced by cost; inspections by United Inspection Agency (215-542-9977). Solar needs only an electrical permit, with a structural statement if panels sit on a building.
  • Plumbing: including natural gas lines to generators; pool water discharge is billed at $6.51 per 1,000 gallons.
  • HVAC and mechanical: heating and cooling equipment, and fuel storage tank installations, which need a plot plan and a copy of the contract.
  • Fire alarm and sprinkler systems: priced on the electrical line, which covers sprinklers, fire alarms, low-voltage and security systems.

Rather not deal with the building department?

Get a free quote →

How to apply for a Tredyffrin building permit

1. Check zoning

Use the zoning table requirements and resolve any variance or conditional use first.

2. Register the contractor

Contractor registration is its own Clariti application.

3. Prepare the files

Site plan, drawings, sealed plans for structural work, and stormwater or tree forms where needed.

4. Apply in Clariti

Upload everything to the online portal; paper and email are refused.

5. Answer review comments

The plans examiner requests anything missing from the contractor.

6. Pay the invoice

Pay after review; the permit issues 24 to 48 hours later and must be posted facing the street.

Review, corrections and what causes delay

The township commits to a maximum plan review of 15 business days for residential plans and 30 days for commercial plans. A third or later review costs $200 each, so complete first submissions save money as well as time. The building inspector may check the stated cost of work against the executed contract, and fees based on floor area are measured from the plans in ten-foot story increments.

Inspections in Tredyffrin Township

Schedule inspections by calling 610-644-1400 and pressing #4, or by emailing permits@tredyffrin.gov; electrical inspections are booked with United Inspection Agency. The permit fee covers two inspections and each additional visit costs $120. Final inspections must pass before a use and occupancy permit is issued. Before demolishing most buildings, the owner or demolition contractor must also send the asbestos notification form to DEP and the EPA at least 10 working days ahead; a single house that is not part of a larger project is the exception.

Residential use and occupancy permits are required for all new homes, but not for a change of ownership or tenancy, so Tredyffrin has no resale inspection for houses. Student homes and short-term rentals register instead ($104.50 and $50 per unit).

Pennsylvania building code in Tredyffrin Township

The building permits page cites the 2021 International Building Code, while the older residential use and occupancy text still refers to the 2006 ICC codes. FEMA’s Community Status Book lists Tredyffrin (community 420291) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2017; projects that need a flood study pay a $3,500 review escrow.

Pennsylvania has one Uniform Construction Code for the whole state, based on the 2021 International Codes since January 1, 2026. Most municipalities enforce it themselves or through a certified third-party agency; where a municipality has opted out, the Department of Labor and Industry handles commercial work and home owners hire a certified agency. Counties do not issue building permits. Pennsylvania rules

Want this handled start to finish?

Get a free quote →

Tredyffrin permit search and official resources

Applicants follow their own permits in Clariti. For other records, file a Right-to-Know request with the township (records request line 610-408-3602); black-and-white copies cost 25 cents a page. Zoning certificates for a property are requested by letter to the Zoning Officer ($100 for a single-family home). Board of Supervisors agendas, packets and minutes are posted by meeting. The county offices are summarized in the Chester County permit guide.

Inspections are where schedules slip.

Get a free quote →

Tredyffrin building permit FAQs

Can I file a Tredyffrin permit on paper?

No. All building, stormwater, tree removal and contractor registration applications go through the Clariti portal; mailed and emailed applications are not accepted.

When do I pay for the permit?

After plan review. The township invoices the applicant, and the permit is ready 24 to 48 hours after payment.

How much is a permit for a deck?

For a house, decks under 500 square feet cost $104.50 plus 75 cents a square foot, so a 400-square-foot deck is $404.50.

Do I need a permit to replace my roof?

Not if the replacement covers no more than 25% of the roof in 12 months. A larger reroof is $54.50 plus $2.50 per $85 of cost.

Is there a resale inspection when I sell my house?

No. Tredyffrin requires residential use and occupancy permits only for new construction, not for a change in ownership or tenancy.

Who does inspections?

Barry Isett & Associates is the appointed plan review and inspection agency for 2026; United Inspection Agency handles electrical inspections.

Do I need a permit to cut down trees?

Yes, if you remove more than five trees of 6 inches or more in diameter within 12 months; the permit is $250 and replacement planting is required.

Simplify Tredyffrin Township permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Pennsylvania. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Tredyffrin Township sooner?

Let Alliance prepare, file, and track your Tredyffrin Township permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Tredyffrin Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.