In the Borough of West Chester, the Building, Housing & Codes Enforcement Department (610-696-1773) enforces the Uniform Construction Code and the borough code, issuing building, electrical, plumbing and zoning approvals. Applications go in through the SmartGov online portal, and properties in the historic downtown usually need a Historical & Architectural Review Board approval first. Under the fee schedule adopted August 19, 2026, work on a one- or two-family house costs $80 for the first $1,000 of value and $15 for each further $1,000, plus a $100 first plan review.
What requires a building permit in West Chester?
The borough says permits are needed for most construction and renovation projects, and its application menu shows what that covers. A change to a building’s footprint or use may also need zoning or stormwater review before the building permit can issue.
Borough permit
- New houses and new commercial buildings
- Additions, renovations and repairs to homes and businesses
- Demolition, prefabricated structures and temporary buildings
- Electrical, plumbing and heating, ventilating and air conditioning systems
- Fireplaces, pools and decks
- Grading
- Signs; certificate of occupancy applications
Zoning site plan review
- Fences
- Sheds
- Patios
- Additions and new parking
- New signs
- Interior renovations usually need no zoning approval
The borough does not post its own list of work that is exempt from a building permit, so ask the department before starting anything not covered above. Buildings with three or more apartments are filed as commercial work even though they are homes.
What West Chester decides and what the state holds
The construction standards come from the statewide Uniform Construction Code; the borough’s application guides say it adopted the 2021 International Residential Code effective January 1, 2026. West Chester elected to enforce the code itself on April 21, 2004, and L&I lists it with local amendments. Borough Council, working under the home rule charter, sets the zoning code (Chapter 112), subdivision and land development rules, the stormwater code, the historic district process, rental licensing and the fee schedule.
West Chester building department: who handles permitting
The Building, Housing & Codes Enforcement Department reviews and issues construction permits and zoning approvals, reviews land development, licenses and inspects rental housing and enforces property maintenance. Aaron Flook is the department’s Director and Paul Edwards is the Building Code Official and building inspector. The department has full-time staff and also works with third-party inspectors. Planning and zoning questions, including work in the historic district, go through the same office and the Zoning Officer.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building, Housing & Codes Enforcement, Borough Hall, 401 East Gay Street, West Chester, PA 19380 |
| Phone and email | 610-696-1773; fax 610-692-7958; housing@west-chester.com |
| Hours | 8 a.m. to 4 p.m. |
| Filing | SmartGov Permitting & Licensing Portal, online only |
| Street openings | Public Works, 205 Lacey Street; 610-696-5282 |
| Sewer | Borough Wastewater Department; sewer@west-chester.com |
Public Works handles street opening and dumpster permits from 205 Lacey Street, open Monday to Friday from 8 a.m. to 3:45 p.m. The Wastewater Department, which runs the borough’s two treatment plants for West Chester and East Bradford Township, answers sewer connection questions.
West Chester permit types
SmartGov sorts applications into residential and commercial groups: new building, addition-alteration-repair, demolition, signs and certificate of occupancy, with a separate zoning site plan review under the Planning and Zoning category for fences, sheds and patios. Each application has seven sections (project, contacts, contractors, details, valuation, submittals and conditions), and the conditions section asks about the historic district and floodplain status.
Residential permits
The residential addition-alteration-repair application is the one most homeowners use: it covers additions, renovations, demolition, decks, pools, fireplaces, grading and the electrical, plumbing and mechanical work that goes with them. Structural work needs plans stamped by a design professional. A fence, shed or patio needs a site plan showing the lot lines, existing buildings and the new work with its distances to the lines; the borough’s instructions include a sample.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial new buildings, alterations, demolitions and apartment buildings of three or more units all need plans prepared by a design professional. Businesses also face an annual fire safety inspection billed by floor area, and an outdoor café on the sidewalk needs its own yearly permit. Landlords must hold a rental license for each unit, file the tenant-landlord form every year, and name a local responsible agent if they live more than 5 miles outside the borough.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning review. The borough calls zoning approval the first step for any project. Residential zoning applications are decided within 15 business days and commercial ones within 30, and the Zoning Officer writes before the deadline if more information is needed. Denials and variance requests go to the Zoning Hearing Board.
- Historic district. Most properties in the historic downtown need Historical & Architectural Review Board approval before a building permit. HARB meets on the last Thursday of each month at 7 p.m. in Room 232 of Borough Hall, applications are due 10 days before, and it advises Borough Council on demolitions, renovations and alterations.
- Land development and stormwater. Subdivision and land development review costs $400 plus the Borough Engineer’s fees. Ordinance 08-2026 repealed the stream protection fee on September 16, 2026; the stormwater code itself still applies.
- Data centers. Ordinance 05-2026, enacted July 15, 2026, adds data centers and data center campuses to the Industrial District as uses permitted by conditional use, with their own area, bulk and use rules.
- Sewer and streets. The borough owns the Goose Creek and Taylor Run treatment plants, so sewer connections and planning modules go through its Wastewater Department. Digging in a borough street needs a Public Works street opening permit; state roads need a PennDOT Highway Occupancy Permit.
West Chester permit costs and fees
The current borough fee schedule was adopted on August 19, 2026. Building permit fees are charged on the value of the work, plan review is a separate line, and plumbing is priced by fixture.
| Item | Fee |
|---|---|
| Building permit, one- or two-family house (new work, alterations, additions, demolition, signs, HVAC) | $80 for the first $1,000 + $15 per additional $1,000 |
| Building permit, multi-family or non-residential | $154.50 for the first $1,000 + $15 per additional $1,000 |
| Projects over $20 million | ICC model fee schedule, 4-year averaging for the multiplier |
| Plan review, one- or two-family / multi-family or non-residential | $100 / $150 first review; $100 each additional review |
| Zoning review (site plans, fences, sheds, patios) | $50 |
| Electrical permit | $80 for the first $1,000 + $10 per additional $1,000 |
| Plumbing, one- or two-family / other buildings | $80 / $154.50 base + $25 per fixture (one rough and one final inspection included) |
| Additional inspection, any permit | $150 |
| Work without a permit or on an expired permit | Double the permit fee, minimum $50 |
| Zoning Hearing Board, single-family house | $500; continuance $200 |
| Rental license | $66 per unit a year |
| Street opening | $10 per sq ft, minimum $500 |
| Pennsylvania UCC state fee | $4.50 per permit (state fee; not printed on the borough schedule) |
Rather talk it over?
Call 1-855-478-4290 →Worked from the schedule: a $25,000 kitchen remodel in a single-family house carries a building permit of $80 plus 24 × $15 = $440, and the first plan review adds $100, for $540 before trade permits. An $8,000 electrical job is $80 plus 7 × $10 = $150, and a new bathroom with three fixtures is $80 plus 3 × $25 = $155 for plumbing.
Other lines on the same schedule: a zoning letter is $150, an appeal to the Building, Housing & Fire Prevention Code Board of Appeals is $500, and a conditional use for a single-family home is $500. Zoning Hearing Board cases for public and institutional uses cost $800 and for apartments, commercial and industrial property $1,200. A sidewalk permit with its inspection is $30, a dumpster permit $45 a week, a short-term rental $66 per unit and a rental license transfer $5.
Trade permits and who may pull them
- Electrical: a borough electrical permit priced at $80 for the first $1,000 of work and $10 for each further $1,000; an annual electrical maintenance permit is $504.
- Plumbing: a borough plumbing permit with a base fee and $25 per fixture, which covers one rough and one final inspection.
- Mechanical: heating, ventilating and air conditioning work is priced on the building permit scale.
West Chester sets its own trade rule. The borough’s application guides state that, by ordinance, electricians, HVAC mechanics and plumbers must be certified by the International Code Council and give the borough their certification, and the fence, shed and patio instructions go further, saying all contractors working in the borough must be ICC certified and upload their license number. Home improvement contractors also register with the state Attorney General under the home improvement law.
How to apply for a West Chester building permit
Use the borough’s Zoning Map Lookup app, or book a consultation with the Zoning Officer.
Downtown properties usually go to HARB first; file 10 days before its monthly meeting.
Sign up on the Permitting & Licensing Portal and verify the email link.
Residential or commercial, new building, addition-alteration-repair or demolition; zoning site plan review for fences, sheds and patios.
Add contractors with their ICC certifications, the valuation and stamped plans where needed.
Allow 72 hours for the application to appear before asking for an update.
Pay the fees shown in the portal, then arrange inspections with the department.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Staff check every application for completeness before it is sent for review, so missing plans, certifications or valuations hold an application back before review even starts. The state code gives the borough 15 business days for a residential decision and 30 for commercial, and zoning reviews run on the same 15 and 30 days. Each review after the first costs $100, and a project that needs HARB, a zoning variance or land development approval waits for those decisions.
Inspections in West Chester
Borough staff and the third-party inspectors the department works with carry out inspections. A plumbing permit includes one rough and one final visit, and any additional inspection on any permit costs $150. The borough’s permit menu also includes a certificate of occupancy application. Arrange inspections with the department at 610-696-1773.
Rental units are inspected separately under the rental license program, and landlords book those visits in the borough’s online booking system. Annual commercial fire safety inspections run from $70 for a building under 1,000 square feet to $310.10 for one over 50,000, with $30 for a re-inspection to confirm corrections and $50 if nobody appears.
Pennsylvania building code in West Chester
West Chester has enforced the Uniform Construction Code with its own department since April 21, 2004. FEMA’s Community Status Book lists West Chester (community 420292) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2017, and the borough’s building applications ask for the property’s floodplain status.
Pennsylvania has one Uniform Construction Code for the whole state, based on the 2021 International Codes since January 1, 2026. Most municipalities enforce it themselves or through a certified third-party agency; where a municipality has opted out, the Department of Labor and Industry handles commercial work and home owners hire a certified agency. Counties do not issue building permits. Pennsylvania rules
West Chester permit search and official resources
Applicants follow their own permits in SmartGov, where the dashboard shows each review stage. The borough’s Residential/Student Rental Tracker lets anyone search an address for a valid rental license, its status, the number of units and whether students are permitted. For older permit files, ask the department at housing@west-chester.com. For county septic, well and land development review, see the Chester County guide.
Want this handled start to finish?
Get a free quote →- Building permits and application types
- Building, Housing and Codes Enforcement
- SmartGov Permitting and Licensing Portal
- Borough fee schedule, adopted August 19, 2026 (PDF)
- Residential addition, alteration and repair application guide
- New residential building application guide
- Commercial addition, alteration and repair application guide
- New commercial building application guide
- Fence, shed and patio instructions (PDF)
- Planning and Zoning
- Zoning review
- Historical and Architectural Review Board
- Zoning Hearing Board
- Borough ordinances 2026
- Ordinance 05-2026, data centers (PDF)
- Ordinance 08-2026, stream protection fee repeal (PDF)
- Wastewater Department
- Public Works and street openings
- L&I municipal UCC elections list
- FEMA Community Status Book, Pennsylvania
Inspections are where schedules slip.
Get a free quote →West Chester building permit FAQs
How much is a building permit for a house project in West Chester?
$80 for the first $1,000 of value and $15 for each additional $1,000, plus $100 for the first plan review. A $25,000 remodel comes to $540 before trade permits.
Can I file a paper application?
The borough uses SmartGov to accept all permit applications, so file online and allow 72 hours for the application to show on your dashboard.
Do I need a permit for a fence or shed?
Yes, a zoning approval. Fences, sheds and patios go through a zoning site plan review in SmartGov, which costs $50, with a site plan showing distances to the property lines.
Does my contractor need a license in West Chester?
The borough requires electricians, HVAC mechanics and plumbers to hold International Code Council certification and give it to the borough, and its fence, shed and patio instructions apply ICC certification to all contractors working in the borough.
Is my house in the historic district?
Check the Zoning Map Lookup app or ask the department. Most properties in the historic downtown need HARB approval before a building permit.
How long does zoning review take?
Residential zoning applications are reviewed within 15 business days and commercial ones within 30.
What happens if I start work without a permit?
The fee schedule charges double the permit fee, with a $50 minimum.
Who handles sewer connections?
The borough owns its sewer system and the Goose Creek and Taylor Run plants; contact the Wastewater Department at sewer@west-chester.com, and get a Public Works street opening permit for any digging in a borough street.
Simplify West Chester permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Pennsylvania. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in West Chester sooner?
Let Alliance prepare, file, and track your West Chester permits while your crew stays on the job.
More Pennsylvania permitting guides
Chester County
Read guide →West Goshen Township
Read guide →West Whiteland Township
Read guide →West Hanover Township Building Permit Guide
Read guide →West Hempfield Township Building Permit Guide
Read guide →West Lampeter Township Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about West Chester permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.