In the City of Forest Park, building permits come from the city’s Building Department at 1201 West Kemper Road (513-595-5264), led by Rafic Nakouzi, Director of Building & Property Maintenance. Apply on the city’s OpenGov portal, in person or by email to bldgdept@forestpark.org; nothing is processed until the application fee is paid. Electrical permits go to Inspection Bureau, Inc. and plumbing permits to Hamilton County Public Health, and plan review can take up to 30 days or more, with an overnight review offered for an extra fee.
What requires a building permit in Forest Park?
Forest Park does not publish a single exemption list. What it does publish is the set of inspections it expects, which shows the kind of work it permits: new buildings from footing to final, foundation repairs, decks, fences, signs, tents, exterior finishes, HVAC equipment, concrete flatwork and industrialized units. Its zoning pages add the yard rules for fences, walls and small outbuildings.
City building or zoning permit
- New houses, additions and commercial buildings, each structure on its own application
- New or replacement HVAC equipment
- Decks, inspected at footing, framing and final
- Every shed, playhouse, detached garage, carport, canopy or pergola
- Fences and walls (hedges are regulated by zoning but need no permit)
- Signs, temporary tents and concrete flatwork such as slabs, steps, sidewalks and driveways
- Fire protection systems and foundation structural repairs
Permits from other offices
- Electrical work: Inspection Bureau, Inc.
- Plumbing and water heater replacements: Hamilton County Public Health
- Water taps: Cincinnati Water Works; sewer taps: Metropolitan Sewer District
- Driveway aprons, sidewalks, curb cuts, street openings and boring: city right-of-way permit
- Storm water work: the city’s Stormwater Utility
- Boilers and elevators: the state Division of Industrial Compliance
Before the Building Department issues anything, the project has to fit the zoning code. Accessory buildings may go only in the rear yard, at least 6 feet from every property line and no larger than 200 square feet; anything bigger needs a conditional use approval from the Planning Commission after a public hearing. Fences may not stand in a front yard, apart from purely ornamental fences up to 4 feet tall and 15 feet long, and a pool or pond deeper than a foot must be fenced.
Fence heights depend on the district: 6 feet in the R-1, R-2, R-PUD and PR-3 districts, 12 feet in the business, industrial and office districts, and 4 feet inside the required setback of a corner lot. On a corner lot a fence up to 4 feet tall may run halfway into the secondary front yard. Fences or walls are also required around dangerous equipment such as substations and cell towers, between a commercial building or parking lot and an adjoining house, and as a solid enclosure around dumpsters. The finished side faces out, and the city does not enforce private deed restrictions, which a homeowners association may still apply.
Short on time to read all of this?
Get a free quote →What Forest Park decides and what the state holds
The city writes its zoning code (Chapter 150, “Land Usage”), its own building and property maintenance rules, its rental registration program and its fees, which it quotes by phone rather than in a posted schedule. It also keeps a local Board of Building Appeals for work under the Forest Park Building Code, while appeals on buildings governed by the Ohio Building Code go to the Ohio Board of Building Appeals. The state writes the building codes and certifies departments; on May 1, 2023 City Council also passed Resolution 18-2023, a zoning moratorium on new group living facilities that stays in effect as long as the maximum number of group living facilities permitted in the city remain open and operating; no applications for new ones are accepted meanwhile.
Forest Park building department: who handles permitting
The Building Department reviews plans, issues building, HVAC, fence, sign and similar permits, inspects construction and runs property maintenance and rental inspections. Zoning approvals, Planning Commission cases, sign rules and variances sit with the Community Development Department in the same building. The city says it does not offer one-stop permitting, as Cincinnati and the county do, so each outside agency must be approached directly.
| Office | Contact |
|---|---|
| Building Department | 1201 West Kemper Road, Forest Park, OH 45240; 513-595-5264; fax 513-595-5285; bldgdept@forestpark.org |
| Municipal Building hours | Monday to Friday, 8:00 a.m. to 4:30 p.m.; in-person appointments can be booked online |
| Community Development (zoning, Planning Commission, signs, variances) | 513-595-5215 |
| City Engineer / Public Works | 513-595-5247 / 513-595-5246 |
| Stormwater Utility | 513-595-5258 |
| Fire Department (fire code) | 513-595-5276 |
| Electrical permits | Inspection Bureau, Inc., 250 W. Court St., Room 320-E, Cincinnati, OH 45202; 513-381-6080 |
| Plumbing permits | Hamilton County Public Health Plumbing Division, 1701 Patricia McCollum Way (5th floor), Cincinnati; 513-946-7800 |
The city’s pages give two numbers for the county plumbing division, 513-326-4500 and 513-946-7852, and still show its old William Howard Taft Road address. Hamilton County Public Health’s own site lists 513-946-7800 and says it has moved to 1701 Patricia McCollum Way (5th floor).
Forest Park permit types
The Building Code as the city applies it calls for a separate application for each proposed structure and for HVAC, fire protection and sign work. A whole project can be issued as one combined permit, apart from signs and the work other agencies permit, but the city notes that separate permits are often more practical for foundations, fire systems and fast-track jobs.
Not sure this scope needs a permit?
Get a free quote →Residential permits
Houses, additions, garages, decks, sheds and pools follow the Residential Code of Ohio. The department supplies standard drawings and design guidelines for common jobs such as decks, masonry and free-standing fireplaces and retaining walls, on request or during a consultation. Residential rental owners need a separate annual rental permit under an ordinance passed on November 20, 2023 and in force since March 1, 2024, covering any home where the owner does not live.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings follow the Ohio Building Code. A change of use, and every new owner or tenant in a commercial or business space, needs a certificate of occupancy after use and occupancy inspections by the Building and Fire departments, and zoning approval from Community Development is required for every use. The Building Department may forward plans internally to the Fire Department and Community Development, but storm water, right-of-way and utility approvals remain the applicant’s job. A vendor registration on the OpenGov portal is a separate step for firms that want to do business with the city itself.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Check the zoning map or the zoning-by-street table, or call Community Development at 513-595-5215; uses not permitted by right may need a conditional use or variance.
- Planning Commission. Its seven members meet on the second Tuesday of each month at 7:00 p.m., and applications are due by the fourth Friday of the previous month. Applicants must attend in person.
- Board of Zoning Appeals. Zoning appeals and variances are filed through Community Development.
- Storm water. New construction, redevelopment and land disturbance that affect drainage need a Stormwater Management Permit from the Public Works and Stormwater Utility Department.
- Right-of-way. New, replaced or wider driveway aprons and sidewalks, curb openings, street cuts and bores need a right-of-way permit, emailed to Public Works and approved before payment.
Forest Park permit costs and fees
Forest Park posts no building permit fee schedule online. Its building page tells residential and commercial applicants to call the Building Department (513-595-5264) for the application fee, and it will not start processing an application until that fee is paid. The fees that are published are below.
Rather talk it over?
Call 1-855-478-4290 →| Item | Detail |
|---|---|
| Building permit application fee | Quoted by the Building Department; paid before processing; non-refundable |
| Card payments | 2.99% surcharge plus a $0.99 transaction fee; e-check online, or cash or check in person |
| Overnight plan review | Available for an additional fee |
| Rental permit, single- or two-family home | $100 a year, renewed by March 1 or when the tenant changes |
| Rental permit, apartment or multifamily building | $100 per building plus $10 per unit |
| Commercial stormwater utility fees | Paid online through the city’s payment portal |
Electrical permit fees are set by Inspection Bureau, Inc. and plumbing fees by Hamilton County Public Health, and the Board of Building Standards collects its state assessment on top of local building fees. Because the city quotes fees case by case, ask for the full amount, including any plan review and re-inspection charges, before you file, and budget for the card surcharge if you pay online.
Trade permits and who may pull them
The Building Department handles HVAC permits and inspects HVAC installations, and new or replacement equipment is also inspected by the electrical agency. The two main trades sit elsewhere:
- Electrical: Inspection Bureau, Inc. (IBI) issues electrical permits under the National Electrical Code and makes the ground, rough and final electrical inspections. Call 513-381-6080.
- Plumbing: Hamilton County Public Health’s Plumbing Division issues plumbing permits and makes the ground, rough and final plumbing inspections, plus water heater replacements. Commercial plumbing installers need an Ohio Construction Industry Licensing Board license and must be bonded and registered with the health department.
- Owner plumbing: the county allows a homeowner’s permit only for a single-family house the owner lives in, does the work on personally and keeps living in for a year afterward.
- Fire protection: sprinkler and other fire protection work needs its own city application and Fire Department review.
Forest Park’s pages show no city contractor license; contractors name themselves on the application and register with the county for plumbing.
Rather not deal with the building department?
Get a free quote →How to apply for a Forest Park building permit
Meetings with an inspector, plans examiner or the Building Official can be booked between 8:00 a.m. and 4:00 p.m. on weekdays; call 513-595-5264 at least 24 hours ahead.
Confirm the use and setbacks with Community Development, and file any Planning Commission or variance case first.
Locate the project address on the portal, choose the permit type and complete each step, or download the paper form.
Attach site plans and structural drawings as one PDF on the day you apply, or the application is voided; paper sets may still be requested.
Once staff confirm the package is complete, an email asks for the fee; payment assigns the permit number.
Apply to IBI for electrical, the county for plumbing, and the city for storm water and right-of-way work.
Review, corrections and what causes delay
Depending on workload, plan review can take 30 days or more, and there is no walk-in counter; the overnight review is the faster option. Plans may come back approved, approved with conditions, partly approved for a foundation or system, or rejected, and a rejection can be appealed. Uploading pages one by one instead of as a single PDF, missing the same-day upload, or leaving out a site plan holds an application up.
Inspections in Forest Park
The builder must call ahead to book every inspection with the right agency. For a new house the city’s sequence runs: footing before concrete, foundation wall, waterproofing and drain tile, slab after ground plumbing and electric, framing after rough plumbing and electric, masonry, rough HVAC before insulation, roof sheathing, fire assembly penetrations, insulation before drywall, drywall nailing before taping, final HVAC and the final building inspection. No one may occupy the building before that final, which comes after or together with all other finals. Fences are inspected when finished; signs at footing and final; decks at footing, framing and final.
All exterior work must be finished within six months of permit issue. If construction stops for six months or more without an inspection, the permit may be revoked automatically unless an extension is requested for special circumstances. If an inspector’s code decision cannot be resolved with the Building Official, the city’s appeals page sets out the appeal route.
Ohio building code in Forest Park
The Building Department enforces the statewide building and residential codes along with the Forest Park Building Code and property maintenance rules. FEMA’s Community Status Book lists Forest Park (community 390216) as participating in the National Flood Insurance Program, with flood maps effective December 20, 2024.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Forest Park permit search and official resources
Applications filed on the OpenGov portal can be followed there. For older permits, plans or certificates of occupancy, ask the Building Department by phone or at bldgdept@forestpark.org, and ask Community Development for zoning history.
- Forest Park Building Department: permits and applications
- Forest Park OpenGov permit portal
- Building Department contacts
- Required inspections and agencies
- Permits issued by other agencies
- Construction project agency contacts
- Consultations and plan review
- Use and occupancy requirements
- Building appeals
- Zoning information
- Fence rules
- Accessory structure rules
- Planning Commission
- Rental registration
- Stormwater Management Permit
- Right-of-way permits
- Hamilton County Public Health plumbing permits
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Forest Park building permit FAQs
Do I need a permit for a fence in Forest Park?
Yes. Fences and walls need a city permit, and in the main residential districts they may be no taller than 6 feet and may not stand in the front yard.
Does a shed need a permit?
Every accessory structure needs a Building Department permit; it must sit in the rear yard, 6 feet from property lines, and anything over 200 square feet needs Planning Commission approval.
How much is a building permit?
The city does not post a schedule; call 513-595-5264 for the application fee, which must be paid before review starts.
How long does plan review take?
Up to 30 days or more, depending on workload; an overnight review is available for an extra fee.
Who handles electrical permits?
Inspection Bureau, Inc., at 513-381-6080, which also makes the electrical inspections.
Do landlords need a permit?
Yes. Every rental home needs an annual rental permit, $100 for a single- or two-family home, with a yearly exterior inspection.
Can I apply online?
Yes, through the city’s OpenGov portal, uploading all drawings as one PDF on the same day.
Simplify Forest Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Forest Park sooner?
Let Alliance prepare, file, and track your Forest Park permits while your crew stays on the job.
More Ohio permitting guides
Hamilton County
Read guide →Harrison
Read guide →Loveland
Read guide →Franklin County Building Permit Guide
Read guide →Fulton County Building Permit Guide
Read guide →Gahanna Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Forest Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.