Upper Township, New Jersey Building Permit Guide

To get a building permit in Upper Township, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Upper Township’s Construction Code office at Township Hall, 2100 Tuckahoe Road in Petersburg, issues and inspects construction permits across the township, from Tuckahoe and Petersburg to Beesley’s Point and Strathmere, and most home sellers must get a township flood compliance certificate before closing.

Authority: Upper Township Construction Code officeCode: NJ Uniform Construction CodePhone: 609-628-2011
Authority
Township Construction Code2100 Tuckahoe Road, Petersburg
Inspections
Ext. 220, day beforeBuilding Mon–Fri 9:00–2:30
Home sales
Flood certificate$100 inspection, Ordinance 11-2020
Land use board
Planning Board onlyZoning Board abolished Nov. 2025

In Upper Township, the Construction Code office at Township Hall, 2100 Tuckahoe Road, Petersburg (609-628-2011 ext. 225), issues building, electrical, plumbing and fire permits; Dory Cooper is the Construction Official. Inspections are booked at ext. 220 at least the day before. Homes in the flood zone may also need a flood development permit from the township engineer, and since January 2021 most residential sales need a $100 flood compliance inspection.

What requires a building permit in Upper Township?

Upper Township follows the state’s permit rules: ordinary maintenance needs no permit, minor work needs a permit but may begin after you notify the office, and everything else waits for the issued permit. Two local layers sit on top of that and catch owners by surprise.

Township permits

  • New homes, detached garages, additions, renovations and repairs that the UCC regulates
  • Flood development permit from the Engineering Office for work in the flood zone, including repairs over $10,000 such as roofing, siding, windows, kitchens and baths
  • Bulkhead construction, reconstruction or repair (Chapter 17)
  • Zoning permits for fences, signs, sheds, pools, detached garages, land clearing and house revisions
  • Storage containers, by zoning permit for up to 45 days in any year

County permits

  • Septic systems, including remodels that add bedrooms, from the Cape May County Health Department
  • Private wells (county well application)
  • Driveways, curbs and other work in a county road right-of-way

The flood development permit is the item most often missed: the engineer’s page says some repairs need no construction permit at all but still need a flood permit once their cost passes $10,000. Ask the Zoning or Engineering office before you build on, alter, regrade or fill a lot.

What Upper Township decides and what the state holds

The construction codes are statewide. The township sets its fees and development fee, writes its zoning and bulkhead rules, runs flood plain management and lead-paint inspections of rentals, and decides land use applications. In September 2026 the Township Committee adopted Ordinance 015-2026, which bars data centers as a principal use. The DCA roster as of September 2, 2026 shows township officials in the building, electrical, plumbing and fire posts and the Department of Community Affairs in the elevator post.

Upper Township building department: who handles permitting

Construction permits and inspections come from the township’s Construction Code office; zoning, site plans and subdivisions are handled by the Planning & Zoning Office in the same building, and flood permits by the Engineering Office, whose engineer is the township’s floodplain manager.

Short on time to read all of this?

Get a free quote →
Upper Township permit contacts
DetailInformation
Construction officeTownship Hall, 2100 Tuckahoe Road, Petersburg, NJ 08270 (mail: P.O. Box 205, Tuckahoe, NJ 08250)
Construction OfficialDory Cooper, 609-628-2011 ext. 225, constructioncode@uppertownship.com
Inspection line609-628-2011 ext. 220
HoursMonday to Friday, 8:30 a.m. to 4:00 p.m.
Zoning and Planning BoardExt. 245, planning@uppertownship.com
Engineering / floodplainExt. 244, engineer@uppertownship.com
Fax609-628-3092

Upper Township permit types

Applications use the state UCC forms, which the township links from its Construction Code page, and the office posts a step-by-step sheet on filling them in. On a house, the use group box takes “R5” and the construction type “VB”. An owner doing work on an owner-occupied home writes “Owner” in the contractor box; a contractor enters its business details and its license or registration number. Only one party signs the certification inside the jacket: the owner when the owner does the work, otherwise the contractor as agent.

Residential permits

  • New houses and additions carry the township development fee form, filed with the construction application.
  • Chimney and fuel-burning appliance work uses the chimney verification form (UCC F370).
  • Bulkheads need plans sealed by a New Jersey professional engineer, a sealed survey, the DEP authorization and notice to owners within 100 feet on the same tidal water; the permit issues only after the township engineer approves it.
  • Rentals built before 1978 need a lead-safe certification, valid for two years, unless an exemption applies.

Bulkheads on waterfront lots

Chapter 17, rewritten by Ordinance 009-2025, applies to every new, rebuilt, renovated or repaired bulkhead. An owner who demolishes a building or makes a substantial improvement, meaning work costing 40% or more of the structure’s market value, must also bring the existing bulkhead up to the chapter. The ordinance fixes minimum top elevations: 11.0 feet (NAVD 1988) for oceanfront bulkheads along the Atlantic and Corson’s Inlet, 10.0 feet along the listed Great Egg Harbor blocks, 8.0 feet along the listed Strathmere Bay blocks, and along the Tuckahoe River 9.0 feet for block 348 or one foot above the existing bank at the spring high tide line for the other listed blocks; the existing timber oceanfront bulkhead is treated as meeting the standard. A denied applicant may appeal to the Township Committee in writing through the Construction Official.

Commercial permits

Commercial work follows the same application, with the higher development fee rate. The township runs a Knox Box program for rapid fire department access to commercial buildings, offered through the Construction Code page. Site plans and conditional uses go to the Planning Board.

Not sure this scope needs a permit?

Get a free quote →

What comes before the construction permit

  • Zoning permit. Issued by the zoning officer; the township’s GIS map shows zoning, wetlands and parcel data.
  • Planning Board. Ordinance 008-2025, adopted November 10, 2025, abolished the Zoning Board of Adjustment and moved its powers, including variances, to the Planning Board. File 20 copies with fees between 35 and 21 days before the monthly meeting, held at 6:00 p.m. on the first Thursday at Township Hall.
  • County, state and Pinelands notice. Applications must notify the Cape May County Planning Board when the lot is on a county road, the state transportation commissioner when it abuts a state highway, and the Pinelands Commission for land in the Pinelands Area.
  • Septic and wells. The county Health Department’s environmental office reviews septic designs by New Jersey licensed engineers and checks them against Pinelands and DEP wetland and coastal rules.
  • Soil disturbance. Over 5,000 square feet needs a certified plan from the Delatlantic Soil Conservation District in Mays Landing (609-625-3144).

Upper Township permit costs and fees

Construction permit fees are set by the township’s fee chapter of its code; the office prices each application, so ask at ext. 225 before you budget. The township’s own ordinances and forms publish these fees:

Upper Township fees from adopted ordinances and forms
ItemFee
Zoning permit: fence, sign or shed$10
Zoning permit: pool, detached garage or clearing$25
Zoning permit: house revision$25
Zoning permit: buildings, additions or any other purpose$50
C variance (Planning Board)$250 plus $600 escrow
D variance$300 plus $1,000 escrow
Preliminary site plan under 10 acres / final site plan$300 plus $1,500 escrow / $300 plus $1,000 escrow
Bulkhead permit$250 for the first 50 feet, then $15 a foot; inspection escrow 5% of cost or $500, whichever is greater
Development fee (Ordinance 13-2009)1.5% residential or 2.5% commercial of the increase in equalized assessed value
Flood compliance inspection on sale$100
Rental lead visual assessment$250 plus $50 filing fee per unit, plus $20 state fee; reinspection $295
County septic application (residential / commercial)$125 / $150
County well application$125
County road opening permit$25 application; trench openings from $75 for the first 5 square yards; bond $1,000 plus $55 a square yard

Rather talk it over?

Call 1-855-478-4290 →

Land use fees come from Ordinance 008-2025 and the bulkhead fees from Ordinance 009-2025, adopted November 24, 2025. The development fee is calculated by the tax assessor: half of the estimated fee must be paid to the treasurer before the construction permit issues, and the balance before the certificate of occupancy. Projects with a zoning permit or preliminary site plan approval before June 8, 2009 are exempt. The state’s training fee surcharge is added to each construction permit.

Trade permits and who may pull them

Electrical, plumbing and fire protection work goes on the same application, each with its own technical section and subcode inspection. Each trade inspects on fixed days, so plan the job around them:

  • Electrical: inspections Monday to Thursday, 9:00 a.m. to 4:00 p.m.; electrical contractors hold state licenses.
  • Plumbing: inspections Tuesday and Thursday, 11:00 a.m. to 4:00 p.m.; master plumbers hold state licenses.
  • Fire protection: inspections Tuesday and Thursday, 3:00 to 5:00 p.m., for sprinkler, alarm and other fire protection work.
  • Owners: the township’s instructions let an owner doing the work on an owner-occupied home file as “Owner” and sign the owner section of the jacket.
  • Contractors: home improvement contractors working on houses register with the state Division of Consumer Affairs and put that number on the application; owners working on their own home are exempt.

How to apply for an Upper Township building permit

1. Check zoning and flood status

Use the township GIS map or call ext. 245 for the zone, and ext. 244 to learn whether the lot is in a flood area that needs a flood development permit.

2. Get the zoning permit and any board approval

Variances and site plans now go only to the Planning Board.

3. Line up outside approvals

County septic or well permits, county road opening permits, soil district, DEP and Pinelands approvals where they apply.

4. Fill in the UCC forms

Use the township’s instructions for the jacket, add each technical section and attach plans and the development fee form.

5. File at Township Hall

Submit to the Construction Code office at 2100 Tuckahoe Road and pay the fees it calculates, including half the estimated development fee.

6. Book inspections

Call ext. 220 at least a day ahead for each stage.

Review, corrections and what causes delay

A flood development permit that was not obtained, a missing development fee form or an unsigned certification are the usual hold-ups. Bulkhead files wait for the township engineer’s approval and the DEP authorization. Once the construction office has a complete application, state rules give it 20 business days to issue or deny the permit.

Rather not deal with the building department?

Get a free quote →

Inspections and certificates in Upper Township

Request every inspection at 609-628-2011 ext. 220 at least the day before. Building inspections run Monday to Friday from 9:00 a.m. to 2:30 p.m.; the other trades keep the days listed above. The certificate of occupancy is held until the full development fee has been paid.

The Construction Code office does not inspect homes or businesses for resale. The smoke detector and carbon monoxide certification needed for a home resale is administered by the New Jersey Department of Community Affairs through its online fire safety system. What the township does require on a sale is a Flood Compliance Certificate under Ordinance 11-2020: the seller applies to the floodplain manager, pays $100, and the inspection checks that no space approved as non-habitable has been turned into living space since the certificate of occupancy. Results and the certificate come within three business days of the inspection. The same certificate applies before a long-term rental of 11 months or more.

Homes with a certificate of occupancy issued before January 1, 1999 are presumed compliant but are still inspected. No certificate is needed when a new-construction CO was issued within a year of the sale, or when the buyer files a notarized affidavit with the Zoning Office promising demolition within 90 days.

Lead-paint inspections of rented one- and two-family homes are also booked through ext. 220. The township gives an inspection date once the complete application and fee are in, and someone 18 or older must be there to let the inspector in. Any lead evaluation or abatement contractor the owner hires must be on the state’s certified list, and a lead-safe certification is valid for two years.

New Jersey building code in Upper Township

Upper Township enforces the Uniform Construction Code with its own office. FEMA’s Community Status Book lists the township (community 340159) as participating in the National Flood Insurance Program, with maps effective October 5, 2017, and at Community Rating System class 5, a 25% flood insurance discount.

New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules

Upper Township permit search and official resources

Ask the Construction Code office (ext. 225) about the status or history of a permit on a property. Copies of permit files and plans are requested on the township’s Open Public Records Act form from the Clerk’s forms page. Adopted ordinances are posted by year on the township website.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Upper Township building permit FAQs

Does Upper Township inspect homes before a sale?

The Construction Code office does not, but the township requires a $100 flood compliance inspection and certificate before most home sales; the smoke and CO certificate comes from the state DCA.

Do roof or siding repairs need a permit in Upper Township?

Ask the Construction Code office about the construction permit; in a flood area, repairs over $10,000, including roofing and siding, may need a flood development permit from the Engineering Office.

Who hears variances now?

The Planning Board. Ordinance 008-2025 abolished the Zoning Board of Adjustment in November 2025.

How much is a zoning permit?

$10 for a fence, sign or shed; $25 for a pool, detached garage, clearing or house revision; $50 for buildings and additions.

How do I schedule an inspection?

Call 609-628-2011 ext. 220 at least the day before, within that trade’s inspection days.

Who issues septic and well permits?

The Cape May County Health Department; a residential septic application is $125 and a well application $125.

Is there a development fee?

Yes: 1.5% of the added equalized assessed value for residential work and 2.5% for commercial, half paid before the permit and the rest before the certificate of occupancy.

Simplify Upper Township permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Upper Township sooner?

Let Alliance prepare, file, and track your Upper Township permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Upper Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.