In the Borough of Pompton Lakes, the Building & Zoning Department at 25 Lenox Avenue (973-835-0143, ext. 223 for building and ext. 241 for zoning) issues construction permits for all interior and exterior work, and Sal Poli is named as Construction Official on the borough’s zoning application. Inspections are booked only by email, exterior projects need a $50 or $75 zoning permit first, and every home sale or new tenancy needs a $90 continued certificate of occupancy.
What requires a building permit in Pompton Lakes?
The borough states the rule broadly: construction permits are required for all interior and exterior construction work on all structures. Its Building Department page then lists the projects people most often ask about, which need a zoning permit, a construction permit or both, and it warns that the list is not complete and that confirming permit needs is the property owner’s responsibility.
Zoning and/or construction permit
- Decks, steps and sheds
- Fences, including like-for-like replacements
- Every pool over 24 inches deep, whether above-ground, in-ground, inflatable or temporary, and hot tubs
- Kitchen and bathroom renovations, plumbing work and water heaters
- Electrical work and EV charging stations
- Driveways, including repaving
- Dumpsters and storage containers (Ordinance 13-21)
- Fuel tank removal or abandonment
- A change of use or of tenant
Exempt under state rules
- Ordinary maintenance as defined in N.J.A.C. 5:23-2.7 needs no permit or inspection
- Minor work under 5:23-2.17A still needs a permit, but it can start once the office has been notified
- Anything not clearly exempt: ask the Building Department at ext. 223 before starting
What Pompton Lakes decides and what the state holds
Technical standards come from the state Uniform Construction Code, which no town can rewrite. Pompton Lakes sets its own zoning (lot coverage of 20% or 25% in the R-3, R-4 and R-5 zones, front-yard fence limits, driveway paving limits), its continued certificate of occupancy under Ordinance 91-30, pool setbacks and engineering review, and its construction fee schedule. Elevator work is not local: the DCA roster lists the Department of Community Affairs as the borough’s elevator subcode official.
Pompton Lakes building department: who handles permitting
Building and zoning share one department. The DCA roster (as of September 2, 2026) lists the Pompton Lakes construction office at the same Lenox Avenue address and number, and the same construction official serves Riverdale in Morris County, which has its own office and roster entry. The two boroughs share the FastTrackGov portal, which the borough page describes as serving both. The counter is open all day, but the Construction/Zoning Official keeps late-afternoon hours, 3:30 to 5:30 p.m. on weekdays, so questions that need the official are best timed for then.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building & Zoning Department, 25 Lenox Avenue, Pompton Lakes, NJ 07442 |
| Phone | 973-835-0143; Building ext. 223, Zoning ext. 241 |
| Fax | 973-831-7494 on the borough page (the DCA roster lists 973-839-8132) |
| Office hours | Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| Construction/Zoning Official hours | Monday to Friday, 3:30 to 5:30 p.m. |
| Inspection requests | In writing to building@pomptonlakes-nj.gov |
| Fire Prevention Bureau | Pompton Lakes Fire Department, 1 Passaic Avenue; 973-616-5918 |
| Elevator subcode | Department of Community Affairs (DCA roster) |
Pompton Lakes permit types
Construction permits use the state application packet; the borough links the DCA construction permit forms from its Building Department page rather than posting its own versions.
Residential permits
- Additions. Zoning approval comes first: the zoning officer reviews a survey showing the addition, and the borough’s FAQ puts that fee at $75. A denial letter leads to a variance application.
- Pools. Zoning approval for the pool and its barrier, a survey no more than five years old with the pool, fence and equipment drawn to scale, and manufacturer sheets for the pump, filter, motor and heater. In-ground pools add a soil movement application and engineer review with a $500 escrow, three sets of sealed drawings by a New Jersey licensed professional, zero net fill unless the engineer approves otherwise, and temporary fencing during construction.
- Fences, sheds, decks and detached garages. A $50 zoning permit with a scaled survey; a fence on a property with a pool also needs a building permit.
- Driveways. A $50 zoning permit even for repaving; paving must cover less than 50% of the front yard and stay at least 5 feet from the side lines.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Businesses use a separate commercial zoning application at ext. 241: $100 for new construction and additions, $75 for accessory structures or a change of use, and $75 for signs, which need specifications and color pictures attached to the plans. The form asks for existing and proposed lot coverage and a sealed, scalable survey. A business sale or new tenant also needs the commercial continued certificate of occupancy under Ordinance 08-28, which costs $200 and cannot be accepted without an approved change of use or tenant zoning permit. The borough’s commercial CCO memo adds two practical points: restroom sinks do not count as drinking water under the plumbing code, so a water cooler or fountain is needed outside the restrooms, and the Fire Prevention Bureau must complete its smoke, carbon monoxide and fire extinguisher check before the business opens.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the construction permit
- Zoning permit. Required for a change of use or tenant and for any exterior project that adds, changes or expands a main or accessory structure, with a sealed, scalable survey of current conditions.
- Board of Adjustment. Hearings are on the fourth Tuesday of each month; a board professional must deem the application complete at least 20 days before the meeting.
- Flood zone. The zoning form asks whether the lot is in a flood zone, the borough links NJDEP’s permits-by-rule guidance and the 2020 flood maps, and elevation certificates for many floodplain buildings are on file in the Building Department.
- Soil movement. In-ground pools need a soil movement permit application and engineering review at the construction permit stage.
Pompton Lakes permit costs and fees
The construction permit fee schedule itself is part of the borough code and is not printed on the Building Department page or its forms, so the office quotes it at ext. 223. The fees the borough does print on its own forms are:
| Item | Fee |
|---|---|
| Zoning application, residential structure (new home or addition) | $75 |
| Zoning application, accessory structure: fence, shed, deck, pool, detached garage | $50 |
| Zoning application, driveway paving | $50 |
| Engineering review escrow, in-ground pool | $500 (more if a soil movement permit is needed) |
| Commercial zoning application | $100 new construction or additions; $75 accessory structure, change of use or sign |
| Residential continued certificate of occupancy (Code 19-3.7) | $90 |
| Commercial continued certificate of occupancy | $200 |
| CCO follow-up inspection | First one free; $25 each after that |
Rather talk it over?
Call 1-855-478-4290 →Section 19-3.7 lets the Construction Official waive the $90 CCO fee when a certificate was issued for the same property within the previous 90 days. On top of the borough’s construction fees, the state adds its training surcharge to each permit. In 2026 the council also adopted Ordinance 26-08 (final adoption March 11, 2026), which amended the affordable housing articles of Chapter 190, including Article XVII on affordable housing development fees; ask the office whether that fee applies to a new house or a large addition.
Trade permits and who may pull them
Electrical, plumbing and fire protection work are separate technical sections of the same state permit, each reviewed by its own subcode official and inspected separately. Contractors need the matching state credential: home improvement contractors are registered with the Division of Consumer Affairs, electrical contractors and master plumbers are licensed by the state, and the builder of a new home registers with DCA. A homeowner doing work on their own home is exempt from contractor registration.
- Pools. The electrical inspector checks bonding and grounding, before backfill on an in-ground pool; wiring to the pool must be at least 18 inches deep and the filter at least 5 feet from the water. Gas lines are inspected and pressure-tested before backfill.
- Water heaters and boilers. Listed on the borough’s permit list; the CCO checklist also looks for a pressure relief blow-off pipe ending 6 inches above the floor.
- EV chargers. Named on the borough’s list of projects that need permits.
- Fuel tanks. Taking out an old tank and abandoning one in place are both on the permit list, so either job is filed before the work starts.
How to apply for a Pompton Lakes building permit
For exterior work or a new use, file the residential or commercial zoning application with a scaled survey and the fee.
If zoning is denied, apply to the Board of Adjustment and allow for the memorialized resolution and appeal period.
Complete the UCC jacket and each subcode section; in-ground pools add sealed drawings and the soil movement application.
Submit at 25 Lenox Avenue; set up a FastTrackGov account to follow the permit online.
Email the address, permit number and preferred dates, and wait for the confirmation.
After the final inspections, obtain the certificate of approval or occupancy before using the work.
Rather not deal with the Pompton Lakes Borough building department?
Get a free quote →Review, corrections and what causes delay
State rules give the construction office 20 business days to act on a complete application, counted only once zoning and other prior approvals are in. Board of Adjustment cases add the most time: after a hearing on the fourth Tuesday, the approval is memorialized by resolution at the next month’s meeting, and a 45-day appeal period runs after the resolution is published. The borough lets an applicant sign a waiver accepting that risk and proceed straight away. Surveys that are not to scale or do not show current sheds, decks and patios will stop a zoning review.
Inspections and certificates in Pompton Lakes
All inspection requests must now be in writing to building@pomptonlakes-nj.gov, giving the property address, the permit number and the dates you want. Staff confirm each request before it goes on the schedule, and the borough is clear that a request without a confirmation is not booked. For pools, the building inspector checks the rebar (steel pool) or pool lock (shotcrete) before concrete, all subcode finals must pass before you apply for the certificate, and a Certificate of Approval is required before anyone swims.
Selling or renting a property
A continued certificate of occupancy is required for the resale of homes and businesses and for every change of tenancy. The residential application costs $90 and the inspection is done Tuesday to Friday between 3:30 and 5:30 p.m. with an adult present. The form says to allow at least five business days; the Building Department page says to allow three weeks for the whole process, so file early. The inspector checks handrails on steps with three or more risers, guards at least 36 inches high with openings under 4 inches where a porch or landing is more than 30 inches up, house numbers on the house itself, secure chimney connections, covered electrical boxes and maintained sidewalks. The borough’s CCO form sends owners to the Fire Prevention Bureau at the Pompton Lakes Fire Department (973-616-5918) for the separate smoke detector, carbon monoxide and fire extinguisher inspection it lists as required before a resale or rental.
New Jersey building code in Pompton Lakes
The borough enforces the state code through its own construction office, with DCA holding the elevator subcode. FEMA’s Community Status Book lists Pompton Lakes (community 345528) in the National Flood Insurance Program with flood maps dated April 17, 2020 and a Community Rating System class 5, worth a 25% discount on eligible flood policies.
New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
Want this handled start to finish?
Get a free quote →Pompton Lakes permit search and official resources
Construction permits can be searched by property address or block and lot on the borough’s FastTrackGov portal after creating an account. Permits from before 2000 may not be in that database; for those, the borough asks for an Open Public Records Act request through the Clerk’s office.
- Building Department: permits, inspections, CCOs and zoning
- FastTrackGov permit portal (Pompton Lakes and Riverdale)
- Residential zoning application
- Commercial zoning application
- Residential continued certificate of occupancy application
- Commercial continued certificate of occupancy application
- Swimming pool guidance
- Zoning and Board of Adjustment FAQs
- Legal notices and 2026 ordinances
- Ordinance 26-08, affordable housing and development fees
- DCA Local Construction Contacts roster
- FEMA Community Status Book, New Jersey
Pompton Lakes building permit FAQs
Inspections are where schedules slip.
Get a free quote →Do I need a permit to replace an old fence in Pompton Lakes?
Yes, a $50 zoning permit even for a same-for-same replacement, with a scaled survey showing the fence; a building permit is also needed if the property has a pool.
How high can a front-yard fence be?
Four feet, and at least 50% open such as chain link or picket. A corner lot has two front yards, so a 6-foot fence on the street side needs a variance.
Does an inflatable pool need a permit?
Yes, if it can hold more than 24 inches of water; the borough lists every pool over that depth, including inflatable and temporary ones.
How do I schedule an inspection?
Only by email to building@pomptonlakes-nj.gov with the address, permit number and requested dates, and only once you receive a confirmation.
What does a seller need in Pompton Lakes?
A $90 continued certificate of occupancy from the Building Department and, as the borough’s CCO form lists it, a smoke, carbon monoxide and fire extinguisher inspection from the Fire Prevention Bureau.
How long does a variance take?
At least two months: the hearing on a fourth Tuesday, the resolution at the next meeting, then a 45-day appeal period unless you sign the waiver.
Do I need a permit to remodel a kitchen or bathroom?
Yes. Kitchen and bathroom renovations, plumbing work and water heaters are all on the borough’s list of projects that need permits, and the work then goes through the plumbing, electrical and building sections of the state application.
Can I look up old permits online?
Most permits since 2000 are on the FastTrackGov portal; older ones need an OPRA request through the Clerk.
Simplify Pompton Lakes Borough permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Pompton Lakes Borough sooner?
Let Alliance prepare, file, and track your Pompton Lakes Borough permits while your crew stays on the job.
More New Jersey permitting guides
Passaic County
Read guide →Totowa Borough
Read guide →Wanaque Borough
Read guide →Princeton Building Permit Guide
Read guide →Rahway Building Permit Guide
Read guide →Ramsey Borough Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Pompton Lakes Borough permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.