Totowa Borough, New Jersey Building Permit Guide

To get a building permit in Totowa Borough, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Totowa’s Building Department on the second floor of the Municipal Complex, 537 Totowa Road, issues construction and zoning permits, and its construction official also acts as the borough’s zoning officer.

Authority: Totowa Building DepartmentRecords: Edmunds Construction Permit Self ServicePhone: 973-956-1000 ext. 1016
Authority
Building Department537 Totowa Road, 2nd floor
Inspections
Call 1 day aheadPhone requests to the Building Department
Home sale
$100 + $100Resale and fire certificates, single-family house
Population
11,166U.S. Census estimate

In the Borough of Totowa, the Building Department at 537 Totowa Road, 2nd floor (973-956-1000 ext. 1016), issues construction permits and handles zoning: Allan Burghardt is named on the borough page as Construction Code Official, Building Subcode Official and Zoning Officer. Inspections are booked by phone at least one day ahead, tree removal, driveways, sidewalks and fence replacements all need permits, and a house cannot change hands without a certificate of re-sale and a fire certificate.

What requires a building permit in Totowa?

Totowa’s own wording is that permits are needed for most improvements to a property, and that anyone unsure should call the Building Department before starting. The page then names four jobs that always need a permit in Totowa: removing any tree, driveways, sidewalks, and replacing a fence.

Permit needed

  • Additions, alterations and new buildings, through the state UCC application
  • In-ground pools, with an engineer’s site plan
  • Sheds and fences, including fence replacements, on the borough’s zoning permit form
  • Driveways and sidewalks
  • Removal of any tree ($35 tree removal permit)
  • Temporary signs, on their own permit form
  • Fire safety permits for regulated activities, from the Fire Prevention Bureau

No permit

  • Ordinary maintenance as the state UCC defines it in N.J.A.C. 5:23-2.7: no permit, notice or inspection
  • Minor work under 5:23-2.17A is different: it still needs a permit, though work may begin after the office is notified
  • The borough asks owners to call before assuming any job is exempt

What Totowa decides and what the state holds

The building, plumbing, electrical and fire standards are the state’s Uniform Construction Code. Totowa’s part is local: its construction fee ordinance, its zoning and land use rules, the tree removal permit, the certificate of re-sale required by Chapter 153-14 of the borough ordinances, and Fire Prevention Bureau programs under Chapter 186. DCA keeps one subcode for itself here, elevators, according to its roster of local construction officials.

Totowa building department: who handles permitting

The Building Department is a small office: the construction code official, who is also the building subcode official and zoning officer, a zoning inspector who doubles as housing and property maintenance officer, and subcode officials for fire, plumbing and electrical work. The DCA roster (as of September 2, 2026) lists the same construction official for Totowa and for neighboring Woodland Park, and gives the office’s direct line as 973-956-7929, the number printed on the borough’s zoning and dwelling certificate forms. The Planning Board Secretary also works out of the Building Department, so board filings and construction permits start at the same counter.

Short on time to read all of this?

Get a free quote →
Totowa permit contacts
DetailInformation
OfficeBuilding Department, Municipal Complex, 537 Totowa Road, 2nd Floor, Totowa, NJ 07512
Phone973-956-1000 ext. 1016 (borough page); 973-956-7929 (DCA roster and forms)
Fax973-956-8159
Office hoursMonday to Friday, 9 a.m. to 4:30 p.m.
Construction official’s hoursMonday to Friday, 2 to 5 p.m.
Plumbing and electrical subcode hoursMonday and Wednesday, 9 to 11 a.m.
Zoning / housing inspector hoursWednesday and Friday, 7:30 to 8:30 a.m. or 4:30 to 6 p.m.
Fire Prevention BureauSame building; 973-956-1000 ext. 1013
Elevator subcodeDepartment of Community Affairs (DCA roster)

Totowa permit types

Totowa does not print its own construction application; its forms page links the state’s UCC construction permit packet, with the jacket and the building, electrical, plumbing and fire sections. Local permits have their own Totowa forms.

Residential permits

  • Sheds and fences. The borough’s zoning permit form asks for the block and lot, the owner, the contractor and the contractor’s license number, and a description of the work.
  • In-ground pools. A standing notice to pool installers requires every application to include a site plan prepared by a New Jersey licensed professional engineer, with three sets of plans at submission; the borough attaches its ordinance and a site plan checklist.
  • Tree removal. A $35 permit; mark each tree with string or tape (never paint), do not book the tree service until the permit is approved, and expect the tree service to chip and haul all debris. The borough may require a landscape plan or replacement trees, and an approved permit is valid for three months. The borough also has a Shade Tree Commission, which meets on the third Monday of the month at 7 p.m. at the Totowa Library.
  • Rentals. A dwelling certificate and smoke detector certificate are needed when a rental gets a new occupant, and landlords file a registration statement.

Commercial permits

Commercial work goes through the same UCC application, with site changes reviewed by the Planning Board; the forms page carries a minor site plan application. A business that receives the Fire Prevention Bureau’s registration survey must return it within 30 days, under a $500 penalty for each failure, and regulated activities need a fire safety permit. In October 2026 the council adopted Ordinance 18-2026, adding a “Rapid Entry System” article to the Fire Prevention chapter of the code; ask the Fire Bureau how it applies to a new or altered commercial building.

Not sure this scope needs a permit?

Get a free quote →

Along Route 46, the Planning Board set a public hearing for November 12, 2026 at 7:30 p.m. on whether Block 177, Lots 2, 2.01, 3 and 3.01 (1 and 75 Route 46) should be designated a non-condemnation area in need of redevelopment, following council resolutions 46-2026 and 104-2026. The study map and the preliminary investigation report are kept in the Planning Board Secretary’s office inside the Building Department and on the borough’s affordable housing page; if the board recommends designation, the decision moves to the Borough Council.

What comes before the construction permit

  • Zoning. Because the construction official is also the zoning officer, zoning questions go to the same office; sheds and fences use the borough’s zoning permit form, which carries his name.
  • Planning Board and Board of Adjustment. Application paperwork goes to the Building Department at least 15 days before a meeting; agenda places are first come, first served.
  • Flood maps. The Building Department page posts the five volumes of the FEMA flood maps for the borough.
  • Zoning map and master plan. The borough posts its zoning map with the 2014, 2016 and 2018 master plan re-examinations, so an owner can see the zone and planning policy for a lot before applying.
  • Soil and county approvals. Larger sites that disturb more than 5,000 square feet need a soil conservation district plan, and work affecting a county road needs Passaic County approval.

Totowa permit costs and fees

Totowa’s construction fee schedule is part of the borough code and is not reproduced on its website, so the Building Department gives the fee for each permit. The amounts the borough prints on its own forms are below; the state training surcharge is collected on top of the construction fee.

Totowa fees printed on borough forms
ItemFee
Certificate of re-sale, single-family house$100
Fire certificate, single-family house$100
Certificate of re-sale, two-family house$200
Fire certificate, two-family house$200
Tree removal permit$35
Fire safety permit, Type 1 / Type 2$54 / $214
Fire safety permit, Type 3 / Type 4$427 / $641
Business registration survey not returned within 30 days$500 penalty per occurrence

Rather talk it over?

Call 1-855-478-4290 →

The resale and fire certificate fees are paid as two separate checks to the Borough of Totowa, one for each certificate. Ordinance 19-2026, introduced on October 27, 2026 and listed for final passage on November 10, 2026 (ask the Clerk whether it was adopted), would opt the borough into the Garden State C-PACE program, which finances clean energy and resiliency work on commercial property; it is not a permit fee.

Trade permits and who may pull them

Electrical, plumbing and fire work are filed on their own subcode sections of the state packet and inspected by the borough’s subcode officials; plumbing and electrical inspectors keep Monday and Wednesday morning hours. New Jersey does not license general contractors: a contractor doing home improvements must be registered with the Division of Consumer Affairs, a builder of new homes registers with DCA, and electrical contractors and master plumbers carry state licenses. The borough’s own forms ask for the contractor’s license or registration number. A homeowner working on their own home does not need a contractor registration.

  • Pools and spas. The re-sale checklist requires hard-wired ground fault protection for pool and spa receptacles.
  • Gas appliances. Vents from gas-fired appliances and the connection from the water heater, furnace or boiler to the chimney are both on the list the inspector checks when a house is sold.
  • Water meters. Every home must have an external reading device on the water meter.

How to apply for a Totowa building permit

1. Call the Building Department

Ask whether the job needs a permit, zoning review or a board approval; the construction official is available weekday afternoons.

2. Clear zoning and boards

File the shed and fence form, or get board paperwork to the Building Department 15 days before the meeting.

3. Prepare the state packet

Complete the UCC jacket and subcode sections; in-ground pools add an engineer’s site plan in three sets.

4. File and pay

Submit at 537 Totowa Road and pay the fee the office calculates from the borough schedule.

5. Set up online access

Request a username and ID for Construction Permit Self Service to follow the permit.

6. Book inspections

Phone the Building Department at least one day before each inspection.

Rather not deal with the Totowa Borough building department?

Get a free quote →

Review, corrections and what causes delay

State rules give the office 20 business days to approve or deny a complete application, and an application waiting on zoning or another prior approval is not yet complete. Board cases set the pace for bigger projects: the Planning Board meets on the second and fourth Thursday at 7:30 p.m. and the Board of Adjustment on the second Wednesday at 7 p.m., and the borough has carried applications to a later meeting at the applicant’s request. The Planning Board posts its 2026 agendas and minutes on the borough site, and its last 2026 meeting date listed is December 10.

Inspections and certificates in Totowa

Inspections are scheduled by calling the Building Department at least one day ahead. Each trade is inspected by its own subcode official, and a certificate of occupancy or approval follows the final inspections.

Selling or renting a home

Chapter 153-14 of the borough ordinances says occupancy or possession of a building cannot pass from one person to another without a certificate of re-sale. The packet costs $100 for the resale certificate and $100 for the fire certificate on a single-family house, or $200 each on a two-family house, and the buyers must bring photo ID for every adult moving in and birth certificates for minor children. The inspection looks for open permits, illegal construction and illegal two-family or multifamily use, as well as house numbers on the house and mailbox, gas appliance vents, installed meters, a pressure relief pipe ending within 6 inches of the floor, handrails on steps with four or more risers and fire separations. A home on a private well must submit a clean well test, or the certificate is not issued. The Fire Prevention Bureau’s current checklist calls for a smoke detector on every level and within 10 feet of each bedroom door, sealed 10-year batteries in battery units, carbon monoxide alarms within 10 feet of bedrooms and a service report for monitored alarm systems; it says a fire extinguisher is no longer required (Bill A3894, February 3, 2025), although the older sale packet still lists one.

New Jersey building code in Totowa

Totowa enforces the state code through its own Building Department, with DCA covering elevators. FEMA’s Community Status Book lists Totowa (community 340408) in the National Flood Insurance Program, with flood maps dated April 17, 2020.

New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules

Want this handled start to finish?

Get a free quote →

Totowa permit search and official resources

Owners can see every permit recorded on their property, including its history, through the borough’s Edmunds Construction Permit Self Service after the Building Department issues a username and ID; contractors see the permits on which they are listed. Older files are requested with the borough’s OPRA public records form (revised 2024) on the forms page, which can be faxed to 973-956-8414.

Inspections are where schedules slip.

Get a free quote →

Totowa building permit FAQs

Do I need a permit to take down a tree in Totowa?

Yes. Any tree removal needs the $35 permit, approved before the tree service is booked; the permit lasts three months.

Is a permit needed to replace an existing fence?

Yes. Fence replacements are on the borough’s permit list and use the zoning permit form for sheds and fences.

How do I schedule an inspection?

Call the Building Department at least one day before you need it.

What does selling a house cost in Totowa?

$200 for a single-family house ($100 resale certificate plus $100 fire certificate) or $400 for a two-family house, paid as two separate checks.

Who is Totowa’s zoning officer?

The construction code official, Allan Burghardt, also serves as zoning officer, so zoning and building questions go to the same office.

What does an in-ground pool application need?

A site plan prepared by a New Jersey licensed professional engineer, submitted in three sets with the construction application.

Does a rental need an inspection when the tenant changes?

Yes. The borough’s forms include a dwelling certificate and smoke detector certificate for rentals, which lists the current owner and the new occupants and requires access to the entire structure and property for the inspection.

Can I see my property’s permit history online?

Yes, through Construction Permit Self Service once the Building Department sets up your username and ID.

Simplify Totowa Borough permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Totowa Borough sooner?

Let Alliance prepare, file, and track your Totowa Borough permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Totowa Borough permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.