Moorestown Township, New Jersey Building Permit Guide

To get a building permit in Moorestown Township, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Moorestown’s Construction Office on the second floor of Town Hall, 111 West Second Street, takes permit applications, payments and inspection requests online through the SDL portal as well as at the counter.

Authority: Moorestown Construction OfficeZoning permit: $50Phone: 856-235-0912 ext. 3018
Authority
Township Construction OfficeTown Hall, 2nd floor; DCA handles elevators
Apply
SDL online portalOr the counter, 8:30 a.m. to 4:30 p.m.
Home alterations
$45 per $1,000First $50,000; $65 minimum per subcode
Selling a home
Smoke/CO certificateFire Prevention Bureau, 856-234-1222

In Moorestown Township, construction permits are issued by the Construction Office in the Department of Community Development, Town Hall, 111 West Second Street (856-235-0912, ext. 3018), where Joseph LaRocca is the Construction Official. Owners and contractors can file, pay by card, schedule inspections and track permits through the SDL portal, after a $50 zoning permit where one is needed. The posted fee schedule (revised 2025) charges $45 per $1,000 for the first $50,000 of a home alteration, and every sale needs a smoke and CO certificate from the Fire Prevention Bureau.

What requires a building permit in Moorestown?

The Construction Office handles permits, plan reviews, inspections and code compliance under the state code and the township code, and it publishes a homeowner’s guide aimed at the remodelling projects people most often take on: kitchens, bathrooms, bedrooms, living areas and new closets. The Zoning Office lists the projects that need a zoning permit, and many of them need both.

Zoning permit (and usually a UCC permit)

  • Decks, patios and porches
  • New dwellings and additions
  • Fences and retaining walls
  • Pools and pool houses
  • Sheds and garages
  • Signs
  • Some interior renovations, such as finished basements

UCC permit with flat fees

  • Roofing or siding on a one- or two-family home, where the state code requires a permit
  • Sheds up to 400 square feet and other non-occupiable structures such as gazebos and carports
  • Radon mitigation systems
  • Residential solar arrays
  • Wood stoves and solid-fuel chimney liners
  • Light poles and flagpoles with footings

The state draws the outer boundary: ordinary maintenance needs no permit, and minor work can begin as soon as the office is notified, with the paperwork following. Anything in a mapped flood hazard area also goes through the township’s floodplain development permit before zoning or construction review.

What Moorestown decides and what the state holds

Moorestown cannot change the technical code. It controls the enforcing agency, the construction fees in Chapter 56 (§56-3 and its Schedule A), zoning, the floodplain development permit process run by a certified floodplain manager, grading review by the Township Engineer, a Historic Preservation Commission, landlord registration, and a joint Bureau of Fire Prevention shared with Maple Shade.

Moorestown building department: who handles permitting

The Construction Office sits in the Department of Community Development with the Planning and Zoning Offices, all on the second floor of Town Hall. DCA’s roster of local enforcing agencies (as of September 2, 2026) shows Moorestown with its own construction official, who is also the fire protection subcode official, its own building, electrical and plumbing subcode officials, and the Department of Community Affairs for elevators. The same construction official also serves Florence Township.

Short on time to read all of this?

Get a free quote →
Moorestown permit contacts
DetailInformation
Construction OfficeTown Hall, 111 West Second Street, 2nd floor, Moorestown, NJ 08057
Phone / fax856-235-0912, ext. 3018 / 856-914-3019
Service counter8:30 a.m. to 4:30 p.m.
Inspectors by phoneUsually 8 to 9 a.m. and 2:30 to 3 p.m.
Construction OfficialJoseph LaRocca, also fire subcode official
Online permitsSDL portal (free account)
Zoning and planningSame floor, 856-235-0912
Fire Prevention Bureau225 North Lenola Road, 856-234-1222
ElevatorsNJ Department of Community Affairs

Moorestown permit types

Moorestown files everything on the state UCC jacket and technical sections, and the Construction Office posts its own permit checklist, the air barrier and framing checklists, the required-inspection list, smoke and CO alarm rules, a shared pool barrier form, deck and finished basement guides, the chimney certification and an occupancy placard.

Residential permits

  • Remodels. Fill in pages 1 and 2 of the F-100, including the building and site characteristics, plus the building, electrical, plumbing and fire sections the job needs.
  • Plans. Two sets of plans signed and sealed by a New Jersey architect, or drawn by a homeowner who signs each sheet and the affidavit on page 2 of the application.
  • New houses. Four sets of grading plans for the Township Engineer, a survey or site plan, a $550 grading review check, and the builder’s registration number.
  • Pools and barriers. Pools carry flat fees, fences used as pool barriers are $75, and the township posts a form for neighbors sharing a pool barrier.

Commercial permits

Commercial projects use the same forms with sealed design documents, and fees follow the non-residential lines of Schedule A: volume-based fees for new buildings ($0.036 per cubic foot for single-story S-1 and S-2 storage), cost-based fees for fit-outs, and per-square-foot sign fees. A certificate of occupancy for an existing non-residential building is $250, as is one for a change of use.

Not sure this scope needs a permit?

Get a free quote →

What comes before the construction permit

  • Floodplain screening. Every application is checked for the special flood hazard area; if it is in one, the certified floodplain manager decides within about 10 business days whether a development permit is needed, and any NJDEP permit must be in hand before the local application moves on.
  • Zoning. The zoning permit costs $50 and needs a coverage worksheet and survey; it also has a public works and utility sign-off line.
  • Soil and septic. The checklist asks for Burlington County Soil Conservation District approval (609-267-7410) where it applies, and Burlington County Health Department approval for well or septic systems on new houses and additions that add bedrooms.
  • County roads. A lot fronting a county road needs an access permit from the Burlington County Department of Engineering.
  • Pinelands. Moorestown is not on the Pinelands Commission’s list of Pinelands municipalities.

Moorestown permit costs and fees

The Construction Office posts a “Municipal Construction Permit Fee Schedule (Revised 2025)”, which is Schedule A to §56-3 of the township code. Its cover page reproduces the fee ordinance with the 2025 ordinance number left blank and the 2019 notice for Ordinance 3-2019, so confirm with the office that the posted figures are the ones in force. The schedule includes:

Selected Moorestown fees (Schedule A, revised 2025)
ItemFee
New construction and additions$0.048 per cubic foot ($0.036 single-story S-1/S-2)
Alterations, first $50,000$45 per $1,000
Alterations, $50,001–$100,000 / over $100,000$35 / $30 per $1,000
Roofing or siding, R-3 / R-5 homes, where a permit is needed$78 each
Pool, above-ground / in-ground (homes)$105 / $255
Shed up to 225 sq ft / 226–400 sq ft$75 / $130
Residential solar (building)$175
Plumbing fixture (homes)$20 each; water heater $65; furnace or boiler $85
Electrical fixtures, first 25 / each additional 25$69 / $45
Electrical service up to 150 amps / 150–300 amps$100 / $175
Certificate of occupancy, new work10% of the permit fee, $100 minimum
Certificate of continued occupancy$180
Minimum per subcode$65
Plan review20% of the new-construction permit fee
Electronic plan review surcharge$1 per $1,000 of value, $2 minimum
Zoning permit / new-house grading review$50 / $550

Rather talk it over?

Call 1-855-478-4290 →

Worked example from Schedule A: a $40,000 kitchen remodel in a single-family house falls inside the first band, so the building fee is 40 × $45 = $1,800, with plumbing fixtures at $20 each and the electrical fee on top. The schedule does not say whether the lower bands apply only to cost above each threshold, so get the office’s figure for jobs over $50,000. Amendments to released plans cost $90 an hour, work handled by a third-party agency carries a 55% administrative fee, and the state training surcharge is added to most permits.

Trade permits and who may pull them

Moorestown’s checklist sets the licensing rule plainly: electrical and plumbing permits must be signed and sealed by a licensed contractor unless a homeowner is doing the work in their own occupied home. Each trade is a technical section of the UCC application, reviewed and inspected by its subcode official, and the township’s directory lists separate building, electrical and plumbing subcode officials and a plumbing and mechanical inspector.

  • Electrical: fixtures in blocks of 25, motors and generators by rating, service equipment and solar battery back-up by amperage, and photovoltaic systems with a $175 minimum.
  • Plumbing and gas: per fixture, plus sewer connections ($109), water services, gas piping and LPG tanks; testable backflow preventers need yearly certificates of compliance.
  • Mechanical: for replacements in existing homes, the mechanical fee replaces the plumbing fee: water heater $65, furnace or boiler $85, air conditioning alone $50, and no fee for air conditioning installed with a new furnace.
  • Fire: sprinklers, alarms, hood systems and fuel tanks under the fire subcode.

Contractors must give the office a builder’s registration number for new homes or a home improvement contractor number for other residential work. New Jersey licenses electrical contractors, master plumbers and HVACR contractors, but not general contractors.

How to apply for a Moorestown building permit

1. Screen for flood and zoning

Check the township flood map link and the zoning requirements for your district; file the $50 zoning permit where needed.

2. Open an SDL account

Sign up on the SDL portal for online submission, card payment and permit tracking, or plan to file at the counter.

3. Complete the F-100 and technicals

Fill in pages 1 and 2, the building and site characteristics, and each technical section, with licensed contractors’ seals on electrical and plumbing.

4. Attach plans and approvals

Two sets of sealed or owner-drawn plans, the survey, grading plans for new houses, and soil, health and county approvals.

5. Answer plan review comments

Comments come back by email through SDL; revise and resubmit.

6. Pay and post the permit

Pay online by card or at the counter, then display the permit and schedule inspections through SDL.

Rather not deal with the building department?

Get a free quote →

Review, corrections and what causes delay

Moorestown’s development permit process states that plan review is done within 20 business days of submission, with seven days for a re-review, in line with the UCC’s 20-business-day limit for a decision on a complete application. Files in a flood hazard area take longer: the floodplain manager’s determination comes first, and any project needing an NJDEP permit is suspended until that permit arrives. Missing grading plans, county approvals and contractor registration numbers are the other common holdups on the checklist.

Inspections and certificates in Moorestown

Inspections are scheduled online through the SDL portal and are performed every weekday between 8:30 a.m. and 2:30 p.m. Inspectors take calls at about 8 to 9 a.m. and 2:30 to 3 p.m., depending on the day’s schedule. The township’s required-inspections list sets the order for each subcode, and in flood areas the floodplain manager or the subcode inspectors check the elevation work alongside the UCC inspections. A New Jersey licensed land surveyor must submit an elevation certificate when the first floor is framed and again when work is complete, and results are posted on the SDL public portal.

New work ends with a certificate of occupancy (10% of the permit fee, $100 minimum) or a certificate of approval, and a temporary CO can be extended for $30. Selling or renting a home brings in the Bureau of Fire Prevention: no change of ownership or occupancy may happen before a successful smoke and CO inspection, and doing it without one carries a penalty of $100 to $2,500 under the state fire code. You apply online, pay the inspector at the visit, and must have every detector working beforehand. The number and type of smoke alarms depend on when the house was built (sealed 10-year battery alarms before 1975, hardwired alarms with battery backup on every level and in bedrooms since 1991), CO alarms must sit within 10 feet of sleeping areas and be less than seven years old, and homes with solar, batteries or generators need a “multiple sources of power” label at the panel and meter. The Bureau also tells the Construction Office about every application so open permits and violations can be found before closing.

New Jersey building code in Moorestown

Moorestown enforces the Uniform Construction Code through its own construction office, with DCA covering elevators. FEMA’s Community Status Book lists Moorestown (community 340105) as participating in the National Flood Insurance Program, with flood maps effective August 28, 2019, and the township’s floodplain development permit applies to work in the mapped flood hazard area.

Want this handled start to finish?

Get a free quote →

New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules

Moorestown permit search and official resources

Permit status and inspection results for current applications are on the SDL portal. Older permits, plans and certificates are township records; the Township Clerk’s page provides the Open Public Records Act application, and the Clerk’s Office is at Town Hall (856-914-3015). Landlords of one- and two-family rentals also file their landlord information statement with the Clerk, and rental units need a Fire Prevention Bureau inspection. Appeals from a construction or fire official go to the Burlington County Construction Board of Appeals.

Inspections are where schedules slip.

Get a free quote →

Moorestown building permit FAQs

Can I apply for a Moorestown permit online?

Yes. The SDL portal accepts permit submissions, card payments and inspection requests around the clock, and shows permit status.

How much does a remodel permit cost?

The building fee is $45 per $1,000 of cost up to $50,000 for a house, so a $40,000 job is $1,800 before the trade fees; each subcode has a $65 minimum.

Can I draw my own plans?

Yes. A homeowner may draw their own plans by signing each sheet and the affidavit on the application; otherwise plans are sealed by a New Jersey architect.

Do I need an inspection to sell my house?

Yes, a smoke and carbon monoxide certificate from the Bureau of Fire Prevention before the change of ownership.

How much is a zoning permit?

$50, paid by cash or check with the application and coverage worksheet.

Is my lot in a flood zone?

The township screens every application for the special flood hazard area; if it is, the floodplain manager decides within about 10 business days whether a development permit is needed.

Who handles elevators?

The New Jersey Department of Community Affairs.

Simplify Moorestown Township permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Moorestown Township sooner?

Let Alliance prepare, file, and track your Moorestown Township permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Moorestown Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.