In Maple Shade Township, construction permits are issued by the Construction Office at the Municipal Building, 200 Stiles Avenue (856-779-9610, ext. 114), where Ed Toussaint is the Construction Official. Most exterior projects need a zoning permit first ($10 for a home, with a scaled survey), and inspections are booked only by email. Under the Housing Code adopted on November 20, 2025, a property cannot be sold or newly rented without a township certificate of occupancy inspection, which costs $125 for a home and requires open permits to be closed.
What requires a building permit in Maple Shade?
Maple Shade’s Construction Office applies the state rules on what needs a UCC permit, and its zoning code adds a separate permit for most changes to a property. Section 205-81 requires a zoning permit before putting up any fence or swimming pool, before building or structurally altering any building or structure, and before any new use or change of use.
Construction (UCC) permit
- New homes, additions and finished basements
- Decks, which are inspected open where the floor is within 48 inches of grade
- Furnaces, water heaters, air conditioners and other appliances
- Drywall and interior alteration work
- Pools, hot tubs and fire or alarm systems
- Demolition
Zoning and other township permits
- Zoning permit for fences, pools, sheds, additions and any change of use
- Grading plan with escrow for every new dwelling
- Street excavation permit for work in a township street, including new driveway aprons
- Dumpster permit, with police approval of placement
- Housing Code certificate before a sale or new tenancy
Under the state rules, ordinary maintenance needs no permit and minor work may begin as soon as the office has been notified, with the permit to follow. The township’s housing checklist shows why skipping a permit catches up with owners: water heaters, furnaces, air conditioning, decks, finished basements and drywall are its own examples of work that must be permitted and closed out before a sale can go ahead.
What Maple Shade decides and what the state holds
The building code is set by the state. Maple Shade controls zoning (Chapter 205), fees and escrows (Chapter 88), street excavations (Chapter 175), property maintenance (Chapter 152) and the 2025 Housing Code (Chapter 155) with its certificate of inspection on every sale. It adopted short-term rental rules in 2025, rewrote its affordable housing and development fee articles and its outdoor lighting standards in 2026, and runs a joint fire prevention bureau with Moorestown.
Maple Shade building department: who handles permitting
The Construction Office enforces the UCC for the township. DCA’s roster of local enforcing agencies (as of September 2, 2026) lists the same local official as construction official and building, fire protection and plumbing subcode official, a separate local electrical subcode official, and the Department of Community Affairs for elevators. Land use, zoning, housing inspections and rental registration sit with the Director of Community Development, Kyle Wagner, who is also the Zoning Officer. Fire code work is handled by the Bureau of Fire Prevention, which now serves both Maple Shade and Moorestown.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Construction Office | 200 Stiles Avenue, Maple Shade, NJ 08052 |
| Phone / fax | 856-779-9610, ext. 114 / 856-779-2524 |
| Hours | Monday to Thursday 8:30 a.m. to 4:30 p.m.; Friday 8:30 a.m. to 1:30 p.m. |
| Construction Official | Ed Toussaint |
| Inspection requests | Inspections@mapleshade.com |
| Zoning, housing and CO inspections | Community Development, ext. 151, Zoning@MapleShade.com |
| Fire Official | Ext. 179; Bureau of Fire Prevention, 225 N. Lenola Road, Moorestown, 856-234-1222 |
| Elevators | NJ Department of Community Affairs |
Maple Shade permit types
The Construction Office posts the state jacket and the building, electrical, plumbing, fire and mechanical technical sections, the framing checklist, the chimney verification for fuel-fired equipment, the UCC certificate application and its dumpster permit. Zoning, land use, street excavation and housing forms are on the Community Development page.
Residential permits
- Fences. A zoning permit with a survey or plot plan showing the fence line, height, length and material; every fence must stand at least 3 inches inside your property line.
- Additions and accessory structures. A zoning permit with setbacks and a building and lot coverage worksheet listing the house, garage, sheds, driveway, patios, decks and pool.
- New houses. A grading plan with a $600 initial escrow for engineering review and inspection, plus $800 more where curb and sidewalk are required.
- Rentals. One- and two-unit rentals register online for $100 a unit and are inspected on Tuesday and Thursday evenings; certificates expire each June 30.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial fit-outs need the zoning permit ($25 for commercial) and the UCC application, and a business moving into or buying a space needs a commercial certificate of inspection under Chapter 155, priced by use group and floor area: a business, mercantile, storage or utility space of up to 4,000 square feet is $100 and an assembly space $125, rising in steps for larger floors. Site plans and use variances go to the Joint Land Use Board.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the construction permit
- Zoning permit. Approved by the Zoning Officer; it becomes void if the use or structure is not started within one year.
- Joint Land Use Board. Meets on the third Wednesday of the month at 6:30 p.m.; a “c” variance application costs $100 plus a $300 escrow and a “d” variance $200 plus $1,000.
- Road openings. Township streets need a street excavation permit ($50 plus a $200 inspection fee). Main Street, Lenola Road, Stiles Avenue and South Fellowship Road are county roads, so work there goes to the Burlington County Engineer (856-642-3800).
- Soil disturbance. More than 5,000 square feet needs Burlington County Soil Conservation District certification.
- Pinelands. Maple Shade is not on the Pinelands Commission’s list of Pinelands municipalities.
Maple Shade permit costs and fees
Maple Shade keeps its fees in the township code, mainly Chapter 88 (“Fees and Escrow”), which the township publishes on eCode360. The Construction Office page does not post the UCC permit fee schedule, and the office works out the construction fee from the technical sections when the permit is approved; call ext. 114 for a quote. The township forms do print these fees:
| Item | Fee |
|---|---|
| Zoning permit, residential / commercial (Ch. 88) | $10 / $25 |
| Grading plan review for a new dwelling | $600 initial escrow |
| Curb and sidewalk review | $800 additional escrow |
| “C” variance (bulk) | $100 application + $300 escrow |
| “D” variance (use) | $200 application + $1,000 escrow |
| Street excavation | $50 application + $200 inspection ($100 sidewalk-only or sump discharge) |
| Residential CO / CCO inspection on sale or rental | $125, covering the first re-inspection |
| Each further re-inspection | $65 |
| Transfer of title, vacant property sold as-is | $75 |
| Commercial certificate, business use up to 4,000 sq ft | $100 |
| Rental registration, 1–2 units | $100 per unit |
| Development fees (Article XXII) | 1.5% residential; 2.5% non-residential |
Rather talk it over?
Call 1-855-478-4290 →Worked example from Chapter 155: a house that fails its sale inspection and passes on the second visit pays only the $125 initial fee, because it covers the first re-inspection; if a third visit is needed the total becomes $190. The development fees apply to new residential or non-residential development, not to ordinary home improvements. The state training surcharge is added to UCC permits on top of the local fee.
Trade permits and who may pull them
Maple Shade issues electrical, plumbing, mechanical and fire work as technical sections of the one UCC application, each inspected under its own subcode. The township’s inspection list shows what each trade must have ready:
- Electrical: underground piping and grounding before any concrete, rough wiring with boxes and recessed lights in place, the service with breakers labelled and cover off, above-ceiling work, and a final before furnishings go in.
- Plumbing: underground water, sewer, septic and storm lines before backfill; rough plumbing holding a pressure test or filled 10 feet above the highest drain; gas piping under test; final with temperatures set to the National Standard Plumbing Code.
- Fire: sprinkler underground pressure tests, above-ceiling supports, hood systems with the contractor present and a transmittal report, smoke and CO detectors in place, and alarm testing.
- Mechanical: fuel-fired appliances need the chimney verification form when a furnace or water heater is replaced.
Licensing is state-level: electrical contractors, master plumbers and HVACR contractors hold New Jersey licenses, home improvement contractors register with the Division of Consumer Affairs, and new-home builders register with DCA; there is no state general contractor license, and owners working on their own homes do not need home improvement registration. Local business licenses fall under Chapter 114 (“Licenses and Permits”), with the forms on the Community Development page.
How to apply for a Maple Shade building permit
File the zoning permit with a current scaled survey, the coverage worksheet and the $10 or $25 fee at 200 Stiles Avenue.
Fill in the F100 and the technical sections that match the work, with the cost of each part.
Attach construction plans, and for a new house the grading plan and escrow deposit.
Street excavation for driveway aprons in township streets, county approval on county roads, and a dumpster permit if a container goes on the street.
File with the Construction Office during office hours; the fee is set when the application is approved.
Keep approved plans on site and email each inspection request at least 24 hours ahead.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The UCC gives the office 20 business days to approve or deny a complete application. In Maple Shade, files most often stall on a zoning permit without a current scaled survey, a coverage worksheet that leaves out driveways or patios, a missing grading plan for a new house, or a project that needs Joint Land Use Board relief before zoning can be approved.
Inspections and certificates in Maple Shade
Inspection appointments must be requested by email to Inspections@mapleshade.com with the permit number, property address, type and detail of the inspection and the date wanted, at least 24 hours ahead; the office says an inspection may take up to three working days. The two township sources differ on timing: the Construction Office page lists Monday and Wednesday from noon to 2 p.m. and Tuesday and Thursday from 7 to 10 a.m., while the March 2026 inspection sheet says all inspections are on Tuesdays and Thursdays from 7 a.m. to 2 p.m. Approved plans must be on site, nothing may be covered before approval, and no building may be used before its certificate of occupancy.
Building inspections run footing, foundation forms, foundation, slab, sill plate (with bolts, straps and termite shield), open deck, sheathing, framing with truss bracing and sealed drawings on site, insulation and final. A new home’s final requires the duct or blower-door test, the warranty, the Township Engineer’s grading approval, special inspection reports and the energy certificate in the utility room.
The sale rules are strict. Since Ordinance 2025-18 was adopted on November 20, 2025, no home or business may be sold, transferred or newly occupied by a tenant without a Certificate of Inspection / Certificate of Continued Occupancy from the Housing Inspector or Code Enforcement Officer. The inspection covers the interior and exterior, all open permits must be closed, and violations must be fixed within 90 days (120 if you ask before the 90 days end) or the application lapses. The township says this residential CO form has replaced the old resale smoke alarm application; it checks sealed 10-year smoke alarms on each level and in each bedroom and CO alarms within 10 feet of sleeping areas. A vacant property sold as-is can instead get a $75 transfer-of-title certificate, but the buyer must apply for the CO inspection within 120 days.
New Jersey building code in Maple Shade
Maple Shade enforces the Uniform Construction Code through its own construction office, and DCA handles elevators. FEMA’s Community Status Book lists Maple Shade (community 340101) as participating in the National Flood Insurance Program, with flood maps effective December 21, 2017.
Want this handled start to finish?
Get a free quote →New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
Maple Shade permit search and official resources
Maple Shade has no online permit search. To get information about permits issued for a property, the Construction Office says to complete an Open Public Records Act request form and submit it to the Township Clerk; the form can be hand-delivered, mailed, faxed or emailed, and the Clerk’s Office answers questions at ext. 166. Appeals of construction or fire official decisions go to the Burlington County Construction Board of Appeals, but local Housing Code certificates cannot be appealed there.
- Maple Shade Construction Office
- Required inspections for UCC permits
- Zoning permit application (July 2025)
- Land Use and Community Development
- Certificate of occupancy on sale or rental
- Ordinance 2025-18, Housing Code
- Residential CO application
- Housing inspection checklist
- Street excavation permit application
- Land use application and escrow fees (§88-10)
- Rental registration and inspections
- Fire Official and Bureau of Fire Prevention
- OPRA requests
- DCA local construction contacts roster
- FEMA Community Status Book, New Jersey
Inspections are where schedules slip.
Get a free quote →Maple Shade building permit FAQs
Do I need an inspection to sell my house in Maple Shade?
Yes. Chapter 155 requires a township certificate of occupancy inspection before any sale; it costs $125 and all open permits must be closed first.
How much is a zoning permit?
$10 for a residential application and $25 for a commercial one, with a current scaled survey.
How do I book a construction inspection?
Only by email to Inspections@mapleshade.com, at least 24 hours ahead; allow up to three working days.
Do I need a permit for a fence?
Yes, a zoning permit, and the fence must sit at least 3 inches inside your property line.
Who handles driveway aprons on Lenola Road or Main Street?
Those are county roads, so the Burlington County Engineer; township streets need a $50 street excavation permit plus a $200 inspection fee.
Are rentals inspected?
Yes. One- and two-unit rentals register for $100 a unit and are inspected before a new tenant moves in; certificates expire June 30.
Who is the construction official?
Ed Toussaint, at 200 Stiles Avenue.
Simplify Maple Shade Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Maple Shade Township sooner?
Let Alliance prepare, file, and track your Maple Shade Township permits while your crew stays on the job.
More New Jersey permitting guides
Medford Township
Read guide →Moorestown Township
Read guide →Mount Laurel Township
Read guide →Marlboro Township Building Permit Guide
Read guide →Maywood Borough Building Permit Guide
Read guide →Metuchen Borough Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Maple Shade Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.