Municipal GuideNew JerseyBrick Township · Ocean County

Brick Building Permit — Filed & Tracked For You

Brick will not accept a foundation until a plot plan showing its position against the lot lines and the elevation of its top against mean sea level has been certified by the Township Engineer as matching the survey filed with the permit — and on the bay and ocean front, Chapter 196 puts every new or substantially improved house on pilings.

Scope: Brick TownshipCode route: New Jersey Uniform Construction Code (N.J.A.C. 5:23)Trades: State licensed
Authority
Building Department401 Chambers Bridge Road
Foundations
Plot plan certified by the Township EngineerBefore any foundation is approved
Coast
Pilings or columns above base floodChapter 196, open below
Rentals
Rental certificate of occupancyBefore each occupancy

Brick Township's Building Department at 401 Chambers Bridge Road enforces the Uniform Construction Code for a shore township that spans the mainland, the Barnegat Bay front and a stretch of barrier island, and Chapter 145 of the township code adds a step between the footing and the framing: neither the Construction Official nor any building subcode official may accept or approve any foundation until the applicant has submitted a plot plan showing the foundation's location against the side, front and rear lot lines and the elevation of its top against mean sea level, and the Township Engineer has certified that plan as conforming to the survey filed with the permit application.

Chapter 196, Flood Damage Prevention, governs the rest of the shore parcel. In the coastal high-hazard areas all new construction and substantial improvements are elevated on pilings or columns so that the bottom of the lowest horizontal structural member sits at or above the base flood level, with the space below left open except for breakaway walls, and anchored against flotation, collapse and lateral movement under the one-percent wind and water loads — and every requirement of the chapter and the UCC is met before a certificate of occupancy issues.

This guide covers Brick Township. Toms River, Lakewood, Point Pleasant and Mantoloking are separate Ocean County municipalities with their own enforcing agencies, and Ocean County issues no construction permits.

📜

The foundation stops for the engineer. Chapter 145 says no foundation shall be accepted or approved until a plot plan showing its location against the lot lines and the elevation of the top of the foundation in relation to mean sea level has been submitted and certified by the Township Engineer as conforming to the survey information filed with the permit. Order the as-built foundation survey the day the forms come off, or the framing inspection cannot be called.

What requires a building permit in Brick?

New Jersey runs on a single statewide instrument, the Uniform Construction Code (N.J.A.C. 5:23), in force since January 1977 and administered by the Department of Community Affairs. Rather than writing its own code, the state adopts the national model codes as subcodes with New Jersey amendments: the International Building Code (building subcode), the International Residential Code for one- and two-family dwellings, the National Standard Plumbing Code — not the International Plumbing Code used in neighbouring states — the National Electrical Code, and the mechanical, fuel gas and energy codes. The 2024 editions of the I-codes and the NSPC, with the 2023 NEC, took effect on August 17, 2026 and replace the 2021 editions and the 2020 NEC; the usual six-month grace period lets an applicant file under either edition until roughly mid-February 2027. Under N.J.S.A. 52:27D-119 et seq. no municipality, Brick included, may adopt different technical standards — what is local is the enforcing agency, the fee ordinance, the zoning approvals that precede the permit, and the certificates that follow it.

The UCC itself draws the exemption line. Ordinary maintenance under N.J.A.C. 5:23-2.7 needs no permit, no notice and no inspection; minor work under 5:23-2.17A needs a permit but may begin once the enforcing agency has been notified, with the application filed and inspected afterwards. Everything else waits for the issued permit.

Typically permit required

  • Every foundation, which needs the Township Engineer's plot plan certification before the building subcode official will approve it
  • Any rental unit, which needs a rental certificate of occupancy from the Construction Code Official before initial occupancy and before each re-occupancy after a vacancy
  • Commercial, industrial and office buildings, multiple dwellings, condominium projects and places of worship, which need Planning Board site plan approval before the building permit
  • New buildings, additions and any structural work on an existing building
  • Interior alterations that reconfigure space, add plumbing fixtures or extend circuits — renovation, alteration and reconstruction under the rehabilitation subcode
  • Decks, and sheds over 200 square feet, over ten feet tall or with any utility connection

Often exempt

  • Ordinary maintenance under N.J.A.C. 5:23-2.7 — and a condominium unit owner's ground-level rear deck or deck enclosure is exempt from the site plan rule
  • Painting, wallpapering and interior finishes on less than a quarter of the wall area of a house
  • Like-for-like replacement of windows and doors in the same opening, and glass in any window or door
  • Roofing and siding replacement on a one- or two-family dwelling
  • Garden sheds up to 200 square feet and ten feet high with no utilities, and fences up to six feet — the zoning permit still applies to both

What is actually local, and what is not

Technical standards are the state's. Brick's layer is the local enforcing agency — the construction official and the building, electrical, plumbing and fire subcode officials, each licensed by the state under N.J.A.C. 5:23-5 — plus the municipal fee ordinance, the zoning officer's sign-off, and the foundation plot plan certification and the rental certificate regime that Chapter 145 and Chapter 225 place around the construction permit.

Who handles permitting in Brick?

The Building Department is the enforcing agency, with the Construction Official and the building, electrical, plumbing and fire subcode officials reviewing their sections of the state UCC jacket, and cost data submitted separately for each subcode. The Township Engineer certifies foundation plot plans and administers Chapter 196 in the flood hazard areas; the Planning Board approves site plans for anything that is not a one- or two-family house; and the Construction Code Official issues rental certificates of occupancy under Chapter 225.

Brick permitting contact
DetailInformation
DepartmentBrick Township Building Department
Office401 Chambers Bridge Road, Brick, NJ 08723
Phone(732) 262-1027
FoundationsPlot plan with top-of-foundation elevation, certified by the Township Engineer
RentalsRental certificate of occupancy before each occupancy under Chapter 225
Cost dataSeparate cost for building, plumbing, fire, electrical, mechanical and elevator work

Permit types

Residential permits

A Brick house project files the state UCC jacket with the subcode sections at Chambers Bridge Road, with zoning sign-off attached, cost data broken out by subcode, and the home improvement registration number on the application. After the footing inspection the foundation is surveyed and the plot plan goes to the Township Engineer for certification before the building subcode official approves it; on the bay or ocean front Chapter 196 sets the elevation on pilings, and CAFRA or flood hazard approvals from DEP come before the permit. A house that will be rented needs the rental certificate of occupancy before the tenant moves in.

How New Jersey contractor credentials work

New Jersey has no state general contractor license. What it has instead is a registration that doubles as a permit gate: a home improvement contractor business must be registered with the Division of Consumer Affairs under the Contractors' Registration Act (N.J.S.A. 56:8-136 et seq.), and N.J.A.C. 5:23-2.15(b)8 requires the registration number on the construction permit application — an enforcing agency may not issue a home improvement permit to an unregistered contractor. Registration now carries commercial general liability insurance of at least five hundred thousand dollars per occurrence, workers' compensation cover and a tiered compliance bond, and the 2024 Home Improvement and Home Elevation Contractor Licensing Act is phasing in individual licensing through a new state board. New construction is different: a new-home builder registers with the Department of Community Affairs under the New Home Warranty and Builders' Registration Act and shows the builder registration card at permit. Electrical contractors, master plumbers and HVACR contractors hold separate state licenses from Consumer Affairs boards. Owners working on their own home are exempt from registration, and Brick licenses no trades of its own.

Commercial permits

Commercial, multi-family and institutional work in Brick starts with Planning Board site plan approval under Article XLVI — no building permit issues without it, and no certificate of occupancy issues unless construction conforms to the approved plan. Construction review follows under Chapter 145, with an additional cost estimate for barrier-free work in primary function spaces, and the certificate of occupancy for a multi-tenant building is priced for the common areas plus each tenant space.

Prior approvals, subcode review and the twenty-day clock

A New Jersey construction permit is one application with technical sections — the state's UCC F100 jacket with building, electrical, plumbing, fire and mechanical subcode forms — and each subcode official reviews their own section. The permit cannot issue until the prior approvals are in hand: zoning or planning board approval under the Municipal Land Use Law is a separate track that precedes the construction permit, and where a project touches a county road or county drainage the county planning board signs off as well. Sites disturbing 5,000 square feet or more need soil erosion certification from the regional soil conservation district, and DEP approvals apply in flood hazard, wetland and coastal areas. In Brick the DEP's coastal and flood hazard approvals are prior approvals across the bay front and barrier island, the Ocean County Soil Conservation District certifies disturbance over 5,000 square feet, and the county planning board reviews access to county roads. Once complete, N.J.A.C. 5:23-2.16 gives the enforcing agency twenty business days to approve or reject a complete application, with a written list of deficiencies on any rejection.

Brick permit costs and fees

Fees follow Chapter 145 of the Brick code — the subcode, plan review, demolition, sign, certificate and elevator fees the chapter lists — plus the state training fee, with land use fees set under the land use chapter.

Brick fee reference points
ItemFee or rule
Construction permitSubcode fees under Chapter 145, with cost data broken out per subcode, paid before issuance
Certificate of occupancyTen percent of the permit fee for all use groups except multi-tenant buildings
Multi-tenant certificateTwo hundred dollars for the common areas plus one hundred fifty per tenant space
Rental certificateRental certificate of occupancy fee before each initial occupancy and re-occupancy
Barrier-free estimateAdditional cost estimate for work in primary function spaces and the accessibility share of it
State training feeAdded to every permit under N.J.A.C. 5:23-4.19
⚠️

Cost data is filed per subcode. Chapter 145 requires the cost data on the application to indicate the cost for work regulated by each subcode — a separate figure for building, plumbing, fire, electrical, mechanical and elevator work — and, where barrier-free requirements apply, a further estimate of the work in the primary function space and the percentage that improves accessibility. A single lump sum is returned for breakdown.

Trade permits and who may pull them

Trade work is permitted through the same application under the electrical, plumbing, fire and mechanical subcode sections, and inspected by the subcode official for each.

Permit required

  • Foundations — Township Engineer's certification of the plot plan and top-of-foundation elevation before approval
  • Electrical — state-licensed electrical contractor; electrical subcode section
  • Plumbing and gas piping — state-licensed master plumber; plumbing subcode section under the NSPC
  • HVAC and fuel-fired equipment — licensed HVACR contractor; mechanical or fire subcode section
  • Fire protection, alarms and sprinklers — fire subcode section, with fire official review

Typically exempt

  • Like-for-like fixture, receptacle, switch and light fixture replacement in the same location
  • Communications and low-voltage wiring in a house that does not penetrate a fire-rated assembly

How to apply for a Brick building permit

1. Settle zoning first

A zoning permit or planning board approval under the Municipal Land Use Law precedes the construction permit.

2. Confirm the credential the permit needs

The home improvement registration number, or the new-home builder registration card, goes on the application.

3. Assemble the UCC jacket and subcode forms

One F100 application with the building, electrical, plumbing, fire and mechanical sections the scope requires, plus sealed plans where the UCC demands them.

4. Clear prior approvals

Soil conservation, county planning board, DEP or overlay agency sign-offs are attached before the permit can issue.

5. Pay on the municipal fee ordinance

Fees follow the local ordinance plus the state training fee surcharge, and are due before issuance.

6. Call inspections in sequence and close out

Footing to final under 5:23-2.18, then the certificate of occupancy or approval that closes the permit.

Review, corrections and what actually causes delay

Brick reviews on the state's twenty-business-day clock, and the reviews actually lost here are the ones that skip a gate: site plan approval before the permit for anything commercial or multi-family, the engineer's foundation certification before framing, and the rental certificate before a tenant is placed.

Inspections in Brick

N.J.A.C. 5:23-2.18 sets the inspection sequence statewide — bottom of footing trenches, foundation and backfill, rough framing, electrical and plumbing, insulation, and final — and the enforcing agency must inspect within three business days of the request. Work that passes final receives a certificate of occupancy for new buildings or changes of use, or a certificate of approval for everything else. Brick inspects by subcode from the Building Department, with the foundation held until the Township Engineer certifies the plot plan; in flood hazard areas the elevation on pilings is verified under Chapter 196 before the certificate of occupancy, and rental units are inspected for the rental certificate under Chapter 225.

Brick permit search and official resources

Frequently asked questions

Why is my Brick foundation inspection on hold?

Chapter 145 bars the Construction Official and building subcode official from approving any foundation until a plot plan showing its location and top-of-foundation elevation has been certified by the Township Engineer as conforming to the survey filed with the permit.

Do rentals need a certificate in Brick?

Yes. Chapter 225 requires a rental certificate of occupancy from the Construction Code Official before each initial occupancy and before re-occupancy after a unit is vacated.

What does the flood ordinance require on the bay front?

In coastal high-hazard areas, new construction and substantial improvements sit on pilings or columns with the lowest horizontal structural member at or above the base flood level, open below except for breakaway walls, and anchored against the one-percent wind and water loads.

Does a commercial building need site plan approval first?

Yes. Article XLVI bars a building permit for commercial, industrial, office, multiple-dwelling, condominium and place-of-worship buildings until the Planning Board approves a site plan.

How is the certificate of occupancy priced?

Ten percent of the permit fee for all use groups except multi-tenant buildings, which pay two hundred dollars for the common areas plus one hundred fifty per tenant space.

Which code edition applies?

The New Jersey editions of the 2024 I-codes with the 2023 National Electrical Code and the 2024 National Standard Plumbing Code, effective August 17, 2026, with a six-month grace period during which the 2021 editions may still be used.

Simplify Brick permitting with Alliance Permitting

Brick inserts an engineer between the footing and the frame and a certificate between the landlord and the tenant. We file with cost data by subcode, order the foundation survey the day the forms come off, and keep the elevation and rental paperwork moving to the certificate.

Ready to break ground in Brick sooner?

Send us the scope and the parcel. We confirm the review path with the Brick Township Building Department, assemble the submittal, file it, and track it through issuance — corrections included.