Swansea’s Building Department, led by the Building Commissioner, handles building, wiring, gas, plumbing and mechanical permits from 68 Stevens Road, and the town’s PermitLink e-permitting site takes applications for Building Services alongside the Board of Health, Fire Department, Public Works and the zoning and wetlands offices. The department says the fee schedules in place since January 2, 2022 charge a new home $0.45 per square foot, basements, garages and decks included.
Swansea describes itself as a rural and suburban community on the coast, and its zoning maps a Floodplain District that includes VE velocity zones, while its wetlands bylaw reaches 100 feet from beaches, dunes, flats and land subject to coastal storm flowage. A town bylaw also voids any permit whose work does not start within 90 days.
The department covers the whole Town of Swansea. Somerset, Fall River, Rehoboth, Seekonk and Dighton each run their own building departments.
What requires a building permit in Swansea?
The town bylaw says no building, structure or foundation may be built, altered or moved without a permit from the inspector of buildings, and the department’s permit page lists the work it covers.
Swansea permits
- Additions, renovations, alterations and changes of use or occupancy
- New residential and commercial construction, prefabricated structures and manufactured homes
- Re-siding, re-roofing and replacement windows
- Demolition or moving a structure, with Health Department notice for hazardous materials
- Accessory structures and sheds over 200 square feet
- Fire warning and suppression systems, which also need a Fire Department permit
- Electrical, low voltage, burglar alarm, mechanical, refrigeration, HVAC and any plumbing installation or repair
- Fireplaces, wood stoves, power vents, pools, decks, temporary structures and signs
What the department does not permit
- Sheds of 200 square feet or less need no building permit
- The permits page says fences on private property need no permit; a fence along the side or front of the house is checked with the Highway Department
- A fence is required only around an in-ground pool: at least 4 feet high and non-climbable
- An above-ground pool at least 4 feet high with a deck or ladder and no fence needs a locking gate
What the town decides and what the state holds
The State Building Code and the state electrical, plumbing and gas codes come from state boards, and Swansea cannot amend them. Town meeting adopts the general bylaws, including Chapter 133 on buildings, Chapter 256 on wetlands and Chapter 265 on zoning; Swansea’s code on eCode360 includes legislation through the May 19, 2025 town meeting, with an October 27, 2025 zoning amendment awaiting codification.
Swansea building department: who handles permitting
The inspector of buildings, titled Building Commissioner, is appointed by the Select Board and grants permits to erect, alter or move buildings; the electrical inspector and the plumbing and gas inspector issue and inspect the trade permits. The Board of Health and the Conservation Commission share the 68 Stevens Road address and phone line.
Short on time to read all of this?
Get a free quote →| Office | Role | Contact |
|---|---|---|
| Building Department | Building, electrical, plumbing, gas and mechanical permits and inspections | (508) 674-5731; fax (508) 324-6706; Building Commissioner Michael Antunes |
| Board of Health | Septic systems, health permits, demolition hazardous-materials notice | (508) 674-5731, option 4 |
| Conservation Commission | Wetlands bylaw and Wetlands Protection Act filings | (508) 674-5731, ext. 5 |
| Planning Board | Site plan review and subdivisions | Planning Board page |
| Zoning Board of Appeals | Variances, special permits and appeals | ZBA page |
The Building Department is open Monday to Thursday 8 am to 4:30 pm and Friday 8 am to 1 pm, and closes for lunch from 1 to 2 pm. The Board of Health keeps the same hours.
Permit types
Residential permits
PermitLink lets anyone browse as a guest; registering is free and is needed to apply, pay and add attachments, and the site needs pop-ups enabled. The department’s process is the same for building, wiring, gas, plumbing and mechanical work: call with questions, submit the application after consulting the other boards and departments whose approval is needed, then wait for plan review against the codes and bylaws.
Two bylaw rules shape house lots. No building may be placed within 15 feet of the line of a public way or an approved private way, eaves, downspouts and open steps excepted, and no permit may issue for a lot without frontage on a public way unless the street is on an approved, recorded subdivision plan.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
The commercial schedule charges $10 per $1,000 for new construction and for additions, renovations, roofing and siding. Signs are $100 each, or $150 to replace or reface; mechanical work is $125 per unit; a commercial occupancy permit is $100; and a certificate of inspection for a place holding more than 400 people is $150. Demolishing a commercial building is $150 and a commercial accessory structure $75, a temporary tent $100, new antennas and towers $20 per $1,000, and swapping antennas on an existing tower $200 per antenna. Fire detection, sprinkler systems and fuel storage also need inspection approval from the Fire Department.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning Board site plan review: since the May 19, 2025 amendment, no building permit issues without site plan review for a structure needing more than five parking spaces or a drive-through, changes to parking or circulation (the board may waive enlargements under 15%), large-scale solar or multifamily developments. A by-right change of use that leaves the footprint and parking alone is exempt.
- Zoning Board of Appeals: variances, special permits and appeals under Chapter 265; the permits page says ZBA, Planning Board, Conservation Commission and state environmental decisions must all be complied with.
- Conservation Commission: the wetlands bylaw covers work within 100 feet of freshwater and coastal wetlands, banks, beaches, dunes and flats, water bodies and the ocean, and land subject to flooding or coastal storm flowage. The commission meets on the second and fourth Mondays at 6 pm at the Swansea Police Station, 1700 GAR Highway.
- Board of Health: septic approvals, and notice before a demolition about disposal of hazardous materials such as mercury thermostats, oil, lead and asbestos.
- Floodplain District: the overlay covers Zones A, AE and VE on FEMA maps dated July 7, 2009 and July 16, 2014, and in Zone AE the best available floodway data are used to bar encroachments that would raise base flood levels.
Swansea permit costs and fees
The department’s fee page says the residential and commercial schedules effective January 2, 2022 are in place. The fee section of the town bylaws, section 133-6 as last amended on November 10, 2014, still prints older figures, such as $0.25 per square foot for a new house and $50 for a residential occupancy permit, so the two official sources disagree; the department’s 2022 schedules are the later document. Under both, work done without a permit can cost three times the fee.
| Permit | Fee |
|---|---|
| New residential construction, including basements, garages and decks | $0.45 per sq ft |
| Additions and garages | $10 per $1,000 |
| Alterations, renovations, repairs, finished basements | $10 per $1,000 |
| Decks and open porches | $0.45 per sq ft, $100 minimum |
| Siding, windows and doors | $8 per $1,000 |
| Strip and re-shingle roof | $10 per $1,000 |
| Sheds over 200 sq ft; detached garages | $0.45 per sq ft |
| Above-ground pool or hot tub / in-ground pool | $75 / $10 per $1,000 |
| Residential occupancy permit | $75 |
| Re-inspection; duplicate permit | $50; $50 |
| Commercial new construction, additions, renovations | $10 per $1,000 |
| Accessory building | $10 per $1,000 |
| Demolition of an accessory building / moving a building | $100 / $125 |
| Residential certificate of inspection | $60 |
| Commercial foundation only / temporary sign / maintenance | $100 / $75 / $150 |
| Carnival | $100 per day |
| Working without a permit | 3 times the permit fee |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a house with 1,800 square feet of living space, a 600 square foot basement and a 480 square foot garage is measured at 2,880 square feet, so the permit is 2,880 × $0.45 = $1,296, plus the $75 occupancy permit. A $45,000 renovation pays 45 × $10 = $450.
Trade permits and who may pull them
Electrical permits come from the electrical inspector and plumbing and gas permits from the plumbing and gas inspector, both at the Building Department. Massachusetts requires licensed electricians, plumbers and gas fitters for that work, a Construction Supervisor License holder for structural work unless a homeowner files under the code, and Home Improvement Contractor registration on existing owner-occupied homes. The bylaw also requires written notice to the inspector of wires before any wiring is installed.
| Permit | Fee |
|---|---|
| Residential basic wiring (lights, switches, outlets, service) | $75 with one inspection; $40 for each extra inspection |
| New home, complete: overhead / underground | $150 / $175 maximum |
| Appliances, oil and gas burners, alarms | $40 each, one inspection |
| Central air, low voltage, sewage pump, hot tub, above-ground pool | $50 |
| In-ground pool | $90 |
| Solar PV system | $6.25 per panel |
| Generator, residential / commercial | $50 / $100 |
| Commercial work | $75 up to $5,000, plus 1% above $5,000 |
| Re-inspection; after-hours emergency call | $40; $175 |
Electrical work done without a permit is charged double, and the bylaw says no permit fee is refunded. The department’s fee page does not post a plumbing and gas schedule.
Rather not deal with the building department?
Get a free quote →How to apply for a Swansea building permit
The town’s own first step is to read its permit pages and then call (508) 674-5731 with any questions.
Get any Conservation Commission, Planning Board, ZBA or Board of Health approval the project needs, and check the Floodplain District map.
Create a free account and choose Building Services, or the Zoning and Wetlands or Board of Health forms if they come first.
Attach plans, licenses and approvals; fire alarm or sprinkler work also needs a Fire Department permit.
The department says you will hear within 30 days whether the permit is approved, denied or needs more documents.
Begin work within 90 days of the permit date and do not stop for more than six months, or the permit becomes void.
Review, corrections and what causes delay
Swansea’s 30-day notice matches 780 CMR 105.3.1, which requires a decision within 30 days of filing. Projects slow down when an approval from another board is missing: the department expects applicants to have consulted the Conservation Commission, Planning Board, ZBA and Board of Health first, and their decisions bind the permit.
Inspections in Swansea
Each phase of work is inspected for completeness and compliance with the approved plans, and the permit itself lists the inspections required. The department’s rule of thumb is “call before you cover”: work must be inspected before it is covered up. Fire detection, sprinkler and fuel storage work also needs Fire Department inspection approval.
A failed building inspection is $50 to repeat and an electrical one $40. Final inspections lead to the occupancy permit where one is required, $75 for a home and $100 for a commercial building.
Building and energy code in Swansea
Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules
Swansea enforces the 10th edition of 780 CMR. Its code on eCode360, current through the May 2025 annual town meeting, contains no bylaw adopting the Stretch or the Municipal Opt-in Specialized energy code. The Historical Commission’s own page describes an advisory role, and the code contains no demolition-delay bylaw. The Floodplain District bylaw relies on Bristol County flood map panels dated 2009 and 2014. FEMA lists Swansea as a participating National Flood Insurance Program community, with flood maps effective July 16, 2014.
Swansea permit search and official resources
PermitLink’s guest option lets the public view information without registering. For older permits and plans, ask the Building Department or file a request through the Town Clerk’s public records page.
Want this handled start to finish?
Get a free quote →- Swansea Building Department — staff, hours, contact
- Swansea PermitLink e-permitting — applications and guest view
- Permit process — six steps and the 30-day decision
- Permits — work that needs a permit, fences and sheds
- Fee schedule as of January 2, 2022 — fee page
- Residential fee schedule — January 2, 2022
- Commercial fee schedule — January 2, 2022
- Town Code Chapter 133, Buildings — permits, fees, pool enclosures
- Chapter 133, Article III, Standards — setbacks, frontage, fees
- Chapter 256, Wetlands Protection — 100-foot jurisdiction
- Chapter 265, Zoning — districts and boards
- Zoning Article VII, Floodplain Districts — Zones A, AE, VE
- Section 265-9.1, Site plan approval — Planning Board triggers
- Conservation Commission — meetings and waterways plan
- Board of Health — septic and health permits
- Planning Board — forms and fees
- Zoning Board of Appeals — agendas and bylaws
- Historical Commission responsibilities — advisory role
- Public records request — Town Clerk
- FEMA Community Status Book, Massachusetts — flood insurance participation
Inspections are where schedules slip.
Get a free quote →Swansea building permit FAQ
What does a building permit for a new house cost in Swansea?
$0.45 per square foot under the January 2022 schedule, with basements, garages and decks counted, plus a $75 occupancy permit. The bylaw text still shows an older $0.25 rate.
Do I need a permit for a fence in Swansea?
The department says fences on private property do not need a fence permit, but a pool fence must be at least 4 feet high and non-climbable, and a fence beside or in front of the house should be checked with the Highway Department.
Do I need a permit for a shed?
Not for a shed of 200 square feet or less. A larger shed needs a building permit at $0.45 per square foot and must meet the zoning bylaw.
How long does Swansea take to decide on a permit?
The department says it will tell you within 30 days of the application whether the permit is approved, denied or needs more documents.
How long is a Swansea building permit valid?
Work must start within 90 days of the permit date, and the permit is void if work stops for more than six months.
Can I build on a lot without road frontage?
Not unless the street is on an approved and recorded subdivision plan; the bylaw bars permits for land without frontage on a public way.
Which energy code applies in Swansea?
The town code shows no Stretch or Specialized code adoption; the 10th edition of the State Building Code applies.
Simplify Swansea permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Swansea sooner?
Let Alliance prepare, file, and track your Swansea permits while your crew stays on the job.
More Massachusetts permitting guides
Acushnet
Read guide →Attleboro
Read guide →Dartmouth
Read guide →Taunton Building Permit Guide
Read guide →Tewksbury Building Permit Guide
Read guide →Tyngsborough Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Swansea permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.