Sharon, Massachusetts Building Permit Guide

To get a building permit in Sharon, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Sharon’s Building Division at 217R South Main Street issues building, wiring, plumbing and gas permits through the Town’s OpenGov portal and sees the public by appointment only.

Authority: Sharon Building DivisionCode: 780 CMR, 10th edition, Specialized Energy CodePhone: 781-784-1525 ext. 2310
Authority
Building Division217R South Main Street
Apply online
OpenGov portalPlus a $5–$15 tech fee
House fee
$75 plus $11 per $1,000One- and two-family work
Energy code
Specialized Energy CodeBylaw § 125-25, from Jan. 1, 2025

In Sharon, the Building Division at 217R South Main Street (781-784-1525, ext. 2310) issues building, electrical, plumbing and gas permits, which are filed online through the Town’s OpenGov portal. Work on a one- or two-family home costs a $75 base fee plus $11 per $1,000 of construction value, plus a technology fee of $5 to $15, and new buildings fall under the Municipal Opt-in Specialized Energy Code that Town Meeting adopted with an effective date of January 1, 2025.

What requires a building permit in Sharon?

Sharon, a town of about 18,800 residents (Census estimate, 2025), prices its permits by job type, and its fee page names the work the Building Division permits: new and existing one- and two-family construction, commercial buildings (which in Sharon include residential buildings of three or more units), reroofing and siding, residential and commercial mechanical and HVAC work, wood stoves, signs and tents. Swimming pools, detached garages and stables carry their own setback rules in the division’s FAQs. The division’s own answers also mark two limits: a one-story detached shed, playhouse or similar structure of no more than 200 square feet needs no building permit, and a fence over 6 feet tall needs a permit, which the Town issues at the Department of Public Works.

Building permit

  • New homes, additions and alterations to one- and two-family homes
  • Commercial and three-plus-unit buildings
  • Reroofing and siding
  • Mechanical and HVAC systems
  • Pools, detached garages and accessory buildings over 200 sq ft
  • Wood stoves, signs and tents

No building permit (per the FAQs)

  • One-story detached sheds and playhouses of 200 sq ft or less (setbacks still apply)
  • Fences up to 6 ft (taller fences need a DPW permit)

What Sharon decides and what the state holds

780 CMR, the State Building Code, is written by the Board of Building Regulations and Standards and Sharon cannot amend it. The Town sets its own permit fees under Chapter 148 of its General Bylaws, its Zoning Bylaw, its wetlands bylaw (Chapter 262), four local historic districts and a demolition delay bylaw (Chapter 174), and an in-building radio bylaw for larger buildings (Chapter 125). It also chose its energy code path: Stretch in 2017, then the Specialized Energy Code from 2025.

Sharon building department: who handles permitting

The Building Division issues and inspects building, electrical, plumbing and gas permits. Its FAQs name David Abbott as the Building Inspector (781-784-1525, ext. 2313). The building inspector keeps office hours by appointment only; the plumbing and gas inspector and the electrical inspector have no office hours, so questions for them go through the division’s main line.

Short on time to read all of this?

Get a free quote →
Sharon Building Division
DetailInformation
Office217R South Main Street, Sharon, MA 02067 (mail: Box 517)
Phone781-784-1525, ext. 2310; inspections and appointments 781-784-1525
Office hoursBy appointment only, Monday to Thursday 8–9:30 am and 2–4:30 pm
Online filingOpenGov permit portal
Town Hall90 South Main Street, 781-784-1500

Street opening permits and right-of-way work are approved by the Town Engineer, not the Building Division, and the Engineering staff also witness percolation tests for septic design.

Sharon permit types and the approvals that come first

Applications are made in the OpenGov portal, where each permit carries a technology fee to cover the software: $5 when the permit fee is $50 or less, $10 between $50.01 and $200, and $15 above $200.01. The division posts the workers’ compensation affidavit for building permits and an installation requirements sheet for energy storage systems.

Residential permits

New and existing one- and two-family work is charged the same rate, $75 plus $11 per $1,000, and reroofing, siding and residential HVAC follow that formula too. Detached garages must be 10 feet from property lines and other structures (an attached garage meets the house setbacks). An in-ground pool must sit 20 feet from any leaching field, cesspool, seepage pit or septic tank and 10 feet from buildings and lot lines, and may not go in the front setback; above-ground pools need 10 feet all round. Pool fences must be at least 4 feet high and permanent, with self-closing gates latching at 4 feet and no gap over 4 inches. Stables need 50 feet from neighboring dwellings, lot lines and the street, and short-term rentals pay $200 for an annual inspection.

Commercial permits

Sharon treats buildings with three or more units as non-residential and charges $75 plus $16 per $1,000. Under Chapter 125, new buildings and existing buildings renovated under the existing-building chapter of 780 CMR must include an in-building public safety radio system that reaches 95% of each floor; one- and two-family dwellings and wood-frame buildings without metal construction or underground parking are exempt, and no certificate of occupancy issues until the system complies. Annual inspections cost $75, or $100 for alcohol licensees.

The radio system must deliver a signal of at least -95 dBm in 95% of each floor, including stairwells, both to and from the Sharon Fire and Police dispatch centers and Norfolk County Fire Dispatch; it must run on its own batteries for at least 12 hours, its amplifiers sit in two-hour protected space in watertight NEMA 4 cabinets, and the owner must test it at least once every 12 months and send the results to the Fire or Police Department. The cost and upkeep stay with the building owner, including after a sale.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning: house setbacks are in the Town’s zoning dimensional spreadsheet; relief goes to the Zoning Board of Appeals on its application for hearing, and the division asks that ZBA questions be sent by email.
  • Conservation Commission: the Commission administers the Wetlands Protection Act and the Sharon Wetlands Bylaw from the Community Center, 1 Community Center Drive (781-784-1511).
  • Board of Health (Title 5): septic plans go through the Health Department (781-784-1500, ext. 1143); perc tests need 48 hours’ notice to Engineering, and a Title 5 inspection report, required when property changes hands, is valid for two years.
  • Historic districts: work that changes the exterior of a building in one of the four local historic districts needs a certificate from the Historic District Commission, which has 50 days to decide. District 1 covers the church, parsonage and library parcels around North Main and High Streets; District 2 is Cobb’s Tavern at 41 Bay Road; District 3 is the former Wilber School at 75 South Main Street with 21 South Pleasant Street; and District 4, added by the May 2025 Town Meeting, is the William R. Mann House at 228 East Street.
  • Right-of-way: any digging in the public way needs an $85 street opening permit, possible bonding under Article 35A, and a $100 Sharon contractor’s license under Article 35B.

Sharon building permit fees

The Building Division’s Permit Fees page carries the current schedule; it shows no adoption date, and Chapter 148 of the General Bylaws provides for a published Town fee schedule under state law. Every fee-paid permit also carries the technology fee.

Sharon building permit fees (Building Division fee page)
ItemFee
One- and two-family, new or existing$75 base plus $11 per $1,000
Commercial, including 3 or more units, new or existing$75 base plus $16 per $1,000
Reroof or siding$75 base plus $11 per $1,000
Mechanical / HVAC$75 plus $11 per $1,000 (residential); $75 plus $16 per $1,000 (commercial)
Amend, renew or transfer a permit$75
Wood stove; signs and tents$75 each
Full occupancy permit / temporary occupancy (3 months)$75 / $150
Plan research$40
Re-inspection$75
Off-hours inspection (weekends, holidays, evenings)$250 per inspection
Stop work order$100 base fee plus any fine
Work started before the permitDouble the permit fee
Technology fee$5 (fee up to $50); $10 ($50.01–$200); $15 (over $200.01)

Rather talk it over?

Call 1-855-478-4290 →

For example, an $80,000 addition to a single-family house costs $75 plus 80 × $11, or $955, and because that is over $200.01 the $15 technology fee brings the payment to $970. A $12,000 reroof is $75 plus 12 × $11, or $207, plus $15.

Trade permits and who may pull them

Electrical, plumbing and gas permits are filed in the same portal and inspected by Sharon’s own inspectors. The three trades share one fee formula, with a higher base for new construction than for work on an existing building:

Sharon electrical, plumbing and gas permit fees
PermitFee
New one- and two-family$150 base plus $12 per $1,000
Existing one- and two-family$75 base plus $12 per $1,000
New commercial (3 or more units)$200 base plus $16 per $1,000
Existing commercial$100 base plus $16 per $1,000
Re-inspection$75
Work done without a permit more than five days after startingDouble the permit fee

A $10,000 electrical job in an existing house is $75 plus 10 × $12, or $195, plus the $10 technology fee. Electricians, plumbers and gas fitters hold state licenses and pull their own permits; the building permit itself goes to a Construction Supervisor License holder (with Home Improvement Contractor registration for work on an existing owner-occupied home) or to an owner using the state code’s homeowner exemption.

Rather not deal with the building department?

Get a free quote →

How to apply for a Sharon building permit

1. Check setbacks and zoning

Use the dimensional spreadsheet and the FAQs on garages, pools and sheds; email ZBA questions.

2. Clear Conservation, Health and history

File with the Conservation Commission, arrange perc tests and septic review, and check the historic districts and demolition bylaw.

3. Arrange right-of-way work

Get a street opening permit and contractor’s license from Engineering for any work in the public way.

4. Apply in OpenGov

Upload plans, license and insurance details and the workers’ compensation affidavit.

5. Pay the fee

Pay the permit fee and the technology fee through the portal.

6. Inspect and occupy

Book each inspection by phone and finish with the occupancy permit.

Review, corrections and what causes delay

The building official must issue the permit or deny it in writing within 30 days of filing (780 CMR 105.3.1). In Sharon, a file can also wait on decisions from other boards: a Conservation order, a Historic District Commission certificate, a Historical Commission demolition finding, or Board of Health septic review. Energy compliance documents must match the Specialized code for new buildings, and the office’s appointment-only hours mean questions are best raised before filing.

Inspections in Sharon

All inspections are by appointment, booked by calling 781-784-1525. Each trade inspects in its own window: building inspections Monday, Tuesday and Thursday from 10 am to 1 pm and Friday from 9 am to noon; electrical Monday, Wednesday and Friday from 7 to 10 am; plumbing and gas Monday, Wednesday and Thursday from 12:30 to 3:30 pm. Engineering inspections need 24 hours’ notice. A re-inspection costs $75 and an evening, weekend or holiday inspection $250. A finished project closes with a $75 full occupancy permit; a temporary occupancy permit is $150 for three months, and larger buildings covered by the radio bylaw must pass the Fire and Police coverage test first.

Sharon building and energy code

Sharon enforces the 10th edition of 780 CMR. The Annual Town Meeting of May 1, 2017 adopted the Stretch Energy Code (Chapter 125, Article III), and the Annual Town Meeting of May 6, 2024 added § 125-25, which adopts the Municipal Opt-in Specialized Energy Code (225 CMR 22 and 23 with Appendices RC and CC) with an effective date of January 1, 2025; the Building Division’s energy code page still describes only the 2017 vote. The demolition delay bylaw covers buildings at least 100 years old or of unknown age, buildings on or in a National Register area, and those in the Historical Commission’s Cultural Resources Inventory. The Commission makes an initial finding within 14 days; after a hearing, a building found preferably preserved cannot be demolished for 12 months. Demolishing without a permit risks a fine of up to $300 a day and a two-year bar on building permits for the site. FEMA lists Sharon as a participating community in the National Flood Insurance Program, with flood maps effective July 8, 2025.

Want this handled start to finish?

Get a free quote →

Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules

Sharon permit search and official resources

Permits filed online are kept in the OpenGov portal. For older records, the Building Division points property owners to a shared Google Drive with folders by property, holding past septic plans and permits; not every property has a folder, and contents vary. Anything else can be requested from the division ($40 for plan research) or through a public records request.

Inspections are where schedules slip.

Get a free quote →

Sharon building permit FAQ

Who issues building permits in Sharon, MA?

The Building Division at 217R South Main Street (781-784-1525, ext. 2310). It also issues electrical, plumbing and gas permits.

Can I walk in to see the building inspector?

No. Office hours are by appointment only, Monday to Thursday, 8 to 9:30 am and 2 to 4:30 pm.

How much is a building permit for an addition in Sharon?

$75 plus $11 per $1,000 of value, plus the technology fee; an $80,000 addition comes to $970.

Do I need a permit for a shed?

Not for a one-story detached shed of 200 square feet or less, but it must still be 10 feet from property lines and other structures.

Do I need a permit for a fence?

Fences over 6 feet tall need a permit from the Department of Public Works.

Which energy code applies to a new house in Sharon?

The Specialized Energy Code, under bylaw § 125-25, effective January 1, 2025.

How long can the Town delay demolishing an old house?

12 months from the Historical Commission’s finding, if the building is at least 100 years old (or inventoried) and found preferably preserved.

Where can I find old septic plans or permits?

On the Building Division’s shared Google Drive folders by property, or by asking the division.

Simplify Sharon permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Sharon sooner?

Let Alliance prepare, file, and track your Sharon permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Sharon permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.