Skip to main content
Municipal GuideMassachusettsTown of Milford · Worcester County

Milford, Massachusetts Building Permit Guide

To get a building permit in Milford, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Milford’s Department of Inspections, listed at 66 Dilla Street, issues building, plumbing, gas and electrical permits and enforces the zoning by-law, with applications filed through the town’s CitySquared online permitting system.

Authority: Milford Department of InspectionsFiling: CitySquared online permittingPhone: 508-634-2313
Authority
Department of Inspections66 Dilla Street, Milford
Apply Online
CitySquaredTown’s online permitting system
House permit
$9 per $1,000$75 minimum since July 1, 2025
Review time
About 2 weeksLonger when files are incomplete

In Milford, the Department of Inspections issues building, plumbing, gas and electrical permits and also acts as the zoning office, with applications going through the town’s CitySquared online permitting system. Under the fee schedule the Select Board approved on June 9, 2025, residential building permits cost $9 per $1,000 of construction cost ($75 minimum) and commercial permits $10 per $1,000 ($100 minimum).

What requires a building permit in Milford?

Milford’s fee schedule shows the residential work the department permits: new houses, renovations, additions, decks, roofing, siding and windows, solar and energy storage, demolition, swimming pools, wood and pellet stoves and home occupations. Commercial work adds signs, and every job with wiring, plumbing or gas needs its own trade permit.

Permit needed

  • New homes, additions, renovations and decks, including replacement decks, stairs and porches
  • Roofing, siding and window replacement
  • Sheds over 200 square feet
  • Pools over 250 square feet or deeper than 24 inches, and inflatable pools, which also need a fence
  • Solar and energy storage systems, stoves, signs and demolition
  • Plumbing, gas and electrical work

No building permit

  • Fences 6 feet tall or less
  • Stone or retaining walls under 4 feet tall
  • Driveways
  • Sheds of 200 square feet or less, such as a 10 by 12 foot shed

Zoning still applies to work that needs no permit. Fences may go right up to the lot line with either side facing in, but a fence that blocks the view is limited to 3 feet 6 inches within 20 feet of the street and 6 feet elsewhere. Sheds over 120 square feet must meet full side and rear setbacks: 10 and 15 feet in the RA district, 15 and 25 feet in RB and 20 and 30 feet in RC; sheds and pools of 120 square feet or less use half those distances, and a pool on a corner lot must be 30 feet from both streets.

What Milford decides and what the state holds

All construction follows 780 CMR, the State Building Code issued by the Board of Building Regulations and Standards. Milford sets its own permit fees by Select Board vote, its Zoning By-Law (amended through October 20, 2025) and its general by-laws, such as the rule that anyone digging in a street needs a written permit from the Highway Surveyor. The town’s by-law compilation and building pages record no Stretch or Specialized energy code vote; the residential application asks for energy code compliance as part of the plans.

Milford building department: who handles permitting

The Department of Inspections is led by John Erickson, who serves as both Building Commissioner and Zoning Officer, with local building inspectors and separate plumbing and electrical inspectors. It issues building, plumbing, gas and electrical permits, enforces the zoning by-laws and applies the state Architectural Access Board rules.

Short on time to read all of this?

Get a free quote →
Milford Department of Inspections contacts
DetailInformation
Office66 Dilla Street, Milford, MA 01757 (fee sheets and forms still print the Town Hall address, 52 Main Street)
Phone508-634-2313; plumbing 508-634-2314; electrical 508-634-2323; fax 508-473-2358
HoursMonday, Tuesday and Thursday 8:00 am–4:30 pm; Wednesday 8:00 am–6:00 pm; Friday 8:00–11:30 am
ApplyCitySquared online permitting system
Planning & Engineering508-634-2317, the number the town gives for checking any fee request

The town has warned of fake emails and texts that pose as Planning and Engineering staff and demand permit or zoning fees. Milford never asks for payment by wire, cryptocurrency or payment app, or by email alone; call 508-634-2317 to check a request.

Milford permit types

Besides the residential and commercial building permit applications, the department posts applications for a certificate of occupancy, a certificate of zoning compliance, a periodic safety certificate of inspection, a home occupation and sheet metal work, plus contractor affidavits for completed HVAC, roofing, siding and window, solar and weatherization jobs and initial and final construction control documents.

Residential permits

Homeowners may apply for work on property they own and occupy; all other permits are pulled by licensed contractors. An owner who files under the homeowner exemption signs the town’s eligibility affidavit (revised August 26, 2025), which repeats the state code’s definition: a person who builds more than one home in two years is not a homeowner, and an owner who hires help must supervise the work. A certified plot plan from a registered land surveyor or civil engineer is required for new construction, any vertical or horizontal addition and any new or replacement deck, stairs or porch, even when the replacement is smaller. Plans larger than 8.5 by 14 inches must be submitted electronically. Accessory dwelling units are allowed with Planning Board site plan review under section 3.19 of the Zoning By-Law, up to half the main house’s floor area or 900 square feet, whichever is smaller, with one extra parking space unless the lot is within half a mile of a transit station; short-term rental of an ADU is prohibited.

Commercial permits

Commercial building permits are $10 per $1,000 with a $100 minimum, and commercial wiring, plumbing and gas permits are each 2% of the job cost with a $100 minimum; the trade sheets treat multi-family buildings as commercial. Buildings that need periodic safety inspections apply for a certificate of inspection on the town form. Signs follow section 3.9 of the Zoning By-Law, summarized in a sign by-law handout on the Regulations page, and a business run from a home needs a $75 home occupation permit under the town’s home occupation regulations. Dividing land into lots that already have the required street frontage uses an Approval Not Required plan, at $200 plus $200 for each new lot.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning and site plan review. New buildings or additions for uses listed as needing site plan review in section 2.3 must include a site plan by a registered land surveyor, engineer or architect for Planning Board review; approved site plans expire after three years. Under the Planning Board fee schedule effective January 20, 2026, site plan review costs $300 for up to one acre plus $100 for each added acre, a waiver of site plan review $200, an amendment $250 and a Planning Board special permit $500 plus the legal notice. Special permits and variances go to the Zoning Board of Appeals by petition, with a Planning Board recommendation.
  • Sewer or septic. The building page asks for a sewer permit from the Sewer Commissioners or a septic system plan approved by the Town Engineer and Conservation Commission; septic design follows Title 5. The Board of Sewer Commissioners’ connection permit application lists the owner, building contractor, licensed drainlayer, building size, bedrooms and every plumbing fixture, and the owner must give the Sewer Department director at least 24 hours’ notice to inspect the connection before any of it is covered.
  • Conservation Commission. Any land disturbance in a resource area under the Wetlands Protection Act or Rivers Protection Act needs a Notice of Intent or Request for Determination of Applicability; the legal ad fee is $100 for resident RDAs and $200 otherwise, and a certificate of compliance is $50.
  • Streets. Digging in a street, sidewalk or public way needs a written permit from the Highway Surveyor, with a fee of $10 to $200.

Rental housing has one more local step: under Article 37 of the Board of Health rules, no unit may be rented until the owner registers it with the Board of Health, which sets how many people it may house and issues a certificate to post in the unit; owner-occupied units are exempt. The Historical Commission runs the town museum and records; no historic district review or demolition-delay by-law appears in the town’s by-law compilation.

Milford permit costs and fees

The Select Board approved separate building, wiring, plumbing and gas fee sheets on June 9, 2025, effective July 1, 2025. Building fees are charged on construction cost, and a certificate of occupancy is included in the permit fee.

Rather talk it over?

Call 1-855-478-4290 →
Milford permit fees (Select Board, effective July 1, 2025)
ItemFee
Residential building work (new, addition, deck, roof, solar, pool, demolition, other)$9 per $1,000 of construction cost; $75 minimum
Commercial building work$10 per $1,000; $100 minimum
Sign$50 up to 10 sq ft, plus $2 per sq ft over
Wood or pellet stove / home occupation$75 each
Wiring, new one- or two-family house$250
Wiring, service upgrade$100 first meter + $50 each added meter
Wiring, renovation$75 (one inspection) or $150 (two inspections)
Wiring, photovoltaic$200
Plumbing, new house$250 per dwelling unit
Plumbing, renovation or replacement$75 first fixture + $25 each, $250 maximum per unit
Gas, residential$100 first fixture + $25 each, per unit
Commercial wiring, plumbing or gas2% of job cost; $100 minimum
Reinspection$50
After-hours inspection$75 per hour, booked and paid in advance

For example, a $48,000 addition to a house costs $432 for the building permit (48 × $9). A bathroom remodel with three plumbing fixtures costs $125 for the plumbing permit ($75 plus two at $25). For the plumbing fee, a sewer connection, backflow preventer, boiler connection or piping repair each count as a fixture; for gas, a propane tank and its trench each count as one.

Trade permits and who may pull them

Only licensed plumbers may apply for plumbing or gas permits in Milford, and wiring permits go to licensed electricians for hire, with an exception for communications wiring that is exempt from licensing. The homeowner route applies only to the building permit.

  • Electrical: 508-634-2323; underground, rough and final inspections.
  • Plumbing and gas: 508-634-2314; underground, rough and final inspections, with permits counted per dwelling unit.
  • Sheet metal: a separate sheet metal application for duct work by licensed sheet metal workers.

Rather not deal with the building department?

Get a free quote →

How to apply for a Milford building permit

1. Check the zoning district

The department asks applicants to read their district’s rules first; use the town GIS and Zoning By-Law.

2. Clear sewer, septic and wetlands

Sewer Commissioners’ permit or an approved septic plan, and Conservation Commission filings where needed.

3. Prepare plans

Two sets of plans or electronic files, a certified plot plan where required and a site plan with all distances to lot lines.

4. Insurance and licenses

Certificate of insurance naming the Town of Milford, workers’ compensation affidavit, and the contractor’s Construction Supervisor License or the homeowner affidavit.

5. Apply in CitySquared

Describe the work in full and enter the construction cost for the fee.

6. Inspections and closeout

Book every required inspection, then apply for the certificate of zoning compliance and, if needed, the certificate of occupancy.

Review, corrections and what causes delay

The town’s application says review averages about two weeks because of heavy volume and slows when files are incomplete. The state rule in 780 CMR 105.3.1 gives the building official 30 days from filing to act. The application treats a file as complete, and ready for review, only when the construction documents, specifications, fee and any other required items, such as the certified plot plan and the insurance certificate naming the town, are all included.

Inspections in Milford

Once a permit is issued, the permit holder is responsible for scheduling every required inspection. Building inspections cover the foundation where there is one, rough framing, insulation and a final; plumbing, gas and electrical work each need underground, rough and final inspections. A reinspection costs $50, and inspections after hours cost $75 an hour, scheduled and paid in advance.

At the end of the job, the owner applies for a certificate of zoning compliance and, where the work calls for one, a certificate of occupancy before occupying or continuing to occupy the building. The certificate of occupancy carries no separate charge.

Massachusetts building code

Milford enforces the 10th edition of 780 CMR. FEMA’s Community Status Book lists the Town of Milford (community 250317) as participating in the National Flood Insurance Program, with flood maps dated July 8, 2025; the Planning & Engineering page links the FEMA flood mapping tools.

Want this handled start to finish?

Get a free quote →

Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules

Milford permit search and official resources

Applicants follow their own permits in CitySquared. Other permit files are public records; requests go to the town’s Records Access Officer under the state public records law. Printed zoning maps cost $5 from the Planning and Engineering Office, and parcel data is on the town’s online GIS.

Inspections are where schedules slip.

Get a free quote →

Milford building permit FAQs

How much is a building permit in Milford?

$9 per $1,000 of construction cost with a $75 minimum for residential work, and $10 per $1,000 with a $100 minimum for commercial work, since July 1, 2025.

Do I need a permit for a fence in Milford?

Not for a fence 6 feet tall or less, but view-blocking fences are capped at 3 feet 6 inches within 20 feet of the street.

Do I need a permit for a shed or a pool?

Sheds need one only over 200 square feet. Pools need one over 250 square feet or 24 inches deep, and inflatable pools need a permit and a fence.

Can a homeowner pull a permit in Milford?

Yes, for building work on a home they own and occupy. Plumbing, gas and electrical permits go only to licensed trades.

Where is the Milford building department?

The department’s page lists 66 Dilla Street and 508-634-2313; its fee sheets still show Town Hall, 52 Main Street.

How long does a permit take in Milford?

Review averages about two weeks, longer if the application is incomplete.

Is a plot plan required?

Yes, a certified plot plan for new construction, additions and any new or replacement deck, stairs or porch.

What does a new house cost in trade permits?

$250 for wiring and $250 per dwelling unit for plumbing, plus gas at $100 for the first fixture and $25 for each one after.

Simplify Milford permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Milford sooner?

Let Alliance prepare, file, and track your Milford permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Milford permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.