Kingston’s Building, Inspections and Zoning office at the Town House, 26 Evergreen Street, issues building, zoning, wiring, plumbing and gas permits. Under the fees in effect since January 1, 2024, a building permit costs $14 per $1,000 of calculated construction cost, and new homes, renovations and additions are filed in person or by mail rather than through the SmartGov portal. From October 15, 2026 the office is open Monday to Thursday, 8 am to 2 pm.
What requires a building permit in Kingston?
Kingston is a coastal Plymouth County town of about 14,500 people, with its own harborfront and shellfish regulations. Its building office works under the state’s inspector-of-buildings law (Chapter 143, Section 3) and also enforces zoning, so a building application is paired with a zoning application. The 2024 fee sheet shows the range of work it permits:
Permit required
- New homes, additions, renovations, repairs and alterations
- Garages, porches and decks, and sheds or barns over 200 square feet
- Chimneys, stoves and fireplaces
- Demolition and moving a building
- In-ground and above-ground pools
- Re-roofing, manufactured siding and residential or commercial solar
- Sheet metal work, temporary trailers and signs
- Electrical, plumbing and gas work
No fee or permit
- Political and yard sale signs carry no fee
- Work the State Building Code exempts; the office can confirm before you start
What Kingston decides and what the state holds
Construction standards are the state’s 780 CMR, issued by the Board of Building Regulations and Standards and enforced in Kingston without local amendment. Kingston’s own decisions are its fee schedule, its Zoning Bylaw, and General Bylaws that adopt the Stretch Energy Code (Chapter 127, Article II, adopted at the 2010 Annual Town Meeting under Article 20 and updated in May 2024), delay demolition of older buildings, regulate land clearing and grading, and protect wetlands beyond the state Act. The Board of Health adds local septic rules on top of Title 5.
Kingston building department: who handles permitting
The Building, Inspections and Zoning office issues every building, zoning, electrical, plumbing and gas permit in Kingston. Jeffrey Richards is the Building Commissioner and also serves as the Town’s ADA Coordinator and its local contact for the state’s new consolidated clean energy permits. Two plumbing and gas inspectors and a wiring inspector, each with alternates, handle trade inspections.
| Detail | Information |
|---|---|
| Office | Kingston Town House, 26 Evergreen Street, Kingston, MA 02364 |
| Phone | 781-585-0505 (fax 781-585-0544) |
| Hours (from October 15, 2026) | Monday to Thursday 8 am–2 pm; Building Commissioner Monday 8–10 am; closed Friday |
| Online portal | SmartGov, twn-kingston-ma.smartgovcommunity.com |
| Building Commissioner | Jeffrey Richards |
Short on time to read all of this?
Get a free quote →Large clean energy projects now have a separate route. A consolidated permit under the state’s 225 CMR 29.00 rules, in effect from October 1, 2026, starts with a required pre-application meeting with the Building Commissioner, and the Town has said its application fee will be announced.
Kingston permit types and the approvals that come first
Kingston’s SmartGov portal takes building, electrical, plumbing, gas and mechanical applications and shows applicants their records and inspection results, but the Town notes that not every permit can be filed there: single-family homes, renovations, additions and similar permits must be submitted in person or by mail. The portal also has a parcel search.
Residential permits
A complete residential file carries the building permit application and the zoning application, building plans with before-and-after floor plans, a plot plan locating the work, design information for the 110 mph wind speed zone, energy documentation (REScheck and Stretch Code information), the workers’ compensation affidavit and the contractor’s license and insurance. A new house also needs a septic or sewer application and a Water Department receipt. For additions, the Town’s instructions add that Stretch Code compliance can be shown by a HERS rating or the prescriptive route, and that the department routes each application to the Fire Department, the Board of Health or Sewer Department and the Conservation Commission as required.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial work uses the same $14 per $1,000 rate, with new construction valued at $85 per square foot for commercial space and $75 for industrial, and alterations at $85 for both. Commercial solar and sheet metal are $14 per $1,000. Chapter 237 bans floor drains that discharge to the ground in commercial or industrial process areas and hazardous material storage areas within the Zone II of Trackle Pond, unless the state Department of Environmental Protection authorizes them. A commercial zoning use permit is $150, and site plan approval by the Zoning Enforcement Officer for a lot of up to 10 parking spaces is $200.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning: every building permit comes with a zoning application; a residential zoning use permit is $75.
- Land clearing and grading: under Chapter 197, adopted in 2023, clearing or grading more than 15,000 square feet of a developed lot, or within 15 feet of a property line, or on slopes over 25%, needs a site alteration permit through staff review (decided within 21 days of a complete application), and clearing an undeveloped lot needs a Planning Board special permit, unless an exemption in the bylaw applies.
- Conservation Commission: Kingston’s Wetlands Protection Bylaw is written to be stricter than the state Act and covers, among other things, a new-construction septic system within 100 feet of a protected area.
- Board of Health: new septic systems need at least 800 square feet of leaching area, except in the Water Overlay District, where Title 5 governs. In the Board’s sewer-connection regulations, a major renovation without a septic upgrade is allowed only if the old system is formally abandoned, the sanitary pipes are capped by a licensed plumber under a plumbing permit, the water is shut off at the street, and the house stays empty until the Sewer Department certifies the sewer connection. Inside the funded sewer project phases, a failed system under a Title 5 inspection bars any increase in living space until the house is on the sewer or the system is upgraded.
- Historical Commission: demolition of older buildings, described in the code section below.
- Sewer Commission: where sewer reaches a street, owners must connect within six months under Chapter 263, and the sewer connection fee, or its first installment, is paid before the connection permit issues; the Board of Sewer Commissioners can spread the fee over as many as 30 yearly payments.
Kingston building permit fees
All of Kingston’s building and trade fees are on one sheet, effective January 1, 2024. The building fee is $14 for each $1,000 of calculated construction cost, and for new construction the department calculates that cost from set square-foot values rather than the contract price.
| Item | Fee or basis |
|---|---|
| Building permit | $14 per $1,000 of calculated construction cost |
| New residential construction | Valued at $150 per square foot |
| Garage, porch or deck, shed or barn over 200 sq ft | Valued at $75 per square foot |
| Residential alterations | Valued at the contract amount |
| Minimum fee | $75 repairs; $100 alterations |
| Chimney, stove or fireplace | $75 |
| Demolition / moving a building | $100 / $100 |
| Pool, in ground or above ground | $150 |
| Re-roofing / manufactured siding | $75 / $100 |
| Residential solar panels | $150 |
| Temporary trailer | $100 |
| Signs / political or yard sale sign | $10 per square foot / no fee |
| Commercial roofing | $150 per $1,000, as the sheet prints it |
| Re-inspection | $50 |
| Work done before the permit is issued | Double fee |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a new 2,000-square-foot house is valued at 2,000 × $150 = $300,000, so the building permit is 300 × $14 = $4,200, with zoning, wiring, plumbing and gas permits on top. A 400-square-foot deck is valued at $30,000 and costs $420.
Wiring, plumbing and gas permits in Kingston
Electricians, plumbers and gas fitters file their own permits, on paper or through SmartGov, and the trade fees share the January 1, 2024 sheet. Commercial wiring is priced on the total construction contract: $250 for the first $20,000 and $30 for each further $20,000.
| Permit | Fee |
|---|---|
| Wiring, new dwelling or complete remodel | $250 |
| Wiring, additions and remodeling | $125 |
| Any wiring job needing 2 inspections | $125 |
| Service change / underground service with trench | $75 / $100 |
| Temporary service or wiring re-inspection | $75 |
| Pools / alarms | $75 / $100 |
| Wiring minimum, residential or commercial | $75 |
| Commercial wiring: services / alarms | $75 per 100 amps / $150 |
| Plumbing or gas, residential (new or replacement) | $100 first fixture; $15 each additional |
| Plumbing or gas, commercial | $150 first fixture; $15 each additional |
The sheet also sets conduct rules: inspectors will not enter an occupied home unless the homeowner or another adult is there, and plumbers must arrange access with the homeowner before calling for an inspection.
Rather not deal with the building department?
Get a free quote →How to apply for a Kingston building permit
Use the SmartGov parcel search and confirm zoning, septic or sewer, and any wetland or clearing limits.
A new house needs a septic or sewer application and a Water Department receipt.
Building and zoning applications, plans, plot plan, wind and energy documents, insurance and affidavit.
In person or by mail for homes, renovations and additions; other types may use SmartGov.
Fire, Board of Health, Sewer and Conservation may each review the file.
Pay the fee before work begins; starting early doubles it.
Review, corrections and what causes delay
Because the department sends applications on to the Fire Department, the Board of Health or Sewer Department and the Conservation Commission as needed, a Kingston permit is ready only when every office it touches has signed off. The State Building Code gives the building official 30 days from the filing of an application to act (780 CMR 105.3.1). A file missing its zoning application, wind design sheet or Stretch Code document cannot move forward, and with the counter now open only until 2 pm and the Building Commissioner in the office on Monday mornings, plan visits and mailings around those hours.
Inspections in Kingston
All inspections are called in to the Building Department at 781-585-0505, with the permit information ready. Electrical inspections are scheduled the same way. Plumbing and gas inspections are done Monday to Friday between 3 and 5 pm, and the homeowner or another adult must be home for any inspection in an occupied dwelling. A failed building inspection costs $50 to repeat and a wiring re-inspection $75; work begun before the permit was issued is charged double. Applicants can follow inspection results in the SmartGov portal.
Building code and local bylaws in Kingston
Kingston enforces 780 CMR, 10th edition, with the Stretch Energy Code under Chapter 127, Article II of its General Bylaws, which states that the Town mandates the higher energy standard for both residential and commercial buildings. FEMA lists Kingston as a participating community in the National Flood Insurance Program, with flood maps effective July 6, 2021.
Chapter 185 applies to buildings 80 years old or older (or of unknown age), buildings on or eligible for the National or State Register or the Town’s historical survey, and buildings within 200 feet of a historic district. The Building Inspector forwards a demolition application to the Historical Commission within 7 days, and the Commission has 45 days to decide whether the building is significant. If it is, the applicant files a demolition plan within 60 days and the Commission holds a hearing with notice to owners within 500 feet. A building it decides should preferably be preserved cannot get a demolition permit for 6 months, and demolition permits issued after this review are good for 6 months. Every demolition application carries a fee set by the Select Board, and when a demolition will leave a vacant lot, plans for removing or filling the foundation, septic components, wells and dry wells, and for regrading, must be filed first. Demolishing a regulated building without complying risks a fine of up to $300 a day for as long as 60 days.
Want this handled start to finish?
Get a free quote →Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules
Kingston permit search and official resources
Applicants see their own applications and inspection results in SmartGov’s My Portal, and the parcel search shows property information. Conservation Commission permits must be recorded at the Registry of Deeds before the work they cover begins, so a recorded order is also part of the property record. For past permits on a property or other building files, use the Town’s online public records request system or ask at the counter.
- Kingston Building, Inspections and Zoning
- Kingston permitting online portal
- Kingston SmartGov public portal
- All permit fees (from January 1, 2024)
- Building permit application
- Commercial permit application
- Zoning permit application
- Residential additions application instructions
- Kingston General Bylaws and regulations (eCode360)
- Kingston public records requests
- FEMA Community Status Book, Massachusetts
- Massachusetts State Building Code (780 CMR)
Inspections are where schedules slip.
Get a free quote →Kingston building permit FAQ
Who issues building permits in Kingston, MA?
The Building, Inspections and Zoning office at the Town House, 26 Evergreen Street (781-585-0505). Jeffrey Richards is the Building Commissioner.
How much is a building permit in Kingston?
$14 per $1,000 of calculated construction cost. New homes are valued at $150 per square foot, so a 2,000-square-foot house is $4,200.
Can I apply online for a new house or addition?
No. The Town says single-family, renovation, addition and similar permits must be submitted in person or by mail. Other permit types can use SmartGov.
Which energy code applies in Kingston?
The Stretch Energy Code, adopted in 2010 and kept in Chapter 127 of the General Bylaws. Additions show compliance with a HERS rating or the prescriptive route.
Do I need a permit for a shed?
The fee sheet values sheds and barns over 200 square feet at $75 per square foot for the $14 per $1,000 fee. Ask the office about smaller sheds and zoning setbacks.
Can I clear trees before building?
Clearing over 15,000 square feet of a developed lot, within 15 feet of a lot line, or on slopes over 25% needs a site alteration permit under Chapter 197, unless an exemption applies.
When are plumbing and gas inspections done?
Monday to Friday, 3 to 5 pm, booked through the Building Department at 781-585-0505.
How long can a demolition be delayed?
Up to 6 months, if the Historical Commission finds a building 80 years or older should preferably be preserved.
Simplify Kingston permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Kingston sooner?
Let Alliance prepare, file, and track your Kingston permits while your crew stays on the job.
More Massachusetts permitting guides
Abington
Read guide →Bridgewater
Read guide →Brockton
Read guide →Lakeville Building Permit Guide
Read guide →Lawrence Building Permit Guide
Read guide →Leicester Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Kingston permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.