Danvers, Massachusetts Building Permit Guide

To get a building permit in Danvers, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Danvers Inspectional Services, at Town Hall on 1 Sylvan Street, issues building, wiring, plumbing and gas permits through the town’s OpenGov portal, under a fee schedule that took effect on March 27, 2025.

Authority: Danvers Inspectional ServicesCode: 780 CMR, 10th edition; base energy codePhone: 978-777-0001 ext. 3061
Authority
Inspectional Services1 Sylvan Street
House fee
$10 per $1,000$50 minimum; $14 per $1,000 for other buildings
Records
OpenGov since May 30, 2023Search by address
Energy code
Base codeStretch vote expected January 2027

Danvers Inspectional Services, in Town Hall at 1 Sylvan Street, reviews plans, issues building, electrical, plumbing and gas permits and makes the inspections for the whole town. A permit on a one- or two-family house costs $10 per $1,000 of estimated construction cost, with a $50 minimum, under the schedule effective March 27, 2025.

Danvers is still on the state’s base energy code; the town’s own climate page notes that every bordering community has adopted the Stretch code and says a Special Town Meeting is expected in January 2027 to consider it.

What needs a building permit in Danvers?

The office permits the construction, reconstruction, alteration, repair and demolition of buildings, the installation of regulated equipment, and changes in the use and occupancy of buildings and land. Its checklists add the local thresholds homeowners ask about most:

Permit required

  • New houses, additions and remodels, including condominium units after their first certificate of occupancy
  • Accessory buildings that are taller than 10 feet, larger than 200 square feet or more than one story
  • Fences taller than 7 feet
  • Pools, spas and hot tubs, and their demolition
  • Demolition of a house, garage or commercial building
  • All electrical, plumbing and gas work, under separate permits

No building permit

  • Single-story detached sheds and similar structures under 10 feet tall and 200 square feet or less; they still go through a town application that confirms the zoning setbacks
  • Fences under 7 feet, though a fence in the historic district may need approval

What Danvers sets and what the state sets

Danvers enforces the Massachusetts State Building Code, 780 CMR, and the Architectural Access Board rules exactly as the state writes them. Its own layer is the Zoning Bylaw, the general bylaws (revised through May 18, 2026), the fee schedules, and local rules that run alongside the code: a Wetlands Protection Bylaw that is stricter than the state Wetlands Protection Act, a demolition delay bylaw, the Salem Village Historic District, and a bylaw against demolition by neglect of buildings on the National Register.

Danvers building department: who handles permitting

Inspectional Services issues all four kinds of construction permit. The Building Commissioner, Tim Hudon, heads the office, which also employs a building inspector, an electrical inspector and a plumbing and gas inspector; each has an extension on the Town Hall line. Historic district questions go to the Land Use & Community Services Department.

Short on time to read all of this?

Get a free quote →
Danvers Inspectional Services contact
DetailInformation
OfficeInspectional Services, Town Hall, 1 Sylvan Street, Danvers, MA 01923
Phone978-777-0001, ext. 3061 or 3062 (Building Commissioner ext. 3064; electrical inspector ext. 3063; plumbing and gas inspector ext. 3067)
Office hoursMonday to Wednesday 8 a.m. to 4 p.m.; Thursday 8 a.m. to 7 p.m.; Friday 8 a.m. to noon
Inspectors at the counterMonday to Wednesday 8–9 a.m. and 1–2 p.m.; Thursday also 5–6 p.m.; Friday 8–9 a.m.
PortalDanvers OpenGov (ViewPoint Cloud) permit portal
Historic district questionsLand Use & Community Services, 978-777-0001 ext. 3095

Permit types in Danvers

Residential permits

The residential rate covers one- and two-family homes, accessory structures and individual condominium units once the first certificate of occupancy has been issued. Owners who pull their own building permit take on the inspection duties too: the town’s inspection sheet says the owner or authorized agent must be present for every inspection, while on a contractor’s job the Construction Supervisor License holder named on the permit must attend. Pools, spas and hot tubs have their own requirements sheet and a sample pool specification; shed setbacks are on a separate sheet.

Commercial permits

Commercial buildings, multifamily buildings and condominium projects pay the higher $14-per-$1,000 rate with a $75 minimum, and their re-inspections cost $75. After occupancy, the Building Division keeps certifying them: assembly spaces, schools, places of worship, restaurants, day care centers, hotels and public pools need a periodic certificate of inspection, and buildings with three or more units are inspected annually or every two or five years for fire escapes, egress, stairs, smoke and CO alarms, emergency lights and exit signs. Work on a state-owned building uses the separate state application.

What comes before the building permit

  • Zoning: Inspectional Services enforces the Zoning Bylaw, residential dimensional setbacks are posted with the building forms, and relief goes to the Zoning Board of Appeals; the 2023 shed sheet sends setback applications to the Planning & Economic Development Department.
  • Wetlands: the Conservation Commission applies both the state Wetlands Protection Act and the town’s stricter Wetlands Protection Bylaw to work in or near resource areas.
  • Board of Health: a Title 5 septic review where a property is not on sewer.
  • Historic review: the Salem Village Historic District needs approval for exterior work, and demolishing any building built in 1925 or earlier triggers Danvers Preservation Commission review. A building found worth preserving can be held for 12 months, or 18 months if it is more than 200 years old or on the State or National Register. A sale during the delay restarts it, and a building not demolished within 18 months after the delay ends needs a new application.
  • Dumpsters: a dumpster permit is applied for separately in OpenGov.

Not sure this scope needs a permit?

Get a free quote →

Danvers building permit fees

The building fee is a rate per $1,000 of estimated construction cost, and the schedule tells applicants to round the cost up to the next whole $1,000 before multiplying.

Danvers building permit fees (effective March 27, 2025)
ItemFee
One- and two-family homes, accessory structures, individual condo units after the first CO: new, additions, remodels$10 per $1,000; minimum $50
All other buildings, including commercial, multifamily and condominium projects$14 per $1,000; minimum $75
Demolition, one- and two-family$25 for the first 1,000 sq ft, plus $10 per additional 1,000 sq ft
Demolition, all other buildings$100 for the first 1,000 sq ft, plus $25 per additional 1,000 sq ft
Certificate of occupancy$20 with a building permit; $25 without
Re-inspection$50 residential; $75 commercial
Reprinting a lost permit card$25 residential; $50 commercial

Worked example. A family-room addition estimated at $48,200 is rounded up to $49,000, so the building permit costs 49 × $10 = $490, plus $20 for the certificate of occupancy if the job needs one.

Trade permits and who may pull them

Danvers keeps the trades firmly with licensed professionals. The electrical page says all electrical work must be done by a licensed electrician and that inspections are made only with the licensed electrician present; the plumbing page says the same for plumbers and gas fitters under the state plumbing and fuel gas code, 248 CMR. Builders supervising structural work hold a state Construction Supervisor License, and on existing owner-occupied homes the contractor also registers as a Home Improvement Contractor.

Rather talk it over?

Call 1-855-478-4290 →
Danvers trade permit fees
PermitFee
Electrical with a building permit, one- and two-family (March 27, 2025)$2 per $1,000 of total building cost; $50 minimum
Electrical, all other buildings$3 per $1,000; $75 minimum
New electrical service or service change$75 residential; $100 commercial up to 400 A, plus $20 per extra 100 A
Low-voltage wiring (fire alarm, security, data)$2 per $1,000 residential ($50 minimum); $3 per $1,000 commercial ($75 minimum)
Pool wiring$50 above ground; $100 in ground
Plumbing or gas, new one- or two-family home (August 2, 2018)$200 plus $5 per fixture
Plumbing or gas, residential remodel or fixture replacement$25 plus $5 per fixture
Plumbing or gas, new building of 3 or more units$200 per unit plus $5 per fixture
Plumbing or gas, new commercial building$500 plus $10 per fixture
Water heater replacement$15 plumbing or $15 gas (residential); $25 (commercial)

Plumbing and gas fees are doubled when work starts before the permit is issued.

How to apply for a Danvers building permit

1. Confirm zoning first

Check setbacks and use against the Zoning Bylaw, ask the Conservation Commission if wetlands are near, and the Preservation Commission if an old building will come down.

2. Get a certified plot plan

The town does not prepare plot plans, and a mortgage survey or plot of land is not accepted in place of a certified plan.

3. Open an OpenGov account

Apply in the Danvers portal and pick the right record type: building, electrical, plumbing and gas are separate applications.

4. Upload plans and credentials

Construction drawings, license and registration numbers, and the workers’ compensation affidavit; the Affidavit for Final Cost of Construction follows at the end of the job.

5. Pay the assessed fee

Round the estimated cost up to the next $1,000 and apply the residential or commercial rate.

6. Schedule every inspection

The permit holder books all of them, through the final that closes the permit.

Rather not deal with the building department?

Get a free quote →

Review, corrections and what causes delay

State law gives the building official 30 days from the application to issue or refuse a permit (780 CMR 105.3.1). In Danvers, files most often wait on things outside the building office: a Conservation Commission hearing under the stricter town bylaw, a Preservation Commission hearing on a pre-1926 building, or a plot plan that is not a certified survey. A contractor change also slows a job: when the town reviewed every active permit held by NEWPRO Home Improvement Solutions in December 2025, owners had to take over the permit themselves or name a new licensed contractor before inspections could continue.

Inspections in Danvers

The required building inspections, effective May 19, 2023, are: excavation (the hole at least 4 feet deep from average grade); footing and foundation before concrete; backfill, to see waterproofing, drainage and any radon system; rough frame, once the structure is roofed, sided and has its doors and windows and the electrical and plumbing roughs are signed on the yellow permit card; insulation before drywall; above-ceiling before ceilings close; and the final after the electrical, plumbing and fire finals. Work covered before its inspection may have to be taken apart. The permit holder must call for each visit, and the right person must be there: the owner on a homeowner permit, otherwise the licensed supervisor. Electrical and plumbing inspections are made only with the licensed tradesperson present. Open permits are treated as violations, so a job is not finished until its final closes it.

Energy code and state code in Danvers

Danvers has not adopted the Stretch or Specialized energy code, so projects follow the base code in 780 CMR. The town held a Stretch code workshop for Town Meeting members on September 17, 2026, and its Resilient Danvers page says a Special Town Meeting is anticipated in January 2027 to consider the Stretch code, with July 1, 2027 named as a possible effective date if it passes.

Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules

Danvers permit search and official resources

Permits issued since May 30, 2023 can be searched in OpenGov by address only; an active status means applied for or still open, and a closed permit reads Complete. Permits from July 2009 to May 30, 2023 are in the digitized property folders, available by request to the Inspectional Services office (ext. 3061), which can take up to 24 hours; permits issued before 2009 can no longer be viewed at Town Hall. Old building plans in the basement archive cannot be copied by staff, but an owner can leave a $100 cash deposit and a copy of a driver’s license to borrow them for copying.

Want this handled start to finish?

Get a free quote →

Danvers building permit FAQ

Inspections are where schedules slip.

Get a free quote →

How much does a building permit cost in Danvers?

$10 per $1,000 of estimated construction cost for one- and two-family homes (minimum $50) and $14 per $1,000 for other buildings (minimum $75), with the cost rounded up to the next $1,000. A $48,200 addition pays $490.

Do I need a permit for a shed in Danvers?

Not if it is a single-story detached structure under 10 feet tall and 200 square feet or less, but it must meet the zoning setbacks and goes through the town’s setback application. Anything bigger needs a building permit.

Do I need a permit for a fence in Danvers?

Only for a fence over 7 feet. In the historic district a lower fence may still need approval from Land Use & Community Services.

Can a homeowner do electrical or plumbing work in Danvers?

No. The town requires a licensed electrician for all electrical work and a licensed plumber or gas fitter for plumbing and gas, and inspections are made only with them present.

Which energy code does Danvers use?

The state base code. A Special Town Meeting is expected in January 2027 to consider the Stretch code; if adopted, the effective date would be set separately, possibly July 1, 2027.

Does Danvers have a demolition delay?

Yes. Buildings built in 1925 or earlier go to the Preservation Commission, which can delay demolition for 12 months, or 18 months for buildings over 200 years old or on the State or National Register.

What if my contractor was NEWPRO Home Improvement Solutions?

In December 2025 the town put every active permit held by NEWPRO under review. Owners can take the permit over themselves or hire a new licensed contractor to assume it, and either way must email Inspectional Services so inspections can be completed and the permit closed.

Can the town give me a plot plan?

No. Danvers does not provide certified plot plans and does not accept a mortgage survey in place of one.

Simplify Danvers permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Danvers sooner?

Let Alliance prepare, file, and track your Danvers permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Danvers permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.