Skip to main content
Municipal GuideLouisianaNatchitoches · Natchitoches Parish

Natchitoches, Louisiana Building Permit Guide

The City of Natchitoches Planning & Zoning Department at 700 Second Street issues building permits inside the city, with applications filed online through the City’s Click2Gov building permit portal.

Authority: City of Natchitoches Planning & Zoning DepartmentFiling: Click2Gov online portalPhone: 318-357-3840
Building authority
City of Natchitoches Planning & Zoning Department
Office phone
318-357-3840
How to apply
Click2Gov online building permit application
New house
$150 plan review + $75 permit + $75 per inspection

Inside Natchitoches city limits, building permits come from the City’s Planning & Zoning Department at 700 Second Street (318-357-3840), and applications are filed online through the City’s Click2Gov portal. For new homes and additions, the City’s 2025 fee schedule lists a $150 plan review fee, a $75 permit fee and $75 for each inspection.

What needs a permit in Natchitoches?

The City’s building permit application covers new construction, additions, renovation, repair and remodeling, swimming pools, signs, moving buildings and demolition, and its fee schedule adds mobile homes and electrical, plumbing and mechanical work. The City’s development instructions also require:

Also needed

  • A grading permit before any grading or land disturbance
  • A landscape permit for new multi-family, industrial and commercial projects
  • A DOTD driveway permit for access from a state highway
  • A sign permit for new business signs
  • Historic District Commission review for work in the historic district

Other agencies

  • State health (sanitation) compliance for waste disposal
  • A Louisiana DEQ stormwater discharge permit for sites of 1 acre up to 5 acres
  • A DOTD traffic access permit for developments on or within 1/4 mile of a state highway

Who issues building permits in Natchitoches?

The City of Natchitoches issues permits inside the city through its Planning & Zoning Department, which handles land development, building code enforcement, certificates of occupancy and floodplain management, and staffs the Planning Commission and Historic District Commission. Shontrell Roque is the Planning & Zoning Director, and a City Building Inspector inspects the work. For commercial plans, the City has contracted with the State Fire Marshal’s office for plan review.

Land outside the city is handled by Natchitoches Parish Government’s Planning and Zoning Department (318-352-2714, ext. 2; planning@npgov.org), which says its planning, zoning and permitting work is carried out by the Rapides Area Planning Commission.

Short on time to read all of this?

Get a free quote →
Natchitoches permit contacts
OfficeDetails
Planning & Zoning700 Second Street (P.O. Box 37), Natchitoches, LA 71457
Phone / fax318-357-3840 / 318-357-3837
DirectorShontrell Roque
OnlineClick2Gov building permit application

Electrical, plumbing and mechanical permits in Natchitoches

Electrical, plumbing and mechanical permits are listed on the same City fee schedule at $75 each for work not already included in a new residential or commercial project, and extra electrical and plumbing inspections are $75 each. The Building Inspector decides how many inspections a job needs.

Electricians, plumbers and HVAC contractors who are not residents pay an extra $200 per job. The City counts a contractor as a resident if they live in the city or keep a bona fide place of business there. A swimming pool pays $0.10 per square foot plus a $75 electrical inspection fee.

Natchitoches permit fees

The City links its “Permit Fee Schedule 2025” from the Planning & Zoning and Permits pages (a Word file). It sets a general base fee and separate amounts for new homes and new commercial buildings:

Natchitoches permit fees (Permit Fee Schedule 2025)
ItemFee
New construction, alteration, repair or remodeling (general base fee)$7.50 per $1,000 of estimated cost (service, labor and materials); $50 for work under $1,000
Residential new construction or addition: plan review$150, non-refundable
Residential new construction or addition: permit fee$75
Residential new construction or addition: driveway/drainage$50
Residential new construction or addition: inspections$75 per inspection
Commercial new construction or addition$75 + $7.50 per $1,000 of estimated cost; plan review by the State Fire Marshal; $75 per inspection
Electrical, plumbing or mechanical permit$75 each
Non-resident electrical, plumbing or HVAC contractor$200 extra per job
Sign$45 per sign
Swimming pool$0.10 per sq ft + $75 electrical inspection
House moving (per section) / mobile home$50 / $50
Demolition$500 refundable deposit + $75 base fee + $25 to $125 by cost ($5 per $1,000 over $100,000)
Certificate of occupancy worksheet$50

Not sure this scope needs a permit?

Get a free quote →

Work begun before a permit is issued pays double. When an owner builds without a contract, the fee is based on average current building costs per square foot multiplied by 0.45%. The schedule does not say whether the $7.50 base fee is also charged on top of the flat residential amounts. Council minutes from June to October 2026 show no fee change.

Plans and documents

The City takes applications through Click2Gov. Its Development Review and Construction Permit Instructions set out what the plans must show:

Homes

  • One complete set of construction plans covering the architectural, structural, mechanical and electrical work, submitted at least 3 days before the permit is issued
  • Plans need not be drawn by an architect or engineer, but must follow the state uniform construction code
  • A site plan to scale, based on an accurate boundary survey, showing new and existing buildings, distances from lot lines, street grades and finished grades, and any flood hazard areas, floodways and design flood elevations

Commercial

  • A complete copy of the original plans stamped by the State Fire Marshal after its review
  • A landscape plan with a $25 review fee for new multi-family, industrial and commercial projects
  • A stormwater pollution prevention plan and DEQ notice where the project needs them
  • A DOTD traffic access permit for sites on or near a state highway

Rather talk it over?

Call 1-855-478-4290 →

The Building Official may waive or modify the site plan for alterations and repairs. The application form also reminds applicants that they must contact the State Fire Marshal’s Office to find out whether a plan review is required, and that the EPA lead-based paint renovation rule applies.

How to get a Natchitoches permit: 6 steps

1. Check zoning and the historic district

Confirm the lot is in the city, its zoning, and whether the Historic District Commission must review the work.

2. Commercial: get an administrative review

Meet Planning & Zoning before sending plans to the State Fire Marshal for review.

3. Line up other permits

Get any DOTD access, grading, landscape or DEQ stormwater permits the site needs.

4. Apply online

File through Click2Gov with the site plan, plans and, for commercial work, the Fire Marshal-stamped plans.

5. Pay and post the permit

Pay the fees and keep the permit and approved plans on the site.

6. Inspections and certificate of occupancy

Request inspections from Planning & Zoning, then submit the completion form (homes) or the Fire Marshal’s certificate (commercial).

Natchitoches inspections and occupancy

Notify the Planning & Zoning Office when work is ready for each inspection on the inspection record. No inspection is made unless the permit is displayed and the approved plans are on site, and the inspector may enter the site during reasonable hours. If the Building Inspector finds work that does not comply, it must be corrected and may not be covered until the inspector approves it. Changes from the approved plans need the inspector’s approval.

Rather not deal with the building department?

Get a free quote →

No building may be used or occupied until Planning & Zoning issues a certificate of occupancy. For a house, bring the City’s Certificate of Completion form signed by every contractor and subcontractor who worked on the job; for a commercial project, bring the certificate of occupancy from the State Fire Marshal’s Office.

Local Natchitoches details

Historic district: the City designated its historic district in 1977, and it was designated a National Landmark by the U.S. Department of the Interior in 1988. The Historic District Commission reviews proposals in the 33-block landmark district and its 14-block extension against the City’s design guidelines, meeting on the first Monday of each month at 5:00 p.m. at the Natchitoches Arts Center, 716 Second Street.

Planning Commission: zoning changes and variances go to the Planning Commission on the first Tuesday of each month at 5:00 p.m. at the same building, and items needing Council action go on to the City Council, which meets on the second and fourth Mondays.

Floodplain: sites in a FEMA special flood hazard area must meet the City’s Flood Damage Prevention Ordinance, and the site plan has to show flood hazard areas, floodways and design flood elevations.

Louisiana building code

Every Louisiana parish and municipality enforces the state’s Uniform Construction Code (R.S. 37:3737), adopted by the Louisiana Uniform Construction Code Commission: the 2021 International Codes with Louisiana amendments, in force since 1 January 2023, and the 2020 National Electrical Code, with the 2024 codes taking effect on 1 January 2027. A local government may set more stringent requirements only with the Commission’s approval, and the State Fire Marshal reviews plans for fire and life safety on all but one- and two-family dwellings. How the LSUCC works

Want this handled start to finish?

Get a free quote →

Official Natchitoches permit resources

Natchitoches permit FAQs

Inspections are where schedules slip.

Get a free quote →

Who issues building permits in Natchitoches?

The City of Natchitoches Planning & Zoning Department, 700 Second Street, 318-357-3840. Outside the city, Natchitoches Parish Government handles permits, with the work done by the Rapides Area Planning Commission.

How much does a permit for a new house cost?

The 2025 schedule lists a $150 non-refundable plan review fee, a $75 permit fee, a $50 driveway/drainage fee and $75 per inspection for new homes and additions, with trade permits at $75 each.

Can I apply online?

Yes. The City takes building permit applications through its Click2Gov portal.

Who reviews commercial plans?

The State Fire Marshal’s office, under contract with the City, for new and renovated buildings other than one- and two-family homes. The permit is issued only after that review.

Do contractors from out of town pay more?

Yes. Electricians, plumbers and HVAC contractors who do not live or keep a place of business in the city pay an extra $200 per job.

Do I need a permit for re-roofing in Natchitoches?

Yes. R.S. 37:3737(I), as re-enacted by Act 881 of 2026, makes cities that issue building permits permit and inspect roofs and re-roofs; the City’s building permit application covers repair and remodeling work and is filed through Click2Gov.

What do I need for a certificate of occupancy on a house?

A Certificate of Completion form from Planning & Zoning, signed by all contractors and subcontractors who worked on the project.

Simplify Natchitoches permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Louisiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Natchitoches sooner?

Let Alliance prepare, file, and track your Natchitoches permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Natchitoches permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.