Webster County, Kentucky Building Permit Guide

To get a building permit in Webster County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Webster County’s state contact sheet leaves the local building inspector line blank; the Judge/Executive’s office in Dixon is the county contact, and Providence is the one city listed with its own building inspector.

Authority: State Department of Housing, Buildings and Construction; county and citiesCode: 2018 Kentucky Building and Residential CodesCounty: 270-639-5042
Local inspector
Line left blankState sheet, June 15, 2026
Judge/Executive
25 US 41-A South, Dixon270-639-5042
Septic evaluation
$200, apply in personWebster County Health Center
State highways
KYTC District 2Madisonville; 502-764-1320

Webster County’s page on the state Department of Housing, Buildings and Construction (HBC) inspector list, updated June 15, 2026, has an empty local building inspector entry: no name, no phone and no “None”. The Green River Area Development District’s directory lists the county’s housing inspector post as vacant and its planning and zoning director as not applicable. Plan on HBC for plan review, plumbing and HVAC, the Judge/Executive’s office in Dixon (270-639-5042) for local electrical inspection and any county requirement, and the Webster County Health Center for septic. Inside the six cities, ask city hall first.

What requires a building permit in Webster County?

With the local inspector entry blank, the published sources do not show a county building permit for houses in Webster County. Ask the Judge/Executive’s office before building to confirm. HBC’s published rule covers places without a local program: construction projects must go to the state for review and approval before work begins, except dwellings under the Kentucky Residential Code, which are one- and two-family homes and townhouses.

State review where no local program applies

  • Stores, offices, shops, churches, restaurants and industrial buildings
  • Apartment buildings of three or more units
  • Additions, alterations and renovations to those buildings, and changes of use
  • Modular buildings of any size or use

What a house still needs

  • State HVAC permit for new construction
  • Electrical permit and inspection through the local electrical inspector
  • State plumbing permit for new or moved plumbing, water heaters, sewer and water service lines
  • Health department site evaluation and septic permit where there is no sewer
  • Kentucky Transportation Cabinet permit for a state highway entrance

For a house without a local single-family program, HBC says it must still be built to the Kentucky Residential Code, but no building inspections are made except of its mechanical systems, by the state HVAC division, and of its wiring, by the local electrical inspector.

What the county decides and what the state holds

The Fiscal Court meets on the second and fourth Mondays at 9:00 a.m. at the Senior Center in Dixon. Its published permitting roles are local electrical inspection, through the Judge/Executive’s office, and county roads, through the road engineer and supervisor on State Route 132 West; the county takes part in the flood insurance program. HBC holds plan review, plumbing and HVAC permits (Webster is not on HBC’s local HVAC list, updated May 13, 2025), manufactured homes, elevators, boilers and trade licenses.

Webster County building department: who handles permitting

Apart from the blank local entry, the Webster County sheet lists the state building inspector, the manufactured housing inspector and the state electrical, elevator, HVAC, plumbing and boiler inspectors for the county.

Short on time to read all of this?

Get a free quote →
Webster County permitting contacts
OfficeContact
Webster County Judge/Executive (county contact; local electrical inspector)25 US 41-A South, P.O. Box 155, Dixon, KY 42409; 270-639-5042; fax 270-639-7009
HBC Building Codes (state plan review, jurisdiction)502-573-0373; SmartGov support 502-573-0365
Webster County Health Center (septic; state plumbing desk)80 Clayton Ave., P.O. Box 109, Dixon, KY 42409; 270-639-9315; environmentalist 270-639-7799; weekdays 8:00–12:00 and 1:00–4:30; plumbing inspector Tuesdays 8:00–9:00 a.m. Central
County road engineer / supervisor1074 State Route 132 W., Dixon; 270-639-7000
Webster County Clerk (deeds and plats)P.O. Box 19, Dixon; 270-639-7006
Webster County PVA (maps, farm registration)P.O. Box 88, Dixon; 270-639-7016
KYTC District 2 permits (state highways)1840 North Main St., Madisonville, KY 42431; 502-764-1320

Cities in Webster County

Incorporated cities (Census 2025 estimates; city offices from the GRADD directory)
CityWhat the sources show
Providence (2,872)Directory lists a city building inspector; City Building, 201 E. Main St.; 270-667-5463
Sebree (1,546)Directory lists a Sebree planning and zoning contact; City Hall, 36 S. Spring St.; 270-835-7501
Clay (1,004)Building inspector line blank, no city planner; 9100 State Route 132 W.; 270-664-2444
Dixon (920), county seatBuilding inspector line blank; City Hall, 10 US Highway 41-A North; 270-639-5088
Slaughters (191)No city planner; 23 Main Cross; 270-884-7000
Wheatcroft (100)Building inspector listed as not applicable; P.O. Box 42; 270-871-5061

The state sheet has no city entries for Webster County. Providence runs its own electric, water, sewer, gas and garbage service for about 1,700 customers, so utility connections there go through the city’s utility office, open weekdays from 8 a.m. to 4 p.m.

Webster County permit types and supporting documents

Most filings are made with HBC in the SmartGov portal, which handles building, HVAC, manufactured housing, plumbing and fire prevention applications after you choose the project’s jurisdiction, or in person at the health center in Dixon.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

For a house in the unincorporated county, the paperwork the published sources describe is the septic site evaluation and the state trade permits. Plumbing permits are issued to licensed master plumbers, or to homeowners who personally do the plumbing in a home they occupy or are building for their own use, after applying before work starts and filing an affidavit; the state allows one new-home homeowner permit per person every five years. HVAC permits are bought by licensed or authorized applicants. A manufactured home is installed under HBC’s manufactured housing section. Inside Providence or Sebree, ask city hall what the city requires before you begin.

Commercial permits

Where no local program covers the site, commercial, industrial, institutional and apartment buildings go to HBC with complete construction documents and must be approved before construction starts; that includes additions, renovations and changes of use. Inside Providence, ask the city building inspector first whether the city reviews smaller buildings. Commercial plumbing is reviewed and permitted by the state, and a modular building needs site placement approval with a site plan, pier or foundation and tie-down details.

What comes before the building permit

  • Septic site evaluation. Required before construction on any home or commercial property without municipal sewer; apply in person at the health center.
  • City utilities. Inside a city, check sewer and water availability with the city; Providence provides its own utilities.
  • Deeds and plats. Recorded with the County Clerk in Dixon; the health center may ask for a plat or survey with the septic application.
  • Floodplain. Webster County participates in the flood insurance program; ask the Judge/Executive’s office about floodplain review for land in a mapped flood zone.
  • Highway entrance. A Kentucky Transportation Cabinet permit for a driveway, drainage change or utility line in a state right-of-way, from the District 2 office in Madisonville; for a county road, ask the county road department.

Webster County building-permit costs and fees

No county building permit fee schedule appears in the published sources; ask the Judge/Executive’s office about any county charge, and city hall about any city fee. The health district’s site evaluation fee is $200, payable to GRDHD; ask the health center about the construction permit charge. The state plumbing fees have applied since March 1, 2022:

Rather talk it over?

Call 1-855-478-4290 →
Published fees that apply in Webster County
ItemFee
Septic site evaluation (Green River District Health Department)$200
State plumbing, one- or two-family dwelling$50 base + $14 per opening
State plumbing, water heater only$50
State plumbing, commercial$50 base + $20 per opening
State plumbing, medical gas piping$50 base + $20 per opening

Worked example. A house with 9 plumbing openings on a new septic site pays the $200 site evaluation and $50 + (9 × $14) = $176 for the state plumbing permit, $376 so far; a replacement water heater alone is $50. HVAC fees appear in the portal when the contractor buys the permit, and HBC plan review fees apply to the buildings it reviews.

Trade permits and who may pull them

  • Electrical. HBC’s portal does not issue electrical permits for private property. The Webster County sheet sends applicants to the Judge/Executive’s office, or the city office for work inside a city, for the local electrical inspector; a state electrical inspector is also assigned to the county.
  • Plumbing. A state permit, with the state plumbing inspector’s office hours at the health center in Dixon on Tuesday mornings from 8:00 to 9:00 Central. Farm dwellings and farm buildings on at least 10 acres outside city limits can qualify for the state farmstead exemption if the land is in bona fide agricultural use and registered with the PVA.
  • HVAC. Kentucky has required a state HVAC permit for all new construction since 2011; only licensed or authorized individuals may apply, and the state HVAC inspector for Webster County inspects.
  • Licenses. HBC licenses electricians, plumbers and HVAC contractors; there is no state general-contractor license, and the published sources show no county or city contractor license.

Rather not deal with the Webster County building department?

Get a free quote →

How to apply for permits in Webster County

1. Find the office

Unincorporated county: Judge/Executive’s office. Inside a city: city hall.

2. State review?

Commercial and apartment projects: HBC Building Codes, 502-573-0373.

3. Septic evaluation

Apply in person at the health center with a location map, site drawing and $200.

4. Contractor permit

After approval, the septic permit is issued to a certified contractor.

5. Trade permits

HVAC and plumbing from the state; electrical through the county or city.

6. Entrance permit

KYTC District 2 for a state highway driveway.

Review, corrections and what causes delay

The septic site drawing has to show property lines and lot dimensions, existing structures, wells, ponds, streams, gullies, swamps and any easements, roads, driveways or rights-of-way, so survey the lot before applying. On commercial work, the HBC plan approval controls the start date. Getting the right office at the outset matters most here, because the city and county roles differ from town to town.

Webster County building inspections and final approval

State inspectors check buildings HBC reviewed against their approved plans. A house outside any local program is not given building inspections, but its HVAC is inspected by the state HVAC inspector, its wiring by the local electrical inspector and its plumbing by the state plumbing inspector; the certified septic contractor builds under a health department permit that includes inspection. Manufactured homes, elevators and boilers have their own state inspectors on the county sheet. In Providence, ask the city building inspector about city inspections.

Kentucky building code in Webster County

FEMA’s Community Status Book lists Webster County as participating in the National Flood Insurance Program, with a current effective flood map dated October 5, 2023, so flood insurance is available in the unincorporated county and development in mapped flood zones is subject to the county’s floodplain rules.

Kentucky has one mandatory statewide building code that local governments may not add to. Cities and counties enforce it and run zoning. The state reviews plans for larger and higher-risk buildings, and the local program reviews smaller ones. Kentucky rules

Permit search and official resources

State permits are tracked in HBC’s SmartGov portal. For county records, ask the Judge/Executive’s office; deeds and plats are at the County Clerk, septic files at the health center, and city records at each city hall. Providence posts its property maintenance ordinance (Ordinance 2016-05, which names a code enforcement officer, a five-member appeals board and a schedule of fines) on its forms page.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Webster County building permit FAQ

Does Webster County have a building inspector?

The state sheet updated June 15, 2026 leaves the local building inspector line blank, and the development district lists the county housing inspector post as vacant; ask the Judge/Executive’s office, 270-639-5042.

Does a house need a building permit?

The published sources show no county building permit for houses; a house still needs state HVAC and plumbing permits, local electrical inspection and, off sewer, a septic permit.

Who reviews a new shop or apartment building?

HBC’s Division of Building Code Enforcement, before construction begins.

Does Providence have its own inspector?

The development district’s directory lists a city building inspector; call City Hall at 270-667-5463.

How do I start a septic permit?

Apply in person at the Webster County Health Center, 80 Clayton Avenue, Dixon, with a location map, site drawing and the $200 fee.

When is the plumbing inspector in Dixon?

Tuesdays, 8:00 to 9:00 a.m. Central.

Who permits a driveway on a state highway?

KYTC District 2 in Madisonville, 502-764-1320.

Simplify Webster County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Kentucky. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Webster County sooner?

Let Alliance prepare, file, and track your Webster County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Webster County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.