Webster County’s page on the state Department of Housing, Buildings and Construction (HBC) inspector list, updated June 15, 2026, has an empty local building inspector entry: no name, no phone and no “None”. The Green River Area Development District’s directory lists the county’s housing inspector post as vacant and its planning and zoning director as not applicable. Plan on HBC for plan review, plumbing and HVAC, the Judge/Executive’s office in Dixon (270-639-5042) for local electrical inspection and any county requirement, and the Webster County Health Center for septic. Inside the six cities, ask city hall first.
What requires a building permit in Webster County?
With the local inspector entry blank, the published sources do not show a county building permit for houses in Webster County. Ask the Judge/Executive’s office before building to confirm. HBC’s published rule covers places without a local program: construction projects must go to the state for review and approval before work begins, except dwellings under the Kentucky Residential Code, which are one- and two-family homes and townhouses.
State review where no local program applies
- Stores, offices, shops, churches, restaurants and industrial buildings
- Apartment buildings of three or more units
- Additions, alterations and renovations to those buildings, and changes of use
- Modular buildings of any size or use
What a house still needs
- State HVAC permit for new construction
- Electrical permit and inspection through the local electrical inspector
- State plumbing permit for new or moved plumbing, water heaters, sewer and water service lines
- Health department site evaluation and septic permit where there is no sewer
- Kentucky Transportation Cabinet permit for a state highway entrance
For a house without a local single-family program, HBC says it must still be built to the Kentucky Residential Code, but no building inspections are made except of its mechanical systems, by the state HVAC division, and of its wiring, by the local electrical inspector.
What the county decides and what the state holds
The Fiscal Court meets on the second and fourth Mondays at 9:00 a.m. at the Senior Center in Dixon. Its published permitting roles are local electrical inspection, through the Judge/Executive’s office, and county roads, through the road engineer and supervisor on State Route 132 West; the county takes part in the flood insurance program. HBC holds plan review, plumbing and HVAC permits (Webster is not on HBC’s local HVAC list, updated May 13, 2025), manufactured homes, elevators, boilers and trade licenses.
Webster County building department: who handles permitting
Apart from the blank local entry, the Webster County sheet lists the state building inspector, the manufactured housing inspector and the state electrical, elevator, HVAC, plumbing and boiler inspectors for the county.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Webster County Judge/Executive (county contact; local electrical inspector) | 25 US 41-A South, P.O. Box 155, Dixon, KY 42409; 270-639-5042; fax 270-639-7009 |
| HBC Building Codes (state plan review, jurisdiction) | 502-573-0373; SmartGov support 502-573-0365 |
| Webster County Health Center (septic; state plumbing desk) | 80 Clayton Ave., P.O. Box 109, Dixon, KY 42409; 270-639-9315; environmentalist 270-639-7799; weekdays 8:00–12:00 and 1:00–4:30; plumbing inspector Tuesdays 8:00–9:00 a.m. Central |
| County road engineer / supervisor | 1074 State Route 132 W., Dixon; 270-639-7000 |
| Webster County Clerk (deeds and plats) | P.O. Box 19, Dixon; 270-639-7006 |
| Webster County PVA (maps, farm registration) | P.O. Box 88, Dixon; 270-639-7016 |
| KYTC District 2 permits (state highways) | 1840 North Main St., Madisonville, KY 42431; 502-764-1320 |
Cities in Webster County
| City | What the sources show |
|---|---|
| Providence (2,872) | Directory lists a city building inspector; City Building, 201 E. Main St.; 270-667-5463 |
| Sebree (1,546) | Directory lists a Sebree planning and zoning contact; City Hall, 36 S. Spring St.; 270-835-7501 |
| Clay (1,004) | Building inspector line blank, no city planner; 9100 State Route 132 W.; 270-664-2444 |
| Dixon (920), county seat | Building inspector line blank; City Hall, 10 US Highway 41-A North; 270-639-5088 |
| Slaughters (191) | No city planner; 23 Main Cross; 270-884-7000 |
| Wheatcroft (100) | Building inspector listed as not applicable; P.O. Box 42; 270-871-5061 |
The state sheet has no city entries for Webster County. Providence runs its own electric, water, sewer, gas and garbage service for about 1,700 customers, so utility connections there go through the city’s utility office, open weekdays from 8 a.m. to 4 p.m.
Webster County permit types and supporting documents
Most filings are made with HBC in the SmartGov portal, which handles building, HVAC, manufactured housing, plumbing and fire prevention applications after you choose the project’s jurisdiction, or in person at the health center in Dixon.
Not sure this scope needs a permit?
Get a free quote →Residential permits
For a house in the unincorporated county, the paperwork the published sources describe is the septic site evaluation and the state trade permits. Plumbing permits are issued to licensed master plumbers, or to homeowners who personally do the plumbing in a home they occupy or are building for their own use, after applying before work starts and filing an affidavit; the state allows one new-home homeowner permit per person every five years. HVAC permits are bought by licensed or authorized applicants. A manufactured home is installed under HBC’s manufactured housing section. Inside Providence or Sebree, ask city hall what the city requires before you begin.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Where no local program covers the site, commercial, industrial, institutional and apartment buildings go to HBC with complete construction documents and must be approved before construction starts; that includes additions, renovations and changes of use. Inside Providence, ask the city building inspector first whether the city reviews smaller buildings. Commercial plumbing is reviewed and permitted by the state, and a modular building needs site placement approval with a site plan, pier or foundation and tie-down details.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Septic site evaluation. Required before construction on any home or commercial property without municipal sewer; apply in person at the health center.
- City utilities. Inside a city, check sewer and water availability with the city; Providence provides its own utilities.
- Deeds and plats. Recorded with the County Clerk in Dixon; the health center may ask for a plat or survey with the septic application.
- Floodplain. Webster County participates in the flood insurance program; ask the Judge/Executive’s office about floodplain review for land in a mapped flood zone.
- Highway entrance. A Kentucky Transportation Cabinet permit for a driveway, drainage change or utility line in a state right-of-way, from the District 2 office in Madisonville; for a county road, ask the county road department.
Webster County building-permit costs and fees
No county building permit fee schedule appears in the published sources; ask the Judge/Executive’s office about any county charge, and city hall about any city fee. The health district’s site evaluation fee is $200, payable to GRDHD; ask the health center about the construction permit charge. The state plumbing fees have applied since March 1, 2022:
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Septic site evaluation (Green River District Health Department) | $200 |
| State plumbing, one- or two-family dwelling | $50 base + $14 per opening |
| State plumbing, water heater only | $50 |
| State plumbing, commercial | $50 base + $20 per opening |
| State plumbing, medical gas piping | $50 base + $20 per opening |
Worked example. A house with 9 plumbing openings on a new septic site pays the $200 site evaluation and $50 + (9 × $14) = $176 for the state plumbing permit, $376 so far; a replacement water heater alone is $50. HVAC fees appear in the portal when the contractor buys the permit, and HBC plan review fees apply to the buildings it reviews.
Trade permits and who may pull them
- Electrical. HBC’s portal does not issue electrical permits for private property. The Webster County sheet sends applicants to the Judge/Executive’s office, or the city office for work inside a city, for the local electrical inspector; a state electrical inspector is also assigned to the county.
- Plumbing. A state permit, with the state plumbing inspector’s office hours at the health center in Dixon on Tuesday mornings from 8:00 to 9:00 Central. Farm dwellings and farm buildings on at least 10 acres outside city limits can qualify for the state farmstead exemption if the land is in bona fide agricultural use and registered with the PVA.
- HVAC. Kentucky has required a state HVAC permit for all new construction since 2011; only licensed or authorized individuals may apply, and the state HVAC inspector for Webster County inspects.
- Licenses. HBC licenses electricians, plumbers and HVAC contractors; there is no state general-contractor license, and the published sources show no county or city contractor license.
Rather not deal with the Webster County building department?
Get a free quote →How to apply for permits in Webster County
Unincorporated county: Judge/Executive’s office. Inside a city: city hall.
Commercial and apartment projects: HBC Building Codes, 502-573-0373.
Apply in person at the health center with a location map, site drawing and $200.
After approval, the septic permit is issued to a certified contractor.
HVAC and plumbing from the state; electrical through the county or city.
KYTC District 2 for a state highway driveway.
Review, corrections and what causes delay
The septic site drawing has to show property lines and lot dimensions, existing structures, wells, ponds, streams, gullies, swamps and any easements, roads, driveways or rights-of-way, so survey the lot before applying. On commercial work, the HBC plan approval controls the start date. Getting the right office at the outset matters most here, because the city and county roles differ from town to town.
Webster County building inspections and final approval
State inspectors check buildings HBC reviewed against their approved plans. A house outside any local program is not given building inspections, but its HVAC is inspected by the state HVAC inspector, its wiring by the local electrical inspector and its plumbing by the state plumbing inspector; the certified septic contractor builds under a health department permit that includes inspection. Manufactured homes, elevators and boilers have their own state inspectors on the county sheet. In Providence, ask the city building inspector about city inspections.
Kentucky building code in Webster County
FEMA’s Community Status Book lists Webster County as participating in the National Flood Insurance Program, with a current effective flood map dated October 5, 2023, so flood insurance is available in the unincorporated county and development in mapped flood zones is subject to the county’s floodplain rules.
Kentucky has one mandatory statewide building code that local governments may not add to. Cities and counties enforce it and run zoning. The state reviews plans for larger and higher-risk buildings, and the local program reviews smaller ones. Kentucky rules
Permit search and official resources
State permits are tracked in HBC’s SmartGov portal. For county records, ask the Judge/Executive’s office; deeds and plats are at the County Clerk, septic files at the health center, and city records at each city hall. Providence posts its property maintenance ordinance (Ordinance 2016-05, which names a code enforcement officer, a five-member appeals board and a schedule of fines) on its forms page.
Want this handled start to finish?
Get a free quote →- State contact sheet for Webster County inspectors (June 15, 2026)
- State inspector contact sheets, all counties
- Webster County officials (Green River ADD)
- Providence officials
- Sebree officials
- Clay officials
- Dixon officials
- Slaughters officials
- Wheatcroft officials
- City of Providence
- Providence forms: Ordinance 2016-05
- Webster County Health Center
- Onsite sewage and septic systems
- State building codes: places without a local program
- State Division of Building Code Enforcement
- State SmartGov permit portal
- State plumbing permits and fees
- State plumbing FAQ: homeowner and farmstead rules
- State HVAC permits
- Kentucky Transportation Cabinet permits
- KYTC district permit offices
- FEMA Community Status Book, Kentucky
Inspections are where schedules slip.
Get a free quote →Webster County building permit FAQ
Does Webster County have a building inspector?
The state sheet updated June 15, 2026 leaves the local building inspector line blank, and the development district lists the county housing inspector post as vacant; ask the Judge/Executive’s office, 270-639-5042.
Does a house need a building permit?
The published sources show no county building permit for houses; a house still needs state HVAC and plumbing permits, local electrical inspection and, off sewer, a septic permit.
Who reviews a new shop or apartment building?
HBC’s Division of Building Code Enforcement, before construction begins.
Does Providence have its own inspector?
The development district’s directory lists a city building inspector; call City Hall at 270-667-5463.
How do I start a septic permit?
Apply in person at the Webster County Health Center, 80 Clayton Avenue, Dixon, with a location map, site drawing and the $200 fee.
When is the plumbing inspector in Dixon?
Tuesdays, 8:00 to 9:00 a.m. Central.
Who permits a driveway on a state highway?
KYTC District 2 in Madisonville, 502-764-1320.
Simplify Webster County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Kentucky. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Webster County sooner?
Let Alliance prepare, file, and track your Webster County permits while your crew stays on the job.
More Kentucky permitting guides
Hopkins County
Read guide →Union County
Read guide →Henderson County
Read guide →Whitley County Building Permit Guide
Read guide →Winchester Building Permit Guide
Read guide →Woodford County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Webster County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.