Skip to main content
Municipal GuideKansasOttawa · Franklin County

Ottawa, Kansas Building Permit Guide

Ottawa’s Community Development Department on the second floor of City Hall issues building, trade and sign permits inside the city, inspects the work and licenses contractors under the 2018 International Codes.

Authority: City of Ottawa Community DevelopmentCode: 2018 International Codes; 2017 NECPhone: 785-229-3620
Authority
Community Development, 101 S. Hickory, 2nd floor
Permit office phone
785-229-3620 (inspections 785-229-3624)
Fee basis
Valuation, Resolution 1863-21 (1997 UBC Table 1-A)
Residential plan review
$0

Building permits inside Ottawa come from the City’s Community Development Department at 101 S. Hickory, 2nd floor (785-229-3620), using the City’s building permit application. Fees follow Resolution 1863-21 and are based on project value, so a $250,000 house pays $1,833.75 with no residential plan review fee. Unincorporated land around the city is permitted by Franklin County.

What requires a permit in Ottawa?

Resolution 1863-21 lists the work the City charges for, which shows what needs a permit inside city limits:

Building

  • New houses, additions, basement finishes and remodels
  • Covered and uncovered decks, porches, garages, carports and storage sheds
  • Roofs, siding, window replacement and awnings
  • Foundation repair, footings and retaining walls
  • Accessibility ramps, pools and solar panels
  • Manufactured homes and demolition
  • Agricultural buildings inside the city, which the City’s amended building code does not exempt

Site, trade and other

  • Electrical, plumbing and HVAC work
  • Irrigation sprinklers and backflow devices
  • Fences and driveways
  • Excavation, grading and land disturbance
  • Floodplain development and stormwater permits
  • Signs and communication towers
  • Moving a building or an oversize or overweight load through the city

Only one building permit is issued per address for new construction or a major remodel. The Chief Building Official can approve separate permits when individual trades work more than 120 days apart.

Who issues building permits in Ottawa?

Community Development handles planning, building codes, code enforcement and contractor licensing for the City. Vic Finch became Community Development Director and Chief Building Official in July 2026.

Short on time to read all of this?

Get a free quote →
Ottawa Community Development
DetailInformation
Address101 S. Hickory, 2nd floor, Ottawa, KS 66067 (mail: P.O. Box 60)
Main phone785-229-3620
Inspections785-229-3624
Emailcommunitydevelopment@ottawaks.gov
Stormwater coordinator785-229-3632
HoursMonday–Friday, 8 a.m.–5 p.m.

Outside the city limits, building permits come from the Franklin County Planning & Building Department at 1428 S. Main St., Suite 5 (785-229-3570).

Permit costs and fees in Ottawa

Fees come from Resolution 1863-21, adopted May 19, 2021 and in effect since July 1, 2021; the City’s 2026 budget still names it as the current fee schedule. Building permits are priced on valuation using the 1997 Uniform Building Code Table 1-A, and the Chief Building Official can set the valuation if the application understates it.

Ottawa building permit fees by valuation (Resolution 1863-21)
Project valuationFee
$1–$500$23.50
$501–$2,000$23.50 plus $3.05 for each additional $100 or fraction
$2,001–$25,000$69.25 plus $14 for each additional $1,000 or fraction
$25,001–$50,000$391.25 plus $10.10 for each additional $1,000 or fraction
$50,001–$100,000$643.75 plus $7 for each additional $1,000 or fraction
$100,001–$500,000$993.75 plus $5.60 for each additional $1,000 or fraction
$500,001–$1,000,000$3,233.75 plus $4.75 for each additional $1,000 or fraction
Over $1,000,000$5,608.75 plus $3.65 for each additional $1,000 or fraction

For example, a house valued at $250,000 pays $993.75 plus 150 × $5.60, a $1,833.75 permit. Residential plan review is free. For commercial and industrial work reviewed by City staff, an estimated permit fee is worked out and a 20% staff review fee is charged when the permit is submitted; review by an outside consultant is billed at actual cost.

Not sure this scope needs a permit?

Get a free quote →
Other Ottawa permit fees (Resolution 1863-21)
ItemFee
Roof, single-family or duplex$50; by valuation from $8,000
Siding or window replacement$50 residential, $115 commercial
Fence$25 residential, $50 commercial
Driveway (residential)$50
Deck or porch under 30 in. above grade$50 residential, $115 commercial
Pool: above-ground / in-ground$50 / $100 residential; $200 commercial
Demolition: house, garage and shed / garage only / shed only$60 / $35 / $30
Floodplain development permit$25 residential, $50 commercial
Stormwater permit$100
Sign$1 per sq ft, $50 minimum
Re-inspection after the third inspection$75 each
After-hours inspection$100, 2-hour minimum
Temporary certificate of occupancyFree for 30 days, then $100 per 30 days

Starting work without a permit doubles the permit fee. In the C-4 Central Business District, repairs and improvements to upper-floor homes above businesses pay no permit fee, and commercial work pays half the normal fee.

Electrical, plumbing and HVAC permits and contractor licences

Trade permits are issued by Community Development under the 2017 National Electrical Code and the 2018 International Plumbing, Mechanical, Fuel Gas and Energy Conservation Codes. A residential electrical, plumbing or HVAC permit is $45 and a commercial one $50; new equipment and new systems are priced on valuation, as are residential replacements over $12,000 and commercial replacements over $15,000. Private sewage systems inside the city follow the City’s own Private Sewage Disposal Code.

Rather talk it over?

Call 1-855-478-4290 →

Contractors need a City occupational licence, which expires each December 31; renewals paid after January 31 carry a $75 late fee. Most classes require a passing score of 75% on a nationally recognized exam, roofers need either five years’ experience or an exam plus a State of Kansas roofing certificate, and specialty contractors need three years’ experience. Annual licence fees are $225 (Class A general), $210 (B building), $190 (C residential), $125 (R roofing), $100 (S specialty) and $175 for an electrical, plumbing or HVAC company, plus $20 for each master or journeyman, and qualifying individuals need six hours of continuing education a year.

What to submit with an Ottawa permit application

  • The building permit application, with a project valuation that includes all trade costs and the project’s total square footage
  • Owner, general contractor and subcontractor details, and the roofing contractor’s State of Kansas licence number
  • Plans and specifications, and a site plan drawn like the City’s 2025 residential site plan example
  • A driveway site plan when a driveway is new or modified
  • For commercial projects, the Americans with Disabilities Act compliance worksheet
  • A land disturbance permit application and worksheet when grading, clearing or filling is involved

Applicants are responsible for describing property boundaries accurately, and each application carries separate planning and zoning and building approvals.

Rather not deal with the building department?

Get a free quote →

How to get a building permit in Ottawa

1. Confirm the site is inside Ottawa

County land around the city goes to Franklin County Planning & Building.

2. Use licensed contractors

Every general and trade contractor needs a current City of Ottawa licence; owners may do their own work on a home they live in.

3. Prepare plans and the valuation

Include all trade costs in the valuation and follow the City’s site plan example.

4. Submit to Community Development

File the application with plans at Community Development, 101 S. Hickory; commercial work pays the 20% staff review fee at submission.

5. Pay for the permit

All fees are due before the permit is issued.

6. Schedule inspections

Call 785-229-3624 and pay any re-inspection fee before the next inspection is booked.

Ottawa inspections and occupancy

Inspections are scheduled on the Community Development inspection line, 785-229-3624. Under Resolution 1863-21, a $75 re-inspection fee applies after the third inspection and to every one after that, and all fees must be paid before the next inspection is scheduled. Inspections after hours cost $100 with a two-hour minimum.

A temporary certificate of occupancy is good for 30 days. The first one is free, and $100 is charged for every further 30 days until the final certificate of occupancy is issued.

Local Ottawa rules

Owner-builders: an owner may do the work on a single-family home they live in or will live in, provided the Chief Building Official has approved the plans and the owner shows knowledge of the work, applies for the permit and requests the inspections. Owners may not work on utility connections, and a homeowner who builds a new residence for their own occupancy more than once in three years must be licensed as a contractor.

Land disturbance: clearing, grading, excavating, filling or storing materials needs a land disturbance permit under Chapter 14 of the city code, and any project that disturbs one acre or more also needs a stormwater pollution prevention (SWP2) plan; contact the stormwater coordinator at 785-229-3632 before starting.

Appeals: a seven-member Construction Board of Appeals hears appeals and requests for changes to the building codes; the application fee is $150.

Want this handled start to finish?

Get a free quote →

Kansas building code

Kansas has no general statewide building code: each city and county adopts and amends its own. A few state rules apply everywhere, led by the Kansas Fire Prevention Code. Kansas rules

Official Ottawa permit resources

Inspections are where schedules slip.

Get a free quote →

Ottawa permit FAQs

How much is a building permit in Ottawa?

It is based on project value. A $250,000 house pays $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or $1,833.75, and residential plan review is free.

Do I need a permit to replace my roof?

Yes. A single-family or duplex roof is $50, or priced on valuation when the job is $8,000 or more, and the roofer must hold an Ottawa licence and a Kansas roofing certificate.

Do I need a permit for a fence?

Yes. A residential fence permit is $25 and a commercial one $50.

Can a homeowner pull a permit in Ottawa?

Yes, for a single-family home the owner lives in or will live in, once the Chief Building Official approves the plans. Work on utility connections must be done by licensed contractors.

How do I schedule an inspection?

Call the Community Development inspection line at 785-229-3624. Re-inspection fees of $75 apply after the third inspection.

Which building codes does Ottawa use?

The 2018 International Building, Residential, Existing Building, Energy Conservation, Fuel Gas, Mechanical, Plumbing, Fire and Property Maintenance Codes, and the 2017 National Electrical Code.

Simplify Ottawa permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Kansas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Ottawa sooner?

Let Alliance prepare, file, and track your Ottawa permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Ottawa permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.