Jefferson County, Kansas Building Permit Guide

Jefferson County’s Community Development Department in the Oskaloosa courthouse issues building permits for land outside the cities through an online portal, and each of the county’s eight cities runs its own permits.

Authority: Jefferson County Community DevelopmentFiling: Online permit portal (inquiry form first)Phone: 785-403-0000, ext. 3
Authority
Community Development, 300 Jefferson St., Oskaloosa
Permit office phone
785-403-0000, ext. 3
New house fee
$400 ($2,400 in sewer districts 2, 3, 5, 6, 10, 11 and 12)
Processing time
Up to 10 working days

For land outside the cities, Jefferson County building permits come from the Community Development Department at 300 Jefferson Street, Oskaloosa (785-403-0000, ext. 3), and every request starts with an online inquiry form. A new house costs $400, or $2,400 in seven sewer-district subdivisions, and staff have 10 working days to process a complete application once the Health Department and Road & Bridge have signed off. Oskaloosa, Valley Falls, Perry and the other cities issue their own permits.

Who issues building permits in Jefferson County?

Community Development, led by Director Stephan Metzger, has three divisions: Planning and Zoning handles rezonings, subdivisions and zoning complaints; Building and Construction issues building, sign and other project permits; and Economic Development. The office is in the courthouse at 300 Jefferson St. (mailing address PO Box 628), open 8:00 a.m. to 4:30 p.m., Monday to Friday. County zoning applies to all land outside city limits.

Who issues building permits, by place
PlaceWho issues building permits
Unincorporated Jefferson CountyJefferson County Community Development, 300 Jefferson St., Oskaloosa; 785-403-0000, ext. 3
Oskaloosa (pop. 1,060)City Hall, 212 W. Washington St.: the City’s application covers new buildings, remodels, additions, garages, accessory buildings, pools, decks and fences ($25 for a deck or fence); a permit lapses if work does not start within 90 days
Valley Falls (pop. 1,055)City Administrator issues permits and reviews plans: $25 for the first $1,000 plus $2 per additional $1,000. City Hall 785-945-6612
Perry (pop. 848)City Hall, 205 W. Bridge St., 785-597-5613; approved by the Zoning Administrator. A new home is $400, a fence $25; commercial work is 1.25% of estimated cost under city code section 4-113 (amended in 2026), though the City’s application form still shows 0.5%
McLouth (pop. 832)City of McLouth: application with a land survey, reviewed by the City Administrator and City Inspector and approved by the Planning Commission
Meriden (pop. 709)City of Meriden building permit application and Planning and Zoning Commission; City Hall 785-484-3450
Ozawkie (pop. 617)City permit required under the city code posted online (marked an unofficial draft), with the mayor as building official
Nortonville (pop. 579)City permit under the city code: $5 fee; none needed for a building or shed under 120 sq ft
Winchester (pop. 440)City permit under the city code: $20 for the first $1,000 of value plus $1 per additional $1,000, with the mayor as chief building official

Short on time to read all of this?

Get a free quote →

What needs a county building permit?

The county application covers new and replacement homes, barns, garages, shops, sheds, carports, storage buildings, decks, porches, solar panels, residential and accessory additions, commercial buildings and additions, and changes of use between accessory and residential. The online inquiry form checks first whether a permit is needed at all.

Permit needed

  • New houses and other living space
  • Accessory buildings, garages, barns and pools
  • Decks, porches and additions
  • Commercial buildings and additions
  • Signs and special events
  • Converting a building to or from residential use
  • Any development in a floodplain (separate floodplain permit)

No permit or no fee

  • Fences are generally exempt from zoning, unless subdivision rules say otherwise
  • Accessory residential structures of 120 sq ft or less (10 ft by 12 ft) pay no fee under the 2011 fee resolution, but the application rules still apply
  • Agricultural uses and farm dwellings pay no zoning certificate fee

Not sure this scope needs a permit?

Get a free quote →

Jefferson County permit fees

Jefferson County building permit fees
PermitFee
Residential permit (new home or other living space)$400
New dwelling in sewer districts 2, 3, 5, 6, 10, 11 or 12$2,400 ($400 permit plus $2,000 sewer connection)
Additional residential living space$100
Other residential additions (decks, porches)$50
Accessory structure$75
Accessory structure addition$50
Commercial structure / commercial addition$200 / $100
Change of use: residential to accessory / accessory to residential$75 / $400
Sign permit / special event permit$15 / $100
Rezoning, conditional use, development plan or zoning appeal$200 each

The base fees date from Resolution 2011-016, effective July 11, 2011. Since January 1, 2025, Resolution 2025-035 has added a $2,000 sewer connection fee for new houses in Indian Ridge, Hilldale, Hickory Acres, Lakeshore Estates, Hilldale South, Three Hills and Westshore Estates. Building without a valid permit quadruples the fee for the permit issued afterwards.

Wastewater, driveways and the Health Department

Private septic systems and lagoons are permitted by the Jefferson County Health Department, 1212 Walnut (U.S. Highway 59), Oskaloosa (785-403-0025), under the County’s environmental sanitary code. Take a copy of the zoning building permit application and a pre-site drawing showing the buildings, the planned system and any active or abandoned wells, fill in the permit application and pay the fee. The Environmental Specialist visits the site, a county-licensed installer builds the system, the Health Department inspects it before it is covered, and the installer files an as-built drawing before the permit is issued, with a copy to Planning and Zoning.

Rather talk it over?

Call 1-855-478-4290 →

A new driveway onto a county road needs a Road & Bridge consultation (785-403-0279, ext. 1), which also sets the 911 address; a new entrance on a state highway needs a Kansas Department of Transportation consultation. The building permit is issued only after the wastewater and entrance applications are approved.

What to submit

Paperwork

  • Paid tax receipts, printed on the day you apply, for all real and personal property of the applicant and owner (Resolution 2015-010)
  • A copy of the deed
  • A notarized affidavit of authorization if someone other than the owner applies
  • Articles of incorporation or similar papers for a company, trust or partnership owner

Project details

  • Distance from every property line; staff can help draw the site map
  • Type, use, foundation and frame of the building
  • Estimated cost, dimensions and living area
  • Bedrooms and baths, sewage system type and any new driveway
  • Floodplain status

The application includes a certificate of occupancy agreement: the owner agrees that staff may visit the property and that the building will not be used until the County issues the certificate and any wastewater system has passed its final Health Department inspection.

How to get a building permit in unincorporated Jefferson County

1. Start with the inquiry form

Enter the address on the County’s online inquiry form, with no log-in, to see whether a permit is needed.

2. Create a portal account

If a permit is required, register in the permitting portal and open the building permit application.

3. Gather the documents

Tax receipts, deed, any affidavit, and the site and building details.

4. Clear wastewater and access

Take the application and site map to the Health Department and Road & Bridge for their approvals.

5. Receive the permit

Staff have 10 working days from a complete application to process it; construction must be finished within 1 year.

6. Call for the final visit

Tell Planning and Zoning when the work is done; staff visit before issuing the certificate of occupancy.

Rather not deal with the Jefferson County building department?

Get a free quote →

Completion and occupancy

When construction is complete, the owner or agent contacts the Planning and Zoning office and a staff site visit follows. The County then issues a certificate of occupancy confirming that the building and its use comply with the zoning regulations; the certificate says the County assumes no liability for the construction and has performed no survey. Occupying a building with a septic system also requires the Health Department’s final wastewater inspection certificate.

A permit becomes void if work has not started within 90 days, and it expires one year after issue whatever stage the work has reached.

Local Jefferson County details

Sewer districts: the County’s sewer districts include Indian Ridge, Hilldale, Westshore Estates, Hickory Acres, Lake Shore Estates, Three Hills and Hilldale South, most with special assessments per home and per vacant lot, and the County has presented the districts with a consolidation proposal.

Floodplain: the County participates in the National Flood Insurance Program, and all development in the floodplain needs a floodplain development permit under Article 14 of the zoning regulations.

Lot size: you do not need 40 acres to build a house; a parcel created in line with the zoning and subdivision regulations can receive a residential permit. Setbacks vary by zoning district.

Land development: rezoning, plat, conditional use and agricultural lot split applications go through the portal and are open to surveyors and engineers.

Kansas building code

Kansas has no general statewide building code: each city and county adopts and amends its own. A few state rules apply everywhere, led by the Kansas Fire Prevention Code. Kansas rules

Want this handled start to finish?

Get a free quote →

Official Jefferson County permitting resources

Inspections are where schedules slip.

Get a free quote →

Jefferson County permit FAQs

How much is a building permit for a new house in rural Jefferson County?

$400. In sewer districts 2, 3, 5, 6, 10, 11 and 12 a new house pays $2,400, which includes the $2,000 sewer connection fee set by Resolution 2025-035.

Do I need a permit for a fence?

Generally no; fences are exempt from the zoning regulations unless subdivision rules apply. Keep fences out of the road right-of-way.

How long does a county permit take?

Staff have 10 working days from a complete application, and the wastewater and driveway approvals must be in place first.

Who issues septic permits?

The Jefferson County Health Department at 1212 Walnut in Oskaloosa (785-403-0025), with a site visit by its Environmental Specialist and installation by a county-licensed installer.

Do I need 40 acres to build a house?

No. A parcel created in compliance with the zoning and subdivision regulations can be issued a residential building permit.

What if I build without a permit?

The County can post a stop order, and the fee for the permit issued afterwards is quadrupled.

Simplify Jefferson County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Kansas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Jefferson County sooner?

Let Alliance prepare, file, and track your Jefferson County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Jefferson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.