Building permits inside Palos Heights come from the city’s Building Department and Code Compliance office at City Hall, 7607 W College Drive (708-361-1804, building@palosheights.org; Monday to Friday, 7:30 a.m. to 4:00 p.m.), headed by Building Commissioner and Building Official Frank J. Giordano. Applications go in at the counter, in the drop box, by mail or by email, with a digital copy of all construction documents; permits are paid for and picked up in person. Every contractor registers with the city first, for $200 (general) or $100 (subcontractor) a year plus a $20,000 bond.
What requires a building permit in Palos Heights?
The city says building permits are needed for most home improvements and posts a separate application for each common job; if your work is not on the list, call 708-361-1804 to ask whether a permit is required. The 31 applications show how widely permits reach, from roofs and gutters to tree removal, portable storage containers and tents.
Home projects with their own form
- Additions, remodeling, finished basements and new construction
- Decks, patios, sidewalks, stoops and driveways
- Fences, sheds, garages and retaining walls
- Pools, above or in ground
- Roofs, siding, windows, doors, gutters, soffit and fascia
- Electrical, plumbing, HVAC, lawn sprinklers and sewer or water repairs
- Tree removal and portable storage containers (PODs)
Commercial and other forms
- Commercial occupancy
- Fire alarm and fire sprinkler work
- Permanent and temporary signs
- Tents and temporary structures
- Cell tower and water tower work
- Demolition
- Miscellaneous work not listed elsewhere
What Palos Heights decides and what the state holds
The city adopts its own codes. Its posted list is the 2009 International Building, Residential, Fire, Mechanical, Fuel Gas, Property Maintenance, Swimming Pool and Spa and Performance codes, the 2011 City of Chicago Electrical Code and the 2018 International Energy Conservation Code. It also lists two state codes: the 2014 Illinois State Plumbing Code and the current Illinois Accessibility Code. On top of the codes, city ordinances such as the Commercial Areas Design and Development Guidelines and the Harlem Avenue Overlay District shape commercial projects.
Palos Heights building department: who handles permitting
The Building Department and Code Compliance office reviews plans, issues permits, inspects work and enforces property maintenance rules. Its staff includes electrical and plumbing inspectors as well as a building inspector, and every city inspector carries city identification. Inspectors do not arrive unannounced at a home except on a code enforcement complaint, and the code compliance officer will not ask to come inside. Zoning questions go to the Community Development / Zoning Department (708-480-3022). Land outside the city in unincorporated Cook County is permitted by the Cook County Department of Building and Zoning.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Department / Code Compliance, City Hall, 7607 W College Drive, Palos Heights, IL 60463 |
| Phone and email | 708-361-1804; building@palosheights.org; fax 708-923-7112 |
| Hours | Monday to Friday, 7:30 a.m. to 4:00 p.m. (City Hall 8:30 a.m. to 5:00 p.m., 708-361-1800) |
| Building official | Frank J. Giordano, Building Commissioner / Building Official |
| Zoning | Community Development / Zoning Department, 708-480-3022 |
| Unincorporated land | Cook County Department of Building and Zoning, 69 W. Washington St., Chicago, 312-603-0500 |
Palos Heights permit types
Larger jobs use the Application for Plan Examination and Building Permit, which records the cost of the improvement (with electrical, plumbing and other work listed separately), the use group, the type of frame and construction, the floor area, the parking, and whether the lot uses public sewer and water or a septic system and well. Page 2 names every contractor on the job. The office routes the plans through zoning, building, plumbing, electrical, fire district, engineering and public works review as each applies, and commercial plans through commercial review.
Residential permits
- Fences. Fences may go only in side and rear yards, up to 6 feet above grade, with posts at least 42 inches deep and the finished side facing out. Back-to-back fences are not allowed, a fence may not block drainage, and a pool needs a 6-foot barrier. The application asks for a plat of survey marking the fence and whether the lot is a corner lot.
- Decks. A deck must sit inside the buildable area, out of easements and the side yard setback, on 42-inch post holes, with balusters no more than 4 inches apart and a 36-inch guardrail. The ground below is cleared and covered with 2 inches of gravel over 4-mil plastic. The form’s first page calls for a handrail on steps with 2 or more risers, while its second page says 3 or more. Carbon monoxide detectors must be in place within 15 feet of every bedroom when the inspector visits.
- Pools and sheds. A pool stays out of easements, at least 5 feet from underground electric lines and 10 feet from overhead lines, and 10 feet from the rear and side property lines; it must be enclosed on all four sides by a fence or barrier at least 6 feet high and have anti-siphon sillcocks, and a $500 engineering escrow may be required. The shed form covers sheds of 144 square feet or less, which may be no taller than 12 feet, may not sit in an easement and need treated lumber within 6 inches of the ground.
- Driveways. Public Works reviews every new or rebuilt driveway for culvert needs. A driveway may be no wider than 25 feet at the right-of-way, stays 5 feet from side property lines and keeps its existing elevation, with a 2-foot asphalt apron, 6 inches of concrete in the right-of-way, 4 inches on private property over a compacted granular base, and no water B-box set in the concrete.
- Trees and storage pods. Trees removed for new construction need a tree removal permit with a plat showing their location, size and species, and trees in the right-of-way may not be removed. A portable storage pod permit is valid for 10 days, and the pod must sit on the driveway or another hard surface.
- Roofs. Roofers attach their Illinois roofing license. An overlay is limited to two layers in total, the dumpster stays on private property at least 5 feet from the lot line, and the ice and water shield must be inspected before new shingles go on.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
New commercial space and tenant changes use the commercial occupancy application along with the plan examination form, and the Commercial Areas Design and Development Guidelines and the Harlem Avenue Overlay District apply where the property falls within them. Signs, tents, fire alarm and sprinkler work each have their own applications. The application form warns that the contractor is responsible for every outside agency approval, such as Cook County, MWRD or a state agency, and that the permit is not valid until those approvals are obtained.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The 2019 zoning map shows each district, and the Community Development / Zoning Department checks setbacks and use. Where a variance is needed, the permit form lists it among the approvals that must be in hand first; the city’s Planning and Zoning Commission meets as needed rather than on a fixed schedule.
- Stormwater. Palos Heights is not on MWRD’s list of authorized municipalities, so any Watershed Management Ordinance permit the project needs comes from MWRD, and the city’s form lists MWRD among the outside approvals.
- Utilities. The plan examination form carries lines for a water meter fee and a sewer tap-in fee on new connections.
Palos Heights permit costs and fees
The city’s pages and permit applications do not print building permit fee amounts. The fee is entered by the Building Department on the application, which records the cost of the work, so call 708-361-1804 with the scope and cost for the amount. The plan examination form shows what may be billed on a larger job: the building permit fee, electrical and plumbing review fees, an escrow deposit, a landscaping bond, a water meter fee and a sewer tap-in fee. The amounts the city does publish are below.
Rather talk it over?
Call 1-855-478-4290 →| Item | Amount |
|---|---|
| General contractor registration | $200 a year |
| Subcontractor registration | $100 a year |
| Contractor bond | $20,000 trade-specific bond |
| Rental property registration (Ordinance O-28-16) | $100 a year |
| Vacant property registration (Ordinance O-29-16) | $175 a year |
Permits are paid for when they are picked up, by cash, check or credit card, and card payments are accepted only for amounts under $1,500. Contractor registration is paid at the time of registration; American Express is not accepted, and there is no online payment.
Trade permits and who may pull them
All contractors working in Palos Heights must be registered with the city before a permit issues, and a registration lasts one year from the date it is issued. Registration is done in person between 7:30 a.m. and 2:30 p.m. on weekdays, or by mail; emailed registrations are refused. A general contractor pays $200 and a subcontractor $100, and each posts a $20,000 trade-specific bond naming the city and carries general liability and workers’ compensation coverage of at least $500,000, with the city as certificate holder.
- Electrical contractors: evidence of a current electrical license, plus the city fee, bond and insurance. Electrical work has its own permit application and city electrical inspector.
- Roofing contractors: the roofer’s license, plus the city fee, bond and insurance; the roof permit form also asks for the Illinois State roofing license.
- Plumbing contractors: a State of Illinois license only; no city fee, bond or insurance certificate is required. Illinois licenses plumbers through the Department of Public Health.
- Alarm and elevator contractors: a State of Illinois license only, with no city fee, bond or insurance certificate.
Rather not deal with the building department?
Get a free quote →How to apply for a Palos Heights building permit
Pick the application for your job on the Permits & Applications page, or call 708-361-1804.
Register each contractor in person or by mail with the fee, bond and insurance.
Attach a plat of survey, drawings and the cost of work, and keep digital copies of all construction documents.
Hand it in at the Building Department, use the drop box at the entrance, mail it, or email building@palosheights.org.
Secure any Cook County, MWRD, state or variance approval the form lists.
Collect the permit in person and pay by cash, check or card under $1,500.
Review, corrections and what causes delay
The office will not issue a permit until every contractor is fully registered, and the permit is not valid until outside approvals are in hand. Packages without a digital copy of the construction documents, a plat of survey showing the work, or the separate costs of electrical and plumbing work slow the review, and any variance must be approved before the permit is valid.
Inspections and certificates in Palos Heights
Call the Building Department at 708-361-1804 to book inspections, giving at least 24 hours’ notice. Fences and decks need post hole and final inspections, roofs need an ice and water shield inspection before shingling and a final, and the inspector checks carbon monoxide detectors on deck jobs. Construction may run from 7:30 a.m. to 7:00 p.m. on weekdays and from 8:30 a.m. to 6:00 p.m. on weekends and holidays.
Rental and vacant properties must be registered with the city each year under Ordinances O-28-16 and O-29-16, in force since November 1, 2016: the application, a plat of survey and a fee of $100 for a rental or $175 for a vacant property. The code compliance staff enforce property maintenance across the city, and the Building Department answers questions on registration at 708-361-1804.
Illinois building code in Palos Heights
Palos Heights enforces the 2009 International codes, the 2011 Chicago Electrical Code and the 2018 energy code listed above through its Building Department. FEMA’s Community Status Book lists the City of Palos Heights (community 170142) as participating in the National Flood Insurance Program, with flood maps effective November 1, 2019.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Palos Heights building permit FAQs
How do I submit a permit application in Palos Heights?
At the Building Department counter, in the drop box by its entrance, by mail, or by email to building@palosheights.org, with a digital copy of all construction documents.
Want this handled start to finish?
Get a free quote →Can the permit be emailed to me?
No. Permits are picked up and paid for in person at the Building Department.
How much does contractor registration cost?
$200 a year for a general contractor and $100 for a subcontractor, plus a $20,000 bond; licensed plumbers, alarm and elevator contractors pay no city fee.
How much is a building permit?
The city does not post its building permit fees; call 708-361-1804 with the scope and cost of the work for a quote.
How tall can a fence be?
Up to 6 feet above grade, in side and rear yards only, with 42-inch post holes and the finished side facing out.
Can I lay new shingles over my old roof?
Only as an overlay of no more than two layers in total, with an ice and water shield inspection before the new shingles go on.
What are the construction hours?
7:30 a.m. to 7:00 p.m. on weekdays and 8:30 a.m. to 6:00 p.m. on weekends and holidays.
Do I have to register a rental house?
Yes. Rental properties register every year for $100, and vacant properties for $175.
Palos Heights permit search and official resources
For a permit’s status, call the Building Department at 708-361-1804. Copies of permits, plans and inspection records are public records requested under the Freedom of Information Act through the online FOIA portal linked from the city’s FOIA page, or with the paper request form available at City Hall, 7607 W College Drive; the city answers within the time the law allows.
Inspections are where schedules slip.
Get a free quote →- Palos Heights Building Department and Code Compliance
- Permits and applications
- Application for plan examination and building permit
- Fence permit application
- Deck permit application
- Roofing permit application
- Pool permit application
- Shed permit application
- Driveway permit application
- Contractor registration
- Construction hours and adopted codes
- Rental and vacant property registration
- Economic and Community Development
- Zoning map (2019)
- Boards and commissions
- Freedom of Information requests
- MWRD authorized municipalities
- Cook County Department of Building and Zoning
- FEMA Community Status Book, Illinois
Simplify Palos Heights permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Palos Heights sooner?
Let Alliance prepare, file, and track your Palos Heights permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Park Forest
Read guide →Park Ridge
Read guide →Peoria Building Permit Guide
Read guide →Pingree Grove Building Permit Guide
Read guide →Plano Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Palos Heights permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.