Skip to main content
Municipal GuideGeorgiaNorcross · Gwinnett County

Norcross, Georgia Building Permit Guide

To get a building permit in Norcross, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

How building permits work in Norcross: who issues them, online plan submittal, fees and how to book inspections.

Authority: City of Norcross Community Development (Building Official)Code: Georgia State Minimum Standard Codes (2024)Phone: 678-421-2027
Authority
City of Norcross Community DevelopmentBuilding Official: plan review, permits and inspections
Apply / Intake
Online plan submittal portalnorcrossga.eps.cloud
Inspections
678-421-2027 or inspections@norcrossga.netBy 4:30 p.m. the day before

The City of Norcross handles building permits and inspections through its Community Development Department and Building Official, and every building and land disturbance permit is filed in the City’s ePlan Solutions portal. Building permits cost $8 per $1,000 of construction value, with a $100 residential minimum, and inspections are called in by 4:30 p.m. the day before.

What requires a permit in Norcross?

The Building Official’s staff review plans, issue building permits and inspect construction, including structural, accessibility, electrical, plumbing, fuel gas, heating and air-conditioning work. The City publishes separate commercial and residential building permit applications, demolition, utility construction and tree removal applications, and residential exterior, interior and solar panel checklists.

The fee schedule adds trade permits for electrical, gas, HVAC, low-voltage, plumbing and re-roof work, new fences, signs, tree removal, irrigation meters, power releases, changes of occupancy, demolition and deconstruction, and clearing, grubbing and grading. Residential work that expands the footprint or changes an exterior wall uses the additions and alterations application; changes inside the existing footprint use the interior remodel application.

Norcross building department: who handles permitting

The Building Official’s staff review plans, issue permits and inspect construction. The City names Craig Lokey as Building Official. Gwinnett County Fire issues the fire certificate of occupancy that commercial projects need before the City’s building CO.

Norcross permitting contact
DetailInformation
Local authorityCity of Norcross Community Development & Planning / Building Official
Office65 Lawrenceville St., Norcross, GA 30071
Phone678-421-2027
HoursMonday–Friday, 8:00–11:00 a.m.; other times by appointment
Online plan submittalnorcrossga.eps.cloud
Inspections emailinspections@norcrossga.net
Building OfficialCraig Lokey

Short on time to read all of this?

Get a free quote →

Norcross permit types and filing workflow

All building permits and land disturbance permits are submitted through the online plan submittal portal. The portal lets applicants upload plans, follow the review, respond to comments, upload revisions and view permit records.

Changes of occupancy have their own Change of Occupancy/Business License forms.

Building forms on the City’s permit page:

  • Residential and Commercial Building Permit Applications, with the exterior (additions and alterations), interior remodel and solar panel checklists.
  • GC Affidavit and Subcontractor Affidavit for every contractor and sub, each with a state licence, local business licence and driver’s licence.
  • Homeowner Waiver and Owner Affidavit for an owner who lives, or will live, in the home and acts as their own contractor; plumbing, electrical and HVAC must still be done by licensed subs with affidavits.
  • Authorized Agent Affidavit for permit expediters, architects or engineers acting for the owner.
  • Trade Permit Application, Power Activation and Request for Power Release, As Built Certification and Foundation Location Certificate.

Permit fees in Norcross

Fees come from the Community Development Department Fee Schedule, effective July 6, 2022 and updated December 2025. Construction value is based on the 2019 ICC Building Valuation Data.

Norcross permit fees (updated December 2025)
ProjectFee
Residential new construction, addition or remodel$8 per $1,000 of value, $100 minimum, plus $50 for the CO or CC
Commercial new construction, addition or remodel$8 per $1,000 of value, $150 minimum, plus $75 for the CO or CC
Residential trade or re-roof permit$30
Commercial trade or re-roof permit$125
Power release or activation$65 residential, $125 commercial
New residential fence$25
Residential demolition$50 plus $50 CC, plus $1,000 cash bond
Deconstruction$100 review plus $150 permit
Change of occupancy$75
Tree removal$125 ($25 for dead, diseased, hazardous or invasive trees)
Re-inspection / same-day special inspection$75 / $65

Not sure this scope needs a permit?

Get a free quote →

For example, a $150,000 addition has a permit fee of $1,200 plus $50 for the certificate. Starting work without a permit doubles the fee, with a $50 minimum. Review fees are not refundable once review begins; permit fees can be refunded if no permit is issued or no work is done.

Electrical, plumbing, mechanical and other trade permits

The Building Official inspects electrical, plumbing, fuel gas and heating and air-conditioning work. The fee schedule lists separate trade permits; residential electrical, gas, HVAC, low-voltage, plumbing or re-roof upgrades and repairs are $30, and commercial ones $125. Trade contractors need a current Georgia licence.

Application documents and plan review

Combine the construction drawings into a single PDF, all in the same orientation, drawn to scale, with a cover sheet and sheet index. Give the square footage of the rooms affected and the valuation, meaning the total cost of materials and labor.

New home, addition or exterior change

  • Survey and site plan with setbacks, buffers, easements and lot coverage calculations
  • Existing utilities, including water, sewer or septic
  • Grading and drainage plans and any retaining wall details
  • Erosion control plan with BMP locations, and the erosion bond if needed
  • Tree conservation plan with the canopy coverage calculation
  • Floor plans, roof plans and elevations
  • Foundation, framing and truss drawings

Interior remodel

  • Residential building permit application
  • Existing and proposed floor plans
  • Foundation and framing details where affected
  • Contractor affidavits, or the owner-contractor affidavit
  • Authorized agent affidavit if an expediter, architect or engineer files

Rather talk it over?

Call 1-855-478-4290 →

Upload revisions to the same record in the portal; the City also publishes a re-submittal checklist and an engineering checklist for land development.

How to apply: 6-step Norcross process

1. Confirm City jurisdiction

Check the property is inside Norcross city limits.

2. Select the correct permit

Match the application to the project scope and identify related trade or specialty permits.

3. Assemble the submittal

Prepare the City application, plans, site information, contractor credentials and project-specific supporting documents.

4. Submit online

Upload the application and plans through the City’s online plan submittal portal.

5. Resolve review comments

Track comments, provide corrected documents and complete required fee or prerequisite steps.

6. Inspect and close out

Request required inspections, pass finals and obtain the applicable completion or occupancy documentation.

Norcross inspections

Call the department at 678-421-2027 or email inspections@norcrossga.net by 4:30 p.m. the day before you want the inspection; do not leave requests on voicemail. Inspections usually start at 8:00 a.m. and the inspector will not call ahead. Results are marked on the inspection sheet left on site and posted in the online portal.

For new construction and additions, the City’s required order is footing, slab, rough mechanical, plumbing and electrical, sheathing and house wrap, insulation, roofing and siding, final MEP and the overall final.

Rather not deal with the building department?

Get a free quote →

The permit must be posted where it can be seen from the street, and erosion control must be in place before any inspection. Work that is not ready or fails is charged a $75 re-inspection fee, payable before the next inspection is booked. Third-party inspections need the Building Inspector’s approval in advance, and copies of their reports go to Community Development. A certificate of occupancy is issued after the final passes and all fees are paid.

Local Norcross details that matter

New commercial buildings and commercial remodels must give Community Development the Gwinnett County Fire certificate of occupancy before the City issues its building certificate of occupancy. For a change of occupancy, the Gwinnett County Fire Marshal CO must be issued before the City inspection is booked.

Demolition: the demolition project in ePlan Solutions carries a $100 fee and needs contractor affidavits, an asbestos abatement report with the inspector’s certification, proof the report and fees went to the State of Georgia, proof of ownership, a site plan and a $1,000 cash bond.

Historic districts: for property in the national or local historic district, a demolition first goes to a public hearing before the Architectural Review Board or Historic Preservation Commission, with a $500 historic review fee and a Certificate of Appropriateness. New construction in the historic district is reviewed for $150, and minor residential changes for $25.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Norcross permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Norcross permit FAQs

Does Norcross issue its own building permits?

Yes. The City’s Community Development Department and Building Official review plans, issue building permits and inspect work inside city limits.

How do I apply for a Norcross building permit?

Submit the application and plans through the City’s online plan submittal portal, using the residential or commercial building permit application.

Inspections are where schedules slip.

Get a free quote →

What does a Norcross building permit cost?

$8.00 per $1,000 of construction value, with a $100 residential or $150 commercial minimum plus the certificate fee, under the City’s fee schedule updated December 2025.

How much is a re-roof or trade permit?

$30 for residential electrical, gas, HVAC, low-voltage, plumbing or re-roof work, and $125 for commercial.

Can a homeowner pull a permit?

Yes, with the Homeowner Waiver if you live or will live in the home; licensed subcontractors with affidavits must do the plumbing, electrical and HVAC work.

How are Norcross inspections requested?

Call 678-421-2027 or email inspections@norcrossga.net by 4:30 p.m. the day before the inspection.

Simplify Norcross permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Norcross sooner?

Let Alliance prepare, file, and track your Norcross permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Norcross permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.