Everything contractors, builders, and developers need to pull a Marietta building permit — the published fee rates, the escalating re-inspection ladder, SagesGov filing, the pool and spa code, and how the city differs from the county that surrounds it.

Authority: City of Marietta Building Inspection Division (Public Works)Code: 2024 Georgia State Minimum Standard CodesSubmission: SagesGov — all permitting online
Authority
Building InspectionPublic Works, City Hall
Portal
SagesGovMarietta-specific account
Fees
Published ratesPer thousand of construction cost
Re-inspection
EscalatingEach disapproved visit costs more

Marietta building permits come from the city’s Building Inspection division, part of the Public Works department at City Hall. It provides plan review, issues building, electrical, grading, heating and air, and plumbing permits, performs those inspections, and issues certificates of occupancy.

Marietta is the seat of Cobb County and is not permitted by Cobb County. The county's own agency uses a Marietta mailing address and permits the unincorporated county around the city — one of the easiest jurisdiction mix-ups in Georgia.

Applies inside the Marietta city limits. Unincorporated Cobb County files with the Cobb County Community Development Agency, and Smyrna, Kennesaw, Acworth, Austell, Powder Springs, and Mableton each permit their own work.

📈

Re-inspection fees escalate. The first inspection is free; a first disapproved re-inspection is $50, the second $75, and the third and every one after it $100. Arriving genuinely ready for the first visit is worth more here than the fee saved.

What requires a permit in Marietta?

A Marietta building permit is required for all new construction, temporary buildings, and certain alterations to existing construction inside the city limits. Permitting sits in the Building Inspection division of the Public Works department at Marietta City Hall, which provides plan review, issues building, electrical, grading, heating and air, and plumbing permits, performs the corresponding inspections, and issues certificates of occupancy. Planning and Zoning is a separate office in Development Services.

Marietta is the county seat of Cobb County and is not permitted by Cobb County. The county's own Community Development Agency has a Marietta mailing address and permits the unincorporated county around the city — which makes this one of the easiest jurisdiction mix-ups in Georgia to make, and one of the easiest to avoid by checking the parcel.

All permitting is done online using SagesGov, and the account is city-specific: you create or activate a Marietta account rather than reusing one from another SagesGov jurisdiction. The documents required depend on the project type — residential or commercial, interior only or exterior, general contractor or homeowner acting as contractor.

Permit required

  • All new construction and temporary buildings
  • Certain alterations to existing construction
  • Electrical, grading, heating and air, and plumbing work
  • Swimming pools and spas, under the pool and spa code with Georgia amendments
  • Land disturbance permits
  • Change of occupancy requiring a new certificate

Typically exempt

  • Painting, flooring, and other cosmetic work
  • Ordinary repairs that do not touch structure or a regulated system
  • Work outside the city limits — unincorporated Cobb files with the county
  • Like-for-like replacements that do not alter a regulated system
⚠️ Re-inspection fees escalate, and they escalate steeply. Marietta charges nothing for the first inspection, then $50 for the first disapproved re-inspection, $75 for the second, and $100 for the third and each one after that. On a job that keeps failing the same inspection, the ladder becomes a real number quickly — and it is a signal from the city that repeat visits are not free to it either.

Georgia’s State Minimum Standard Codes apply statewide; the Department of Community Affairs adopts them, with Georgia Amendments, and city and county building departments enforce them under their own permit rules. Georgia rules

Marietta building department: who handles permitting

The Building Inspection division works from Marietta City Hall, 205 Lawrence Street, Marietta, GA 30060, with mail going to P.O. Box 609, Marietta 30061-0609. Permits and inspections are reached on 770-794-5659 or buildinginspections@mariettaga.gov, and Public Works lists its permits and inspections hours as 8:00am to 5:00pm Monday to Friday. Planning and Zoning sits on the second floor of City Hall on 770-794-5669, open 8:00am to 5:00pm Monday to Friday.

Marietta publishes its fee arithmetic openly. Permit fees are determined by construction cost — labour plus materials — with a $50 minimum. Residential runs $5 per $1,000 of total construction cost plus a $50 base fee, with no plan review fee. Commercial and institutional runs $4 per $1,000 up to $250,000, and $6 per $1,000 at $250,000 and above, each plus the $50 base fee and a flat plan review fee: $125 under $250,000, $250 up to $500,000, $500 up to $1 million, and $1,000 at $1 million and over.

Short on time to read all of this?

Get a free quote →

That residential structure is worth noticing: no plan review fee at all on the residential side, and a lower per-thousand rate on commercial jobs of $250,000 or less than on larger ones.

Marietta permitting contact
DetailInformation
AuthorityCity of Marietta Building Inspection Division (Public Works)
ScopeInside the Marietta city limits — not unincorporated Cobb County
AddressMarietta City Hall, 205 Lawrence Street, Marietta, GA 30060
MailingP.O. Box 609, Marietta, GA 30061-0609
Phone770-794-5659 — buildinginspections@mariettaga.gov; Public Works hours 8:00am to 5:00pm, Monday to Friday
Planning and Zoning770-794-5669, second floor, 8:00am to 5:00pm
PortalSagesGov — a Marietta-specific account is required
Minimum fee$50 base fee on permits
Pool codeInternational Swimming Pool and Spa Code with Georgia Amendments
💻

Marietta issues building, electrical, grading, heating and air, and plumbing permits from a single Building Inspection division, performs all of those inspections itself, and issues the certificates of occupancy. One division, one portal, one set of contacts — which is simpler than most metro Atlanta arrangements once you are in the right jurisdiction.

Cobb County’s Community Development Agency uses a Marietta mailing address and sits minutes from City Hall, but the two are different authorities. The county permits unincorporated Cobb; the city permits inside its limits. Cobb also offers inspection scheduling by text message, so a crew used to one should check how the other books inspections.

In 2025, building permits issued in Marietta authorized 112 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Marietta permits: record types and what each covers

Marietta issues an unusually broad set of records from one division, including grading. These are the records you will file:

Residential permit types

Residential permit types in Marietta
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdFull plan review against the 2024 IRC with Georgia Amendments, plus zoningValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; existing-building provisions apply only where locally adoptedValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDry-in and deck inspection; plan review rarely requiredValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageElectrical review led, with structural review of the attachmentFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, and rewiringTrade review; filed as its own record under a Class I or Class II licencePer-permit minimum or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementTrade review; filed under a Master Plumber Class I or Class II licencePer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationTrade review; conditioned air licence class keyed to system capacityPer-permit minimum or per-unit
Deck and porchNew decks, screened porches, and structural rebuildsFooting and framing review against the residential codeFlat or valuation-based
Pool and spaIn-ground and above-ground pools, spas, barriers, and bondingStructural, barrier, and electrical bonding review under the 2024 ISPSCValuation-based
Accessory structureSheds, detached garages, and carports above the local size thresholdZoning first, then structural review where applicableFlat or valuation-based
DemolitionFull or partial demolition of a structureUtility disconnect verification and asbestos notificationFlat
Land disturbanceClearing, grading, and any disturbance above the local thresholdErosion and sedimentation review on its own statutory clockPer-acre or valuation-based
Grading permitSite grading workIssued and inspected by the Building Inspection divisionConstruction cost basis

Not sure this scope needs a permit?

Get a free quote →

Commercial permit types

Commercial permit types in Marietta
Permit typeWhat triggers itReview pathFee basis
New constructionGround-up commercial, industrial, and multifamily buildingsFull multi-discipline review; sealed plans requiredValuation-based
Tenant build-outInterior fit-ups and suite build-outs in an existing shellConcurrent building, trade, and fire reviewValuation-based
Renovation / alterationStructural, envelope, or system changes to an existing buildingPlan review scaled to scope; accessibility triggers attachValuation-based
Change of occupancyConverting a building from one occupancy classification to anotherLife-safety, accessibility, and zoning reviewValuation or flat
Shell buildingA building permitted without a known tenant or useShell review only; no certificate of occupancy until a build-out closesValuation-based
ReroofCommercial roof covering replacement or recoverStructural check on added dead load; fire review where applicableValuation or squares
Solar photovoltaicCommercial rooftop, carport, and ground-mount arraysStructural, electrical, and fire access reviewValuation or system-size based
ElectricalService, distribution, and branch circuit workTrade review; separate record from the building permitValuation or per-device
PlumbingSupply, waste, vent, grease, and gas systemsTrade review; backflow and grease interceptor sign-offs attachValuation or per-fixture
Mechanical / HVACRooftop units, ductwork, exhaust, and refrigerationTrade review; energy compliance documented against the 2015 IECCValuation or per-unit
Fire protectionSprinkler, standpipe, alarm, hood, and suppression systemsFire review under the state Safety Fire Commissioner's adopted codesValuation or per-device
SignWall, monument, and illuminated signageZoning review plus electrical where illuminatedFlat or per-sign
Land disturbanceSite clearing, grading, and stormwater installationErosion and sedimentation review as a Local Issuing AuthorityPer-acre or valuation-based
Pool and spa permitSwimming pools and spasReviewed under the pool and spa code with Georgia amendmentsConstruction cost basis
Outside agency approvalUses or project types requiring another agency's sign-offUploaded with the application in SagesGovSet by that agency

Rather talk it over?

Call 1-855-478-4290 →

Residential

  • Single-discipline review in most cases
  • Trade records filed separately under Chapter 14 licences regardless of job value
  • State licence required for residential work once its total value exceeds $2,500; commercial work at any value
  • A private professional provider may be engaged to shorten the review path

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • Land-disturbance review runs on its own statutory clock under Title 12
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Marietta

Marietta record catalog
RecordWhat it covers
Building permitNew construction, temporary buildings, and certain alterations
Electrical permitIssued and inspected by the Building Inspection division
Heating and air permitMechanical work, from the same division
Plumbing permitSupply, waste, vent, and fixture work
Grading permitSite grading, issued alongside the building records
Pool and spa permitUnder the pool and spa code with Georgia amendments
Fence (no permit)Exempt from a building permit; Planning and Zoning rules on height, location and configuration still apply
Certificate of OccupancyIssued by the Building Inspection division at close-out

Rather not deal with the building department?

Get a free quote →

Solar permits in Marietta

Solar in Marietta is an electrical record from the same division that issues the building permit and performs the inspection. Because the fee follows construction cost — labour plus materials — state the array cost accurately rather than as a placeholder.

Roofing permits in Marietta

Reroofs inside the city are Marietta permits, not Cobb County ones, even though the county’s agency shares the town name in its address. A roofing crew working both sides of the line is working two systems with different inspection booking.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Solar and roofing work are built to the statewide codes, permit rules are set locally, and utilities run interconnection on their own timeline. Georgia rules

Marietta permit cost

Marietta states its rates, so a reliable estimate is possible before you file. Permit fees are determined by construction cost with a $50 minimum. Residential is $5 per $1,000 of total construction cost — labour plus materials — with a $50 base fee and no plan review fee. Commercial and institutional is $4 per $1,000 for projects of $250,000 or less and $6 per $1,000 at $250,000 or greater, each with a $50 base fee plus a plan review fee.

The re-inspection ladder is the other published number and it deserves a line in the programme rather than the budget. The first inspection carries no charge; a first disapproved re-inspection is $50, a second $75, and a third and each one after that $100. Getting the first inspection right is worth more than the fee saved.

Because construction cost drives the fee, the cost figure on the application is a substantive entry rather than an estimate. Labour and materials both count, and a low figure invites a correction rather than a saving.

How Marietta fees are structured
Fee componentHow it works
Minimum permit fee$50
Residential$5 per $1,000 of construction cost, plus $50 base, no plan review fee
Commercial up to $250K$4 per $1,000, plus $50 base, plus plan review fee
Commercial $250K and above$6 per $1,000, plus $50 base, plus plan review fee
First re-inspection$50 — then $75, then $100 for each later failure
Construction costLabour plus materials, stated on the application
🧮

Want a precise number for a specific Marietta project? Send us the scope and we will price the permit path before you file.

Marietta trade permits

Marietta keeps all the trades inside one division, which means one portal account, one set of inspectors, and one escalating re-inspection ladder across every discipline on the job.

One division, five permit types

Building, electrical, grading, heating and air, and plumbing permits all come from the Building Inspection division, which also performs each of those inspections.

A Marietta-specific portal account

All permitting is done online through SagesGov, and the account is created or activated specifically for Marietta rather than carried over from another jurisdiction.

Documents depend on the project type

What you need is determined by residential or commercial, interior only or exterior, and whether a general contractor or a homeowner acting as contractor is applying.

State licence still governs

Chapter 14 trade licences authorise the work regardless of job value, and the residential contractor threshold is $2,500 of total job value.

Want this handled start to finish?

Get a free quote →

Georgia licenses residential contractors through a state board once a job passes $2,500, licenses commercial general contractors at any job value, and licenses electrical, plumbing and conditioned air contractors separately at any job value. Georgia rules

Marietta permit application: how to apply step by step

Here is how to get a building permit in Marietta, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm city, not county

Marietta is the seat of Cobb County and is not permitted by Cobb County. The county's agency uses a Marietta mailing address, so check the parcel rather than the town in the address.

2. Create or activate a Marietta SagesGov account

All permitting is done online through SagesGov, and the account is Marietta-specific. If you already hold a SagesGov account for another jurisdiction, you still need one here.

3. Work out which documents your project type needs

Required documents are determined by whether the work is residential or commercial, interior only or exterior, and whether a general contractor or a homeowner acting as contractor is applying.

4. Price it from the published rates

Residential is $5 per $1,000 of construction cost plus a $50 base fee with no plan review fee. Commercial and institutional is $4 per $1,000 up to $250,000 and $6 per $1,000 above, each plus the $50 base and a plan review fee. The minimum is $50.

5. Submit and clear review

Upload plans, contractor information, and any outside-agency approvals the use or project type requires. Commercial work may carry plan review fees and additional agency approvals.

6. Sequence the inspections carefully

Trade and building rough inspections come before concealment, then the final. Because re-inspection fees escalate from $50 to $75 and then $100 for each later failure, arriving genuinely ready for the first inspection pays.

Inspections in Marietta

The Building Inspection division performs building, electrical, grading, heating and air, and plumbing inspections itself, and issues the certificates of occupancy. Because every discipline is inspected by the same division, co-ordination across trades is simpler here than in cities where fire, health, or a third-party provider hold separate sign-offs.

The escalating re-inspection ladder is the mechanism the city uses to price readiness. The first inspection is free; each subsequent disapproved re-inspection costs more than the last. Treating the first visit as the real one — rather than as a check on progress — is the cheapest approach.

Keep the permit and approved plans on site throughout, and note that Marietta follows the pool and spa code with Georgia amendments on any pool work. a Georgia building permit generally becomes invalid if work does not begin within 180 days of issuance, or if work is suspended or abandoned for 180 days after commencing, under the administrative provisions of the adopted International Building and Residential Codes — local ordinance may set a different period, and extensions are usually available in writing on request.

Georgia law lets an applicant use a private professional provider for plan review, with set deadlines for the building official. Georgia rules

Marietta permit search and official resources

Marietta publishes its permit information, fee schedule, and construction guidelines through the Building Inspection division (Public Works), with SagesGov handling all applications.

Inspections are where schedules slip.

Get a free quote →

Frequently asked questions

Who issues building permits in Marietta, GA?

The City of Marietta Building Inspection division, part of Public Works, at Marietta City Hall, 205 Lawrence Street (770-794-5659). Marietta permits inside its own city limits.

Does Cobb County permit work in Marietta?

No. Marietta is the county seat but permits its own construction. Cobb County's Community Development Agency uses a Marietta mailing address and permits unincorporated Cobb County, which is a common source of confusion.

How do I apply for a Marietta building permit?

All permitting is done online using SagesGov. You create or activate a Marietta-specific account, select the permit type, complete the application, and upload plans, contractor information, and any required agency approvals.

How much does a Marietta building permit cost?

Fees are determined by construction cost with a $50 minimum. Residential is $5 per $1,000 of total construction cost, labour plus materials, with a $50 base fee and no plan review fee. Commercial and institutional is $4 per $1,000 for projects of $250,000 or less and $6 per $1,000 at $250,000 or greater, each with a $50 base fee plus a plan review fee.

Is there a plan review fee for residential work in Marietta?

No. The residential schedule is $5 per $1,000 of construction cost plus the $50 base fee, with no plan review fee. Plan review fees apply on the commercial and institutional side.

What are Marietta's re-inspection fees?

The first inspection carries no charge. A first disapproved re-inspection is $50, a second is $75, and the third and each one after it is $100.

What permits does the Building Inspection division issue?

Building, electrical, grading, heating and air, and plumbing permits. The same division performs those inspections and issues certificates of occupancy.

Does Marietta have its own pool rules?

The city follows the International Swimming Pool and Spa Code with Georgia Amendments, and publishes guidelines for pool construction alongside its permitting procedures.

Do I need a permit for a fence in Marietta?

No. The city’s permit FAQ says fence construction is exempt from a permit, but Planning and Zoning has specific requirements for height, location, and configuration. Check those before building.

What documents will I need to apply?

That depends on the project: residential or commercial, interior only or exterior, and whether a general contractor or a homeowner acting as contractor is applying. The city sets out the required documents by project type.

What code does Marietta enforce?

The Georgia State Minimum Standard Codes as regulated by the Department of Community Affairs, which moved to the 2024 editions with Georgia Amendments effective January 1, 2026. The energy code remains the 2015 IECC with Georgia supplements.

When is a Georgia contractor licence required?

For residential work, once the total value of the work, or the contractor's compensation if higher, exceeds $2,500; commercial general contractors need a licence at any value. Trade licences under Title 43, Chapter 14 are required regardless of job value.

Simplify Marietta permitting with Alliance Permitting

Marietta is easy to estimate — published rates, one division, one portal — and easy to misfile, because the county that surrounds it shares its mailing address. Add a re-inspection ladder that punishes optimistic scheduling and the priorities become obvious. A permit expediter for Marietta files with the right government and arrives ready for the first inspection.

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Marietta because the work is done by people who have stood at the counter:

  • Right authority — city or unincorporated Cobb, resolved from the parcel rather than the Marietta address.
  • Priced and sequenced properly — construction cost stated accurately, and inspections booked only when the work will actually pass.
  • Complete oversight — every Marietta permit, trade record, and inspection tracked across your jobs in one place.

Alliance Permitting is a permit documentation and expediting service. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Marietta sooner?

Let Alliance prepare, file, and track your Marietta permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Marietta permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.