Municipal Guide Georgia Marietta · Cobb County

Marietta Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Marietta building permit — the published fee rates, the escalating re-inspection ladder, SagesGov filing, the pool and spa code, and how the city differs from the county that surrounds it.

Authority: City of Marietta Department of Development ServicesCode: 2024 Georgia State Minimum Standard CodesSubmission: SagesGov — all permitting online
Authority
Development ServicesCity limits, not Cobb County
Portal
SagesGovMarietta-specific account
Fees
Published ratesPer thousand of construction cost
Re-inspection
EscalatingEach disapproved visit costs more

Marietta building permits come from the Department of Development Services at City Hall. Its Building Inspection division provides plan review, issues building, electrical, grading, heating and air, and plumbing permits, performs those inspections, and issues certificates of occupancy.

Marietta is the seat of Cobb County and is not permitted by Cobb County. The county's own agency uses a Marietta mailing address and permits the unincorporated county around the city — one of the easiest jurisdiction mix-ups in Georgia.

Applies inside the Marietta city limits. Unincorporated Cobb County files with the Cobb County Community Development Agency, and Smyrna, Kennesaw, Acworth, Austell, Powder Springs, and Mableton each permit their own work.

📈

Re-inspection fees escalate. The first inspection is free; a first disapproved re-inspection is charged, and the second, third, and fourth each cost more than the last. Arriving genuinely ready for the first visit is worth more here than the fee saved.

What requires a permit in Marietta?

A Marietta building permit is required for all new construction, temporary buildings, and certain alterations to existing construction inside the city limits. Permitting sits in the Department of Development Services at Marietta City Hall, and the Building Inspection division provides plan review, issues building, electrical, grading, heating and air, and plumbing permits, performs the corresponding inspections, and issues certificates of occupancy.

Marietta is the county seat of Cobb County and is not permitted by Cobb County. The county's own Community Development Agency has a Marietta mailing address and permits the unincorporated county around the city — which makes this one of the easiest jurisdiction mix-ups in Georgia to make, and one of the easiest to avoid by checking the parcel.

All permitting is done online using SagesGov, and the account is city-specific: you create or activate a Marietta account rather than reusing one from another SagesGov jurisdiction. The documents required depend on the project type — residential or commercial, interior only or exterior, general contractor or homeowner acting as contractor.

The enforced code is the Georgia State Minimum Standard Codes — the 2024 International Building Code and 2024 International Residential Code with Georgia Amendments, alongside the 2024 International Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code with the 2026 Georgia Amendments. Georgia turned its codes over on January 1, 2026. The Board of Community Affairs, acting on the recommendation of the State Codes Advisory Committee, adopted the 2024 editions of the building, residential, plumbing, mechanical, fuel gas, and swimming pool and spa codes, together with the 2023 National Electrical Code carrying the 2026 Georgia Amendments. A project drawn to the previous editions is drawn to a superseded code, and the Georgia Amendments — not the base I-Code text — are what the plan reviewer reads.

Permit required

  • All new construction and temporary buildings
  • Certain alterations to existing construction
  • Electrical, grading, heating and air, and plumbing work
  • Swimming pools and spas, under the pool and spa code with Georgia amendments
  • Fences, which have their own published construction guidelines
  • Land disturbance permits
  • Change of occupancy requiring a new certificate

Typically exempt

  • Painting, flooring, and other cosmetic work
  • Ordinary repairs that do not touch structure or a regulated system
  • Work outside the city limits — unincorporated Cobb files with the county
  • Like-for-like replacements that do not alter a regulated system
⚠️ Re-inspection fees escalate, and they escalate steeply. Marietta charges nothing for the first inspection, then $50 for the first disapproved re-inspection, $75 for the second, $100 for the third, and $150 for the fourth. On a job that keeps failing the same inspection, the ladder becomes a real number quickly — and it is a signal from the city that repeat visits are not free to it either.

Marietta building department: who handles permitting

Development Services works from Marietta City Hall, 205 Lawrence Street, Marietta, GA 30060, with mail going to P.O. Box 609, Marietta 30061-0609. Planning and Zoning sits on the second floor of City Hall on 770-794-5669, open 8:00am to 5:00pm Monday to Friday.

Marietta publishes its fee arithmetic openly, which makes it one of the easier Georgia cities to estimate. Permit fees are determined by construction cost — labour plus materials — with a $50 minimum. Residential runs $5 per $1,000 of total construction cost plus a $50 base fee, with no plan review fee. Commercial and institutional runs $4 per $1,000 up to $250,000, and $6 per $1,000 at $250,000 and above, each plus the $50 base fee and a plan review fee.

That residential structure is worth noticing: no plan review fee at all on the residential side, and a lower rate on smaller commercial jobs than larger ones. It is one of the few Georgia fee schedules where the rate goes up with project size rather than staying flat.

Marietta permitting contact
DetailInformation
AuthorityCity of Marietta Department of Development Services
ScopeInside the Marietta city limits — not unincorporated Cobb County
AddressMarietta City Hall, 205 Lawrence Street, Marietta, GA 30060
MailingP.O. Box 609, Marietta, GA 30061-0609
Planning and Zoning770-794-5669, second floor, 8:00am to 5:00pm
PortalSagesGov — a Marietta-specific account is required
Minimum fee$50 base fee on permits
Pool codeInternational Swimming Pool and Spa Code with Georgia Amendments
💻

Marietta issues building, electrical, grading, heating and air, and plumbing permits from a single Building Inspection division, performs all of those inspections itself, and issues the certificates of occupancy. One division, one portal, one set of contacts — which is simpler than most metro Atlanta arrangements once you are in the right jurisdiction.

Cobb County's Community Development Agency uses a Marietta mailing address and sits minutes from City Hall, but the two are different authorities. The county permits unincorporated Cobb; the city permits inside its limits. Cobb also schedules inspections by text message while Marietta does not, so a crew carrying habits from one will find the other unfamiliar.

Marietta permits: record types and what each covers

Marietta issues an unusually broad set of records from one division, including grading. These are the records you will file:

Residential permit types

Residential permit types in Marietta
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdFull plan review against the 2024 IRC with Georgia Amendments, plus zoningValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; existing-building provisions apply only where locally adoptedValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDry-in and deck inspection; plan review rarely requiredValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageElectrical review led, with structural review of the attachmentFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, and rewiringTrade review; filed as its own record under a Class I or Class II licencePer-permit minimum or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementTrade review under a Journeyman or Master licencePer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationTrade review; conditioned air licence class keyed to system capacityPer-permit minimum or per-unit
Deck and porchNew decks, screened porches, and structural rebuildsFooting and framing review against the residential codeFlat or valuation-based
Pool and spaIn-ground and above-ground pools, spas, barriers, and bondingStructural, barrier, and electrical bonding review under the 2024 ISPSCValuation-based
Accessory structureSheds, detached garages, and carports above the local size thresholdZoning first, then structural review where applicableFlat or valuation-based
DemolitionFull or partial demolition of a structureUtility disconnect verification and asbestos notificationFlat
Land disturbanceClearing, grading, and any disturbance above the local thresholdErosion and sedimentation review on its own statutory clockPer-acre or valuation-based
Grading permitSite grading workIssued and inspected by the Building Inspection divisionConstruction cost basis
Fence permitNew fencingSubject to the city's published fence construction guidelinesSet by the city

Commercial permit types

Commercial permit types in Marietta
Permit typeWhat triggers itReview pathFee basis
New constructionGround-up commercial, industrial, and multifamily buildingsFull multi-discipline review; sealed plans requiredValuation-based
Tenant build-outInterior fit-ups and suite build-outs in an existing shellConcurrent building, trade, and fire reviewValuation-based
Renovation / alterationStructural, envelope, or system changes to an existing buildingPlan review scaled to scope; accessibility triggers attachValuation-based
Change of occupancyConverting a building from one occupancy classification to anotherLife-safety, accessibility, and zoning reviewValuation or flat
Shell buildingA building permitted without a known tenant or useShell review only; no certificate of occupancy until a build-out closesValuation-based
ReroofCommercial roof covering replacement or recoverStructural check on added dead load; fire review where applicableValuation or squares
Solar photovoltaicCommercial rooftop, carport, and ground-mount arraysStructural, electrical, and fire access reviewValuation or system-size based
ElectricalService, distribution, and branch circuit workTrade review; separate record from the building permitValuation or per-device
PlumbingSupply, waste, vent, grease, and gas systemsTrade review; backflow and grease interceptor sign-offs attachValuation or per-fixture
Mechanical / HVACRooftop units, ductwork, exhaust, and refrigerationTrade review; energy compliance documented against the 2015 IECCValuation or per-unit
Fire protectionSprinkler, standpipe, alarm, hood, and suppression systemsFire review under the state Safety Fire Commissioner's adopted codesValuation or per-device
SignWall, monument, and illuminated signageZoning review plus electrical where illuminatedFlat or per-sign
Land disturbanceSite clearing, grading, and stormwater installationErosion and sedimentation review as a Local Issuing AuthorityPer-acre or valuation-based
Pool and spa permitSwimming pools and spasReviewed under the pool and spa code with Georgia amendmentsConstruction cost basis
Outside agency approvalUses or project types requiring another agency's sign-offUploaded with the application in SagesGovSet by that agency

Residential

  • Single-discipline review in most cases
  • Trade records filed separately under Chapter 14 licences regardless of job value
  • State licence required once the work exceeds the statutory threshold, per project
  • A private professional provider may be engaged to shorten the review path

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • Land-disturbance review runs on its own statutory clock under Title 12
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Marietta

Marietta record catalog
RecordWhat it covers
Building permitNew construction, temporary buildings, and certain alterations
Electrical permitIssued and inspected by the Building Inspection division
Heating and air permitMechanical work, from the same division
Plumbing permitSupply, waste, vent, and fixture work
Grading permitSite grading, issued alongside the building records
Pool and spa permitUnder the pool and spa code with Georgia amendments
Fence permitSubject to the city's published fence construction guidelines
Certificate of OccupancyIssued by the Building Inspection division at close-out

Solar permits in Marietta

Solar is filed as its own record across Georgia rather than as a line item on a building permit, and it is reviewed on two tracks at once: the electrical side (conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection, all against the 2023 National Electrical Code with the 2026 Georgia Amendments) and the structural side (attachment detail, rail spacing, and whether the existing framing carries the added dead load).

Solar in Marietta is an electrical record from the same division that issues the building permit and performs the inspection. Because the fee follows construction cost — labour plus materials — state the array cost accurately rather than as a placeholder.

The covenant question comes up on nearly every residential array, and Georgia answers it less generously than several neighbouring states. Georgia's Solar Power Free-Market Financing Act (O.C.G.A. § 44-3-113 and Title 46, Chapter 3, Article 8) makes third-party solar financing lawful and limits a property owners' association's ability to prohibit solar outright, but Georgia gives homeowners materially less protection than North Carolina or Florida do: an association retains real authority over placement and appearance, and a covenant restricting where panels may sit on the roof will usually stand. Read the covenants before designing the array, not after.

Utility interconnection runs on its own clock alongside the permit. Georgia Power and the state's electric membership corporations each set their own application, meter, and witness-test sequence, and permission to operate is not something the building department controls — plan for the two tracks to finish at different times.

Roofing permits in Marietta

A roof covering replacement needs a permit across most of Georgia. The permit is usually quick, but it is not optional, and the inspection that matters happens before the covering goes on rather than after.

Because Georgia enforces a statewide minimum code, there is no state product-approval database to search and no approval number to cite on the application. The assembly has to comply with the adopted code and the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Reroofs inside the city are Marietta permits, not Cobb County ones, even though the county's agency shares the town name in its address. Cobb schedules inspections by text message and Marietta does not, so a roofing crew working both sides of the line is working two systems.

Sequencing is where reroofs go wrong. The deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up. Where a previous layer has been torn off, expect attention to deck fastening and to any sheathing replaced along the eaves.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Marietta permit cost

Marietta states its rates, so a reliable estimate is possible before you file. Permit fees are determined by construction cost with a $50 minimum. Residential is $5 per $1,000 of total construction cost — labour plus materials — with a $50 base fee and no plan review fee. Commercial and institutional is $4 per $1,000 for projects of $250,000 or less and $6 per $1,000 at $250,000 or greater, each with a $50 base fee plus a plan review fee.

The re-inspection ladder is the other published number and it deserves a line in the programme rather than the budget. The first inspection carries no charge; a first disapproved re-inspection is $50, a second $75, a third $100, and a fourth $150. Getting the first inspection right is worth more than the fee saved.

Because construction cost drives the fee, the cost figure on the application is a substantive entry rather than an estimate. Labour and materials both count, and a low figure invites a correction rather than a saving.

How Marietta fees are structured
Fee componentHow it works
Minimum permit fee$50
Residential$5 per $1,000 of construction cost, plus $50 base, no plan review fee
Commercial up to $250K$4 per $1,000, plus $50 base, plus plan review fee
Commercial $250K and above$6 per $1,000, plus $50 base, plus plan review fee
First re-inspection$50 — then $75, $100, and $150
Construction costLabour plus materials, stated on the application
🧮

Want a precise number for a specific Marietta project? Send us the scope and we will price the permit path before you file.

Marietta trade permits

Marietta keeps all the trades inside one division, which means one portal account, one set of inspectors, and one escalating re-inspection ladder across every discipline on the job.

One division, five permit types

Building, electrical, grading, heating and air, and plumbing permits all come from the Building Inspection division, which also performs each of those inspections.

A Marietta-specific portal account

All permitting is done online through SagesGov, and the account is created or activated specifically for Marietta rather than carried over from another jurisdiction.

Documents depend on the project type

What you need is determined by residential or commercial, interior only or exterior, and whether a general contractor or a homeowner acting as contractor is applying.

State licence still governs

Chapter 14 trade licences authorise the work regardless of job value, and the general contractor threshold sits at two thousand five hundred dollars per project.

🧢 Georgia's contractor licensing threshold is $2,500, which is far lower than most states and catches work people assume is too small to regulate. Under O.C.G.A. § 43-41-2 a state licence is required once the value of the work — or the contractor's compensation, whichever is higher — exceeds that figure, and the test is per project, not per invoice. The State Licensing Board for Residential and General Contractors sits under the Secretary of State and issues four tiers: Residential-Basic (detached one- and two-family homes and townhouses up to three stories); Residential-Light Commercial (adding multifamily and light commercial under four stories and under 25,000 square feet); General Contractor (all building types, no dollar cap); and General Contractor Limited Tier (the same scope capped at $1,000,000 per contract). The consequence of getting this wrong is not just a fine. Under O.C.G.A. § 43-41-17 a contract for work requiring a licence, entered into with a contractor who does not hold one, is unenforceable in law or in equity by that contractor — who also cannot file a mechanic's lien and cannot make a bond claim. An unlicensed contractor on a Georgia job has no collection mechanism at all. The trades are licensed separately under O.C.G.A. Title 43, Chapter 14 through the divisions of the Construction Industry Licensing Board, and those licences are required regardless of project value — the $2,500 floor does not apply to them. Electrical runs Class I (restricted to low-voltage and single-phase installations not exceeding 200 amperes) and Class II (unrestricted). Conditioned air runs Class I (not exceeding 175,000 BTU heating and 60,000 BTU cooling) and Class II (unrestricted). Plumbing runs Journeyman, Master Class I (one- and two-family dwellings and commercial structures not exceeding 10,000 square feet), and Master Class II (unrestricted). One Georgia rule ties the permit directly to the lien statute: under O.C.G.A. § 44-14-361.3 a lien claimant may rely on the building permit issued on the property for the name of the contractor. The permit is not merely a construction approval in Georgia — it is a public record that the lien system reads. Whoever is named on it is who downstream claimants will name, which makes an inaccurate contractor field on a permit application a legal problem rather than a clerical one.

Marietta permit application: how to apply step by step

Here is how to get a building permit in Marietta, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm city, not county

Marietta is the seat of Cobb County and is not permitted by Cobb County. The county's agency uses a Marietta mailing address, so check the parcel rather than the town in the address.

2. Create or activate a Marietta SagesGov account

All permitting is done online through SagesGov, and the account is Marietta-specific. If you already hold a SagesGov account for another jurisdiction, you still need one here.

3. Work out which documents your project type needs

Required documents are determined by whether the work is residential or commercial, interior only or exterior, and whether a general contractor or a homeowner acting as contractor is applying.

4. Price it from the published rates

Residential is $5 per $1,000 of construction cost plus a $50 base fee with no plan review fee. Commercial and institutional is $4 per $1,000 up to $250,000 and $6 per $1,000 above, each plus the $50 base and a plan review fee. The minimum is $50.

5. Submit and clear review

Upload plans, contractor information, and any outside-agency approvals the use or project type requires. Commercial work may carry plan review fees and additional agency approvals.

6. Sequence the inspections carefully

Trade and building rough inspections come before concealment, then the final. Because re-inspection fees escalate from $50 through $75, $100, and $150, the value of arriving genuinely ready for the first inspection is higher here than in most cities.

Inspections in Marietta

The Building Inspection division performs building, electrical, grading, heating and air, and plumbing inspections itself, and issues the certificates of occupancy. Because every discipline is inspected by the same division, co-ordination across trades is simpler here than in cities where fire, health, or a third-party provider hold separate sign-offs.

The escalating re-inspection ladder is the mechanism the city uses to price readiness. The first inspection is free; each subsequent disapproved re-inspection costs more than the last. Treating the first visit as the real one — rather than as a check on progress — is the cheapest approach.

Georgia also lets an applicant bring a private professional provider to the plan review itself. Once the permit application and the provider's affidavit are both in, the building official has 30 days to issue the permit or give written notice identifying the specific plan features that do not comply and the specific code chapters and sections behind each. If that written notice does not arrive inside 30 days, the application is deemed approved as a matter of law and the permit shall be issued. A timely notice tolls the 30 days; when revisions come back, the official has the remainder of the tolled period plus five business days (O.C.G.A. § 8-2-26(g)).

Keep the permit and approved plans on site throughout, and note that Marietta follows the pool and spa code with Georgia amendments on any pool work. a Georgia building permit generally becomes invalid if work does not begin within 180 days of issuance, or if work is suspended or abandoned for 180 days after commencing, under the administrative provisions of the adopted International Building and Residential Codes — local ordinance may set a different period, and extensions are usually available in writing on request.

Marietta permit search and official resources

Marietta publishes its permit information, fee schedule, and construction guidelines through Development Services, with SagesGov handling all applications.

Frequently asked questions

Who issues building permits in Marietta, GA?

The City of Marietta Department of Development Services, through its Building Inspection division at Marietta City Hall, 205 Lawrence Street. Marietta permits inside its own city limits.

Does Cobb County permit work in Marietta?

No. Marietta is the county seat but permits its own construction. Cobb County's Community Development Agency uses a Marietta mailing address and permits unincorporated Cobb County, which is a common source of confusion.

How do I apply for a Marietta building permit?

All permitting is done online using SagesGov. You create or activate a Marietta-specific account, select the permit type, complete the application, and upload plans, contractor information, and any required agency approvals.

How much does a Marietta building permit cost?

Fees are determined by construction cost with a $50 minimum. Residential is $5 per $1,000 of total construction cost, labour plus materials, with a $50 base fee and no plan review fee. Commercial and institutional is $4 per $1,000 for projects of $250,000 or less and $6 per $1,000 at $250,000 or greater, each with a $50 base fee plus a plan review fee.

Is there a plan review fee for residential work in Marietta?

No. The residential schedule is $5 per $1,000 of construction cost plus the $50 base fee, with no plan review fee. Plan review fees apply on the commercial and institutional side.

What are Marietta's re-inspection fees?

The first inspection carries no charge. A first disapproved re-inspection is $50, a second is $75, a third is $100, and a fourth is $150.

What permits does the Building Inspection division issue?

Building, electrical, grading, heating and air, and plumbing permits. The same division performs those inspections and issues certificates of occupancy.

Does Marietta have its own pool rules?

The city follows the International Swimming Pool and Spa Code with Georgia Amendments, and publishes guidelines for pool construction alongside its permitting procedures.

Do I need a permit for a fence in Marietta?

The city publishes guidelines for fence construction as part of its permitting information. Check those guidelines for your fence type and location before building.

What documents will I need to apply?

That depends on the project: residential or commercial, interior only or exterior, and whether a general contractor or a homeowner acting as contractor is applying. The city sets out the required documents by project type.

What code does Marietta enforce?

The Georgia State Minimum Standard Codes as regulated by the Department of Community Affairs, which moved to the 2024 editions with Georgia Amendments effective January 1, 2026. The energy code remains the 2015 IECC with Georgia supplements.

When is a Georgia contractor licence required?

Once the value of the work, or the contractor's compensation, exceeds two thousand five hundred dollars, tested per project rather than per invoice. Trade licences under Title 43, Chapter 14 are required regardless of job value.

Simplify Marietta permitting with Alliance Permitting

Marietta is one of the most estimable jurisdictions in Georgia — published rates, one division, one portal — and one of the most commonly misfiled, because the county that surrounds it shares its mailing address. Add a re-inspection ladder that punishes optimistic scheduling and the priorities become obvious. A permit expediter for Marietta files with the right government and arrives ready for the first inspection.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Marietta because the work is done by people who have stood at the counter:

  • Right authority — city or unincorporated Cobb, resolved from the parcel rather than the Marietta address.
  • Priced and sequenced properly — construction cost stated accurately, and inspections booked only when the work will actually pass.
  • Complete oversight — every Marietta permit, trade record, and inspection tracked across your jobs in one place.

Alliance Permitting is a permit documentation and expediting service. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Marietta sooner?

Let Alliance prepare, file, and track your Marietta permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Marietta permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.