Inside Calhoun city limits, permits are issued by the City’s Department of Building Inspection at 700 W Line St, using one application form for every permit type and the ePlan Solutions portal for plan review. Under the July 2026 fee schedule a new house is valued at $125 per square foot to set its permit fee, plan checking adds 30% of the permit fee, and inspections called in before 9:00 a.m. can be done the same day.
What requires a permit in Calhoun?
Building Inspection covers residential, commercial and industrial construction, with structural, plumbing, electrical, gas, mechanical and HVAC inspections. The single Permit Application Form lists the permits the department issues:
Building and site
- Building: new construction, additions, alterations, repairs and remodels
- Plan review
- Swimming pools
- Signs
- Demolition
- Grading, soil and erosion control, and the NPDES Notice of Intent
Trades and fire
- Electrical, including solar panels
- Plumbing
- HVAC
- Refrigeration and gas
- Fire permits for commercial and industrial buildings
- Commercial and industrial sprinkler systems
Starting work before the permit is issued doubles the permit fee. Zoning, land use, grading and soil and sedimentation questions are handled with Community Development.
Calhoun building department: who handles permitting
The Department of Building Inspection, part of Community Development, issues permits and inspects work inside the city. The City’s permit application names Joey Moore as Building Official. Gordon County handles permits for property outside the city limits.
| Detail | Information |
|---|---|
| Authority | City of Calhoun Building Inspection |
| Permit Tech | 706-602-5607; applications to pquinn@calnet-ga.net |
| Office / intake | Department of Building Inspection, 700 W Line St, Calhoun, GA 30701 |
| Building Official | Joey Moore, 706-602-5601 |
| Building Inspector | 706-602-5602 |
| Soil & erosion | 706-602-5605 |
| Plan review | ePlan Solutions portal (support@eplansolution.com) |
Short on time to read all of this?
Get a free quote →Calhoun permit application and filing
Calhoun uses one Permit Application Form for all permits: tick each permit type the job needs (building, plan review, electrical, plumbing, HVAC, refrigeration or gas, pool, sign, grading, soil and erosion, NOI, demolition) and fill in the estimated cost, map and parcel number, zoning district and Georgia contractor licence number. The form asks for construction type, floor area, service amps, plumbing fixtures and HVAC tonnage.
Every application must include copies of the contractor’s current licence, driver’s licence and current Georgia business licence. Applications can be emailed, mailed or brought to 700 W Line St, and all plans go through ePlan Solutions for review. By signing, the applicant agrees to repair any sidewalk or street damaged during the work, to clear trash and debris at the end of the job, and to keep a portable restroom and construction dumpster on site.
Permit costs and fees in Calhoun
Fees come from the City’s Fee Schedule Resolution, effective July 1, 2026. The City sets the valuation itself: residential construction at $125 per square foot (unfinished basements $31), and commercial or industrial new construction and remodels at $200 per square foot.
| Project | Fee |
|---|---|
| Single-family, valuation $1,000 or less | No fee; $20 per inspection if one is needed |
| Single-family, $2,001–$15,000 | $35 for the first $2,000 plus $6 per additional $1,000 |
| Single-family, $15,001–$50,000 | $110 plus $5 per additional $1,000 |
| Single-family, $50,001–$100,000 | $260 plus $4 per additional $1,000 |
| Single-family, over $100,000 | $425 plus $4 per additional $1,000 |
| Commercial, industrial and signs, $1,001–$50,000 | $55 for the first $1,000 plus $7 per additional $1,000 |
| Commercial, $100,001–$500,000 | $600 plus $4 per additional $1,000 |
| Plan checking (work over $1,000 needing plans) | 30% of the building permit fee, paid with the plans |
| Swimming pool | $350 residential, $450 commercial |
| Re-inspection | $35, then $45, then $55 for the same item |
| Work started without a permit | Permit fees doubled |
Not sure this scope needs a permit?
Get a free quote →For example, a 2,000 sq ft house is valued at $250,000, which puts its permit fee at about $1,025, and plan checking adds 30% of that. Multi-family buildings have their own, higher bands. Site work is priced separately: residential grading starts at $110 for the first acre plus $15 per additional acre, and soil and sedimentation review starts at $125 for up to 5 acres.
Electrical, plumbing, mechanical and gas work
Trades are ticked on the same application and inspected by Building Inspection. Fees under the July 2026 schedule:
| Permit | Fee |
|---|---|
| Residential HVAC | $150 |
| Commercial and industrial HVAC | Same as the commercial building permit bands |
| Residential plumbing | $150 |
| Commercial and industrial plumbing | $200 plus $10 per fixture |
| Water heater | $35 |
| Electrical, up to 100 A service | $100 plus a $15 administrative fee |
| Electrical, each additional 100 A | $50 |
| Electrical temporary connection | $60 |
| Electrical re-inspection | $35 |
Rather talk it over?
Call 1-855-478-4290 →Commercial and industrial buildings also pay a fire permit fee of $300 up to 25,000 sq ft, or 1.5 cents per sq ft above that, and sprinkler permits are priced by valuation. Where plans must be approved by the State Fire Marshal’s office, the City needs a copy of the stamped plans before it issues the permit, and an approved set must stay on site.
Alliance handles electrical permits for contractors here. More on this: who pulls the electrical permit.
Application documents and plan review
Every application needs the Permit Application Form and copies of the contractor’s licence, driver’s licence and Georgia business licence. Plans are submitted formally through ePlan Solutions. Once ePlan approves them, and before any permit is issued, the department also wants:
Building plans
- 1 paper copy of the building plans
- 1 thumb drive with the plans
- State Fire Marshal stamped plans, where required
Civil and hydrology
- 1 paper copy of the civil site plans
- 1 bound hydrology study
- 1 thumb drive
- The Georgia Soil and Water Conservation Commission approval checklist for the erosion control plan
Since February 8, 2023, erosion and sediment control plans have been reviewed by the Georgia Soil and Water Conservation Commission’s Athens office, not by the City.
Rather not deal with the building department?
Get a free quote →How to apply: 6-step Calhoun process
Check the parcel and its zoning district; property outside the city is permitted by Gordon County.
Tick every permit type, add the estimated cost and contractor licence number, and attach the three licence copies.
Upload the building and civil plans for review; send erosion control plans to the state commission.
Email it to the Permit Tech, mail it or bring it to 700 W Line St, and pay the 30% plan-checking fee with the plans.
After ePlan approval, bring the paper plans and thumb drives, then pay the permit fees.
Call before 9:00 a.m. for a same-day inspection and pass footing, foundation, rough-in and final.
Calhoun inspections
The application lists four mandatory inspections: footings, foundation, rough-in and final. Inspections called in before 9:00 a.m. can be done the same day. Keep the stamped, approved plan set on site: the fee schedule sets a $500 administrative fee for each time it is missing.
A repeat visit for the same item costs $35, then $45, then $55. Occupying a building before the Certificate of Occupancy is issued carries a $500 administrative fee for a home and $1,000 for a commercial building.
Local Calhoun details that matter
Erosion control enforcement: the City’s fee schedule lists administrative fees for site violations, from $350 for a first silt fence violation to $500 for mud on the road, and stop work orders cost $1,000 for the first, $1,500 for the second and $2,500 after that.
Site housekeeping: every site must have a portable restroom and a construction dumpster, and building materials or dumpsters in the roadway are fined $350 per violation.
Zoning fees: a variance costs $150, a zoning change $125 and a zoning verification letter $25.
Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Want this handled start to finish?
Get a free quote →Calhoun permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Georgia DCA current state minimum codes
- Calhoun Permit Application Form (all permits)
- Calhoun Building Inspection Department
- Calhoun Fee Schedule Resolution (effective July 1, 2026)
- Calhoun checklist for plan submittals
- Calhoun Fire Permit Application
Calhoun permit FAQs
Who issues building permits in Calhoun?
The City of Calhoun Department of Building Inspection, part of Community Development, at 700 W Line St. Joey Moore is named as Building Official on the City’s application.
How much is a building permit for a new house in Calhoun?
The City values the house at $125 per sq ft and applies its fee bands: over $100,000 of value the fee is $425 plus $4 per additional $1,000. Plan checking adds 30%.
Inspections are where schedules slip.
Get a free quote →How do I submit plans?
All plans go through ePlan Solutions; after approval the department wants one paper set and a thumb drive before it issues the permit.
What contractor documents does Calhoun require?
Copies of the current contractor’s licence, the contractor’s driver’s licence and the current Georgia business licence.
Can I get a same-day inspection?
Yes, if you call it in before 9:00 a.m.
How much is a pool permit?
$350 for a residential pool and $450 for a commercial pool.
What if I start work without a permit?
The permit fees are doubled, and the City can also charge administrative fees and issue a stop work order.
Simplify Calhoun permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Calhoun sooner?
Let Alliance prepare, file, and track your Calhoun permits while your crew stays on the job.
More Georgia permitting guides
Gordon County
Read guide →Whitfield County
Read guide →Bartow County
Read guide →Camden County Building Permit Guide
Read guide →Candler County Building Permit Guide
Read guide →Canton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Calhoun permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.