In Bloomfield the Building Division of the Department of Building and Land Use issues every building permit and the separate electrical, plumbing, heating and cooling, sprinkler and solar permits. Applications are filed through the town’s OpenGov portal, the fee is $17 for each $1,000 of construction value with a $60 minimum, and the division says most permits issue within ten days of a plan being submitted, while asking applicants to allow at least 30 days for review.
Bloomfield is a town of about 22,300 people (Census estimate for 2025) on the north-west edge of Hartford, and one building office covers all of it. The division works from Town Hall at 800 Bloomfield Avenue under Chief Building Official Dwight Carlson, with three full-time assistant building officials and one part-time assistant who carry out the building, electrical, plumbing and mechanical inspections and the plan reviews.
Neighboring Hartford, West Hartford, Windsor and Simsbury issue their own permits.
No inspections by phone. Since Monday, March 31, 2025 the Building Division has taken inspection requests only through the OpenGov portal, at least 48 hours ahead, in morning and afternoon windows from Monday to Thursday and a morning window on Friday.
What requires a building permit in Bloomfield?
The division’s own process page says most building projects need approvals from several agencies, and that a building application is joined by a separate trade application for any electrical, plumbing, heating, cooling or sprinkler work. Any project that goes beyond interior work also needs a certified plot plan for a house or a site plan for a commercial property.
Permit needed
- New houses, additions, garages and porches, with a certified plot plan
- Decks, described on the division’s deck framing questionnaire
- Re-roofing and re-siding beyond 25% of the roof or siding in a calendar year
- Solar photovoltaic systems, on their own photovoltaic permit
- Generators, with the division’s generator sheet
- Complete demolition of a building (not interior demolition)
- Sprinkler, fire suppression and fire alarm systems
No building permit (one- and two-family homes)
- One-story detached sheds and playhouses of 200 sq ft or less
- Fences not over 7 feet high; pool barriers always need a permit
- Retaining walls 3 feet or less that hold back no surcharge
- Sidewalks, driveways and on-grade patios not more than 30 inches above adjacent grade and not over any basement or story below
- Detached decks of 200 sq ft or less, no more than 30 inches above grade, that do not serve the required exit door
- Painting, papering, tiling, flooring, cabinets and countertops
The commercial version of the exempt list in the portal is narrower: there a fence is exempt only up to 6 feet. A zoning approval can still be needed where no building permit is: the Planning and Zoning Department’s administrative zoning permit covers accessory structures, fences in some zones, pools, signs, retaining walls and outside mechanical equipment.
Short on time to read all of this?
Get a free quote →What the town decides and what the state holds
Bloomfield sets its own fees and penalties, its online-only inspection booking, its zoning, wetlands and floodplain rules, and a town ordinance that bars homes from installing or replacing underground fuel tanks of any type. The building code itself is the 2022 Connecticut State Building Code, applied to applications filed since October 1, 2022; the delayed 2026 edition will apply only to applications filed after it takes effect.
Connecticut has one State Building Code: the code itself sets which work needs a permit and which is exempt, every town’s building official is licensed by the State Building Inspector, and there is no county government. Connecticut rules
Bloomfield building department: who handles permitting
The Building Division reviews plans and issues building, trade, photovoltaic, demolition and fire-protection permits, inspects the work and issues the certificate of use and occupancy. The Planning and Zoning Department, in the same Department of Building and Land Use, issues zoning sign-offs and processes applications for the Town Plan and Zoning Commission, the Inland Wetlands and Watercourses Commission and the Zoning Board of Appeals. Two bodies that are not part of town government also sign off: the West Hartford-Bloomfield Health District for septic systems and wells, and the fire marshal of the fire district the property sits in.
| Detail | Information |
|---|---|
| Building Division | Town Hall, 800 Bloomfield Avenue, Bloomfield, CT 06002; 860-769-3516 |
| Counter hours | Weekdays 8:30 to 9:30 a.m. and Monday to Thursday 4 to 5 p.m.; the Building Official is in from 9 to 10 a.m. on weekdays for consultation |
| Town Hall hours | Monday, Wednesday and Thursday 8:30 a.m. to 5 p.m.; Tuesday 8:30 a.m. to 6 p.m.; Friday 8:30 a.m. to 12:30 p.m. |
| Portal | OpenGov: building, trade, solar, demolition and fire-protection permits, zoning reviews and right-of-way permits |
| Land Use Office | Planning, zoning and wetlands, 860-769-3515 |
| Health district | West Hartford-Bloomfield Health District, 580 Cottage Grove Road, Suite 100; 860-561-7900 |
Permit types
Residential permits
The new house and addition checklist lists what a complete file holds: a certified plot plan; zoning, wetlands and engineering approvals; the health district’s sign-off on the septic design and well location where they apply; Metropolitan District Commission approval for public water or sewer; the application form and a legible set of plans; engineering details for floors, headers and trusses; the contractor’s new home construction or home improvement registration certificate and workers’ compensation form (neither is needed on a homeowner permit); energy code compliance; and a driveway excavation permit from the town or the state. Deck applications answer the division’s framing questionnaire, and generators follow its generator sheet.
Not sure this scope needs a permit?
Get a free quote →Solar is its own record type. A house needs a site and system plan and an engineer’s stamped letter on the existing roof framing and roof loads, and an electrical permit is added only when the panel has to be upgraded. The division aims to review complete residential solar files in one to two weeks, and a residential system needs one inspection.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
For commercial and multifamily work the division’s guidelines put every planning, zoning and inland wetlands approval ahead of the building application, and they also list a state traffic certificate under section 14-311 of the General Statutes. Plans and specifications come in three sealed sets, one of which goes to the fire district’s fire marshal and one to the health district where it has a role, and each set carries a code analysis. Structural plans must be complete before the building permit issues; a foundation-only permit is a rare exception for large projects. Sprinkler, suppression and fire alarm systems each have their own permit in the portal, with alarm shop drawings separate from the electrical drawings.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
The division will not issue a permit that needs zoning approval under section 8-3 of the General Statutes until zoning has signed off, and the same holds for fire marshal, wetlands commission and health district approvals. A zoning signoff application calls for a Class A-2 boundary survey and an erosion and sediment control plan (the zoning enforcement officer can reduce the list), and a signoff lapses if work has not started within six months. Work in the special flood hazard area takes a floodplain management development permit through the Plan and Zoning Commission, with an engineer’s certificate. Wetlands applications follow the regulations the commission adopted in 2023.
Bloomfield permit costs and fees
The division’s fee schedule, revised in April 2025, uses one rate for every permit: $17 for each $1,000 of construction value, labor and material together. The sheet splits that rate into $16.74 for the Building Division and 26 cents for the state education fee, so the state fee is already inside the $17. No permit costs less than $60, which covers any job up to about $3,500.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee or rule |
|---|---|
| Building, trade, solar and other permits | $17 per $1,000 of construction value: $16.74 town fee plus $0.26 state education fee |
| Minimum permit fee | $60, regardless of value |
| Work started without a permit (Town Ordinance 6.6) | Investigation fee of $250 or the permit fee, whichever is greater |
| Reinspection (Town Ordinance 6.7) | $50 |
| Occupying without a certificate (Town Ordinance 6.8) | $250 |
| Zoning review not tied to a building permit | $50 residential, $150 commercial |
| Right-of-way permit; contractor license (Engineering) | $50 with excavation, $25 without; contractor license $20 a calendar year |
Worked example. A $20,000 remodel pays $20 × $17 = $340, of which $334.80 is the town’s fee and $5.20 the state education fee. Electrical or plumbing work on the same job is charged on its own trade permit at the same rate.
Trade permits and who may pull them
Electrical, plumbing (water, drain, waste, vent and gas piping), HVAC (heating, cooling, gas piping and propane tanks), photovoltaic and fire-protection permits are separate OpenGov record types. Contractors attach a valid Connecticut license and proof of workers’ compensation, either a certificate or a state waiver; the division posts the 7A, 7B and 7C waiver forms and directions on its Forms page. A homeowner taking a permit on their own house skips the contractor registration and workers’ compensation items on the new-house checklist.
Bloomfield rules
- Each trade is a separate application with its own fee
- No new or replacement underground fuel tanks at homes (town ordinance)
- Fire alarm shop drawings are filed apart from electrical drawings
- Demolition contractors hold a Class A license for buildings over 2½ stories or 35 feet, Class B for smaller ones
Exempt trade work
- Lamp and fuse replacement and plugging in portable equipment
- Portable heaters, fans and cooling units
- Stopping leaks and clearing stoppages without replacing piping
- Minor parts that do not change an appliance’s approval
The Department of Consumer Protection licenses electricians, plumbers and heating contractors and registers home improvement and new home construction contractors; its license lookup is the place to confirm a contractor before signing.
Rather not deal with the building department?
Get a free quote →How to apply for a Bloomfield building permit
Stop by the counter in the morning window or call 860-769-3516; multifamily and commercial projects need an appointment. Ask the Land Use Office whether the work needs zoning, wetlands or floodplain approval.
Obtain the zoning signoff, any wetlands permit, the health district’s septic or well sign-off and any MDC water or sewer approval, because the division will not issue the permit before them.
Choose the building permit and one record per trade, enter the construction value, and upload plans, the plot or site plan, and the contractor’s license and workers’ compensation proof.
The Building Official reviews the plans and consults with the applicant; corrections and revisions come back through the portal.
The fee is $17 per $1,000 with a $60 minimum. The permit arrives with its list of required inspections.
Request each inspection in the portal at least 48 hours ahead and finish with the final inspection for the certificate of use and occupancy.
OpenGov is the route the town prefers, but state law (section 29-263 of the General Statutes) lets an applicant file in person, by post or by email in the way the building official sets, so call the division if the portal does not work for you.
Review, corrections and what causes delay
The division says most permits issue within ten days of the plan being submitted, larger projects take longer, and it asks applicants to allow at least 30 days for the review of an application and any revisions; state law gives the building official 30 days from the date of the application to issue or refuse a permit. The usual hold-ups are a missing zoning, wetlands, fire marshal or health district approval, a plot plan that is not certified, missing structural details on house plans and commercial drawings without a code analysis.
Inspections in Bloomfield
Inspections are requested only in the OpenGov portal: under My Account and Inspections, choose the permit, the inspection type and a time window, and the division confirms the request. Requests need at least 48 hours’ notice. The windows are 9:30 to 11:30 a.m. and 2 to 4 p.m. from Monday to Thursday, and 9:30 to 11:30 a.m. on Friday.
For one- and two-family houses and additions the division’s list starts with erosion controls in place before site work, then footings or piers before concrete, dampproofing and footing drains, underground plumbing with its water test, any temporary electrical service and masonry fireplace throats. Rough electrical, heating and cooling, plumbing and structural work come next, followed by the electrical panel (with notice to the utility), the gas pipe test and insulation before it is covered.
The final inspection leads to the certificate of use and occupancy. The division’s certificate checklist asks for the as-built plot plan to be filed with zoning and the health district, every trade and agency final to be signed off, and house numbers at least 4 inches high that can be read from the street. The town’s reinspection fee under Town Ordinance 6.7 is $50.
Want this handled start to finish?
Get a free quote →Bloomfield permit search and official resources
Permits, plan reviews and inspection results for current work are tracked in the OpenGov portal; for older building files, call the Building Division on 860-769-3516. Bloomfield takes part in the National Flood Insurance Program, and FEMA lists new flood maps for the town taking effect on November 13, 2026; development in the special flood hazard area goes through the town’s floodplain management permit.
- Bloomfield Building Division
- Bloomfield OpenGov permit portal
- Building permit process
- Building Division counter hours, review time and inspection windows
- Permit fee schedule, revised April 2025
- Residential construction checklists and inspection list
- Commercial permit guidelines and inspections
- Work exempt from permits
- Demolition requirements checklist
- OpenGov inspection scheduling guide
- Building Division forms and workers’ compensation waivers
- Bloomfield Planning and Zoning
- Zoning signoff, floodplain and land use applications
- West Hartford-Bloomfield Health District
- FEMA Community Status Book for Connecticut
- Office of the State Building Inspector
- Connecticut Department of Consumer Protection: licenses and registrations
Inspections are where schedules slip.
Get a free quote →Bloomfield building permit FAQ
How much is a building permit in Bloomfield?
$17 for each $1,000 of construction value, labor and material included, with a $60 minimum. A $20,000 job pays $340, and the 26-cent state education fee is part of that rate.
Can I call to schedule an inspection?
No. Since March 31, 2025 inspections are requested only through the OpenGov portal, at least 48 hours ahead.
How long does a permit take?
Most projects get their permit within ten days of submitting plans, but the division asks for at least 30 days for review and revisions, and any zoning, wetlands, fire or health approval has to come first.
Do I need a permit for a shed or fence?
Not a building permit for a one-story shed of 200 sq ft or less or a fence of 7 feet or less around a house (pool barriers excepted), but zoning may still need an administrative zoning permit, which costs $50 for a home.
Can I replace my underground oil tank?
Not at a home. A town ordinance noted on the HVAC and plumbing permit types bars residential properties from installing or replacing underground fuel tanks of any type.
Who approves septic systems in Bloomfield?
The West Hartford-Bloomfield Health District, a separate regional body at 580 Cottage Grove Road, which reviews septic system plans and signs off on well locations.
What does work without a permit cost?
An investigation fee of $250 or the amount of the permit fee, whichever is greater, under Town Ordinance 6.6, on top of the permit itself.
Simplify Bloomfield permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Connecticut. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bloomfield sooner?
Let Alliance prepare, file, and track your Bloomfield permits while your crew stays on the job.
More Connecticut permitting guides
Hartford County
Read guide →Avon
Read guide →Berlin
Read guide →Branford Building Permit Guide
Read guide →Bridgeport Building Permit Guide
Read guide →Bristol Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bloomfield permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.