Inside town limits, the Town of Windsor Building Division reviews plans, issues building permits and inspects construction; Permit Sonoma handles only unincorporated Sonoma County. Applications are filed electronically in eTRAKiT, the counter at Town Hall is open Monday through Thursday from 8 to 11 a.m. or by appointment (707-836-2304), and residential plan checks are promised within 15 working days of a complete submittal. Under the 2026-27 Master Fee Schedule the building permit fee follows a valuation table, plan check adds 65% of it, and a reinspection costs $229.
What requires a building permit in Windsor?
The Building Division enforces the state building code and Title VII of the Windsor Municipal Code, and its own advice for unclear cases is to call and talk the project through with the code official before work starts. The fee schedule and permit forms show the work the town routinely permits: new buildings, additions and remodels; foundations on their own; demolition; electrical, plumbing and mechanical work down to a water heater, furnace, air conditioner or heat pump change-out; electric vehicle chargers; rooftop solar and battery storage; and pools and spas. Any job that disturbs soil, even under an acre, must include an erosion and sediment control plan, and qualifying projects add a construction waste management plan.
Permit required
- New homes, accessory dwelling units, additions and remodels
- Commercial buildings and tenant improvements
- Demolition and foundation-only permits
- Electrical service upgrades, EV chargers, water heaters, furnaces, air conditioners and heat pumps
- Residential solar and energy storage systems
- Pools and private spas
- Any work in the public right-of-way (Engineering encroachment permit)
Ask first
- Small sheds, fences and minor repairs: the town publishes no local exemption list of its own, so call the Building Division before relying on the state exemptions
- Tree removal, home occupations and temporary uses: these are Planning permits, filed in eTRAKiT
Work without a permit is charged twice the building permit table fee, a rule the schedule ties to section 109.4 of the building code and Municipal Code section 13-1-325. Construction hours are 7 a.m. to 7 p.m. on weekdays and 8 a.m. to 7 p.m. on Saturdays, with no work on Sundays unless the Building Official expressly allows it.
What Windsor decides and what the state holds
Windsor’s choices sit in its adopting ordinance, its fee schedule and its zoning code: the town requires fire sprinklers in more buildings than the base code, treats all residential construction as subject to wildfire-resistant construction rules, and sets its own permit, impact and planning fees. Contractor licensing and the base code text are statewide.
Windsor building department: who handles permitting
The Town of Windsor Building Division, part of Community Development, issues building, electrical, plumbing and mechanical permits within town limits. Planning handles zoning, design review, use permits, ADU questions and tree removal; Engineering issues encroachment permits for the public right-of-way. Fire code review belongs to the Sonoma County Fire District’s Fire Prevention Division, which Ordinance 2025-402 names as Windsor’s fire code official. Land outside town limits is permitted by Permit Sonoma.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building Division | 9291 Old Redwood Highway, Suite 400, Windsor, CA 95492; mailing address PO Box 100, Windsor, CA 95492-0100 |
| Phone, fax and email | 707-836-2304; fax 707-838-7349; buildingpermits@townofwindsor.ca.gov |
| Building counter | Monday to Thursday, 8 to 11 a.m., or by appointment; Town Hall is open Monday to Thursday, 7 a.m. to 6 p.m. |
| Inspection scheduling | Text 877-813-1904 (SelecTXT) or schedule in eTRAKiT; cancellations by phone at 707-522-8346 |
| Planning Division | 707-838-1021; ADU Planner 707-838-5337, adu@townofwindsor.ca.gov |
| Fire code official | Sonoma County Fire District, Fire Prevention Division |
| Online portal | Windsor eTRAKiT |
Windsor permit types
All building permits are applied for online in eTRAKiT. The Permit Center page carries the forms that go with an application: the building permit application, a property owner authorization form for agents, the owner-builder and licensed contractor declarations, a smoke alarm and carbon monoxide detector affidavit, a special inspection form, the EV permitting checklist, the erosion and sediment control plan and the construction waste management plan.
Residential permits
- New homes and additions: every new one- and two-family dwelling must have an automatic fire sprinkler system regardless of size, and residential construction must meet the Wildland-Urban Interface Code under Windsor’s amendment to the residential code.
- Accessory dwelling units: the town allows an ADU and a junior ADU on residential lots as state law permits. Its page lists typical standards of 4-foot side and rear setbacks, a 16-foot height limit, 500 square feet for a junior ADU, 800 square feet for a studio or one-bedroom unit and up to 1,200 square feet for two or more bedrooms; ADUs may not be used as short-term rentals. An ADU rebate program runs through March 31, 2028 or until funds run out.
- Solar and storage: contractors can use the Symbium platform, which checks residential solar and battery systems for code compliance, collects a service fee and returns the applicant to eTRAKiT for instant issuance. Applications sent by email or in person instead go through plan review of 1 to 3 business days.
- Equipment change-outs: water heaters, furnaces, air conditioners, heat pumps and service upgrades each carry a flat permit fee in the schedule.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects follow the same eTRAKiT path with a 20-working-day target for plan check. The local sprinkler amendments matter most here: Groups A, B, F, M and S need sprinklers where the fire area or floor area exceeds 3,000 square feet, repair garages and buildings with high-piled storage need them throughout, and existing buildings must be sprinklered after a substantial improvement, an addition beyond the ordinance’s allowable increase or a remodel of more than 75% of the original floor area. Fire permits and fire plan review follow the Sonoma County Fire District’s adopted fee schedule, not the town’s.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning and design review: small project design review costs $500 and administrative design review $1,854; minor use permits are $1,854, conditional use permits $5,644 and major variances $5,645. Zoning permits run $250, or $627 where posting is required.
- Encroachment: any work in the public right-of-way needs an Engineering encroachment permit with three sets of plans, insurance endorsements, an engineer’s estimate and a bond of 100% of the work (minimum $3,000, or $10,000 with trenching). A Cal/OSHA permit is needed only for excavation deeper than 5 feet, and fees are paid by check.
- Fire hazard zones: Ordinance 2025-395, adopted June 4, 2025, adopted the town’s Fire Hazard Severity Zone maps into Title VII.
Windsor building permit fees
Building fees come from the town’s Master Fee Schedule for 2026-27, updated July 1, 2026 and posted on the Finance fees page (the Building Division’s own fees page still links the 2025-26 version). Permit fees are based on total project valuation plus the mechanical, electrical and plumbing items, and plan check is charged on top.
| Project valuation | Fee |
|---|---|
| $1 to $500 | $40 |
| $501 to $2,000 | $40 for the first $500, plus $5 per additional $100 |
| $2,001 to $25,000 | $117 for the first $2,000, plus $24 per additional $1,000 |
| $25,001 to $50,000 | $663 for the first $25,000, plus $17 per additional $1,000 |
| $50,001 to $100,000 | $1,089 for the first $50,000, plus $12 per additional $1,000 |
| $100,001 to $500,000 | $1,681 for the first $100,000, plus $10 per additional $1,000 |
| $500,001 to $1,000,000 | $5,469 for the first $500,000, plus $8 per additional $1,000 |
| Over $1,000,000 | $9,486 for the first $1,000,000, plus $6 per additional $1,000 |
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Building plan check | 65% of the building permit table fee |
| Accessibility plan check | 0.204 times the building permit table fee (residential); 0.153 times (non-residential) |
| Site review | $79 per application |
| Solar permit, residential or business | $230 per installation |
| Miscellaneous permit | $101 |
| Demolition / foundation only | $761 / $846 |
| Water heater, furnace replacement, air conditioner, electrical service upgrade | $101 each; heat pump $102 |
| EV charging station | $75 per aggregated charging area |
| Pool / private spa | $663 / $51 |
| Reinspection | $229 |
| Inspection outside business hours | $343 |
| Temporary certificate of occupancy / point-of-sale code inspection | $342 each |
| One-year permit extension | $229 |
| Expired permit renewal | 80% of the building permit table fee |
| Work without a permit | 2 times the building permit table fee |
| Building staff time not listed elsewhere | $229 an hour |
Worked example: a project valued at $200,000 falls in the $100,001 to $500,000 band: $1,681 for the first $100,000 plus 100 additional thousands at $10, a $2,681 permit fee. Plan check at 65% adds $1,742.65, for $4,423.65 before any accessibility plan check, trade items, state surcharges such as the strong-motion fee ($13 per $100,000 of valuation for one- to three-story homes) and impact fees.
Impact fees effective July 1, 2026 are much larger for a new house: a standard single-family home pays $5,024 for water capacity, $12,184 for water reclamation capacity, $13,796 traffic, $4,022 drainage, $13,829 parks, $1,785 public facilities, $774 recreation, $255 trails, $130 police, $5 open space and $1.98 per square foot for fire facilities. ADUs pay nothing for water, reclamation, traffic, parks or public facilities, and fire facilities fees apply only to ADUs over 750 square feet. A pilot program reduces impact fees for smaller units in multifamily projects until October 2027.
Trade permits and who may pull them in Windsor
Electrical, plumbing and mechanical permits come from the Building Division through eTRAKiT. The schedule prices them as a $40 issuance fee plus per-item or per-square-foot charges, with flat fees for the common change-outs, and private spa, pool electrical and gas outlet items listed separately. Applicants sign either the town’s licensed contractor declaration or its owner-builder declaration, and an agent filing for an owner attaches the property owner authorization form.
Every contractor working in Windsor must hold an active town business license before a permit is issued. The license is applied for, renewed and paid online through the town’s HdL portal; a new license is $71 and an annual renewal $26, both including the $4 state CASp fee. Contractors must also hold the state license for their trade.
Rather not deal with the building department?
Get a free quote →How to apply for a Windsor building permit
Call Planning at 707-838-1021, or the ADU Planner at 707-838-5337, about design review, use permits, setbacks or tree removal before drawing plans.
Create an account or sign in with the login you use for Planning. Questions about access go to buildingpermits@townofwindsor.ca.gov.
Plans plus the building permit application, the licensed contractor or owner-builder declaration, the erosion control plan and any special inspection, smoke alarm, EV or waste management form the job needs.
Upload everything in eTRAKiT; solar and battery contractors can go through Symbium first for instant review.
Respond to plan check comments, clear Planning, Engineering and fire requirements, and pay permit, plan check and impact fees.
Text 877-813-1904 or use eTRAKiT for each inspection through the building final.
Review, corrections and what causes delay
The town promises residential plan checks within 15 working days and non-residential plan checks within 20 working days, counted from receipt of a complete set of construction plans, so the clock starts only once the set is complete. Revisions after approval carry their own fee, renewing an expired permit costs 80% of the table fee, and a one-year extension costs $229. Projects that need design review, an encroachment permit or a fire district permit move only as fast as the slowest of those approvals.
Windsor building inspections
Inspections are performed Monday through Thursday between 8:30 a.m. and 4:30 p.m., and the permit holder is responsible for requesting each one. Schedule in eTRAKiT or by texting SCHEDULE to 877-813-1904; the SelecTXT line also takes RESCHEDULE and RESULTS commands and an express format of permit number, inspection code, date and morning or afternoon. Cancellations can be made by calling 707-522-8346. The town’s rule of thumb is that anything about to be covered up needs an inspection first.
| Inspection | Code |
|---|---|
| Pre-construction meeting | 100 |
| Forms and footings / foundation | 202 / 205 |
| Underfloor framing, mechanical, electrical, plumbing | 300 to 303 |
| Rough framing, mechanical, electrical, plumbing | 400 to 403 |
| Insulation / close-in | 407 / 408 |
| Building final / temporary occupancy / planning final | 800 / 801 / 808 |
A failed inspection that needs a return visit costs $229, and an inspection outside business hours $343. A temporary certificate of occupancy is $342 per application.
Want this handled start to finish?
Get a free quote →California building code in Windsor
The Town Council adopted the 2025 Title 24 parts and the 2024 International Property Maintenance Code by Ordinance 2025-402 on December 3, 2025, repealing Ordinance 2022-369. Its local findings cite winter storms and fog, summer heat and wind-driven fire, nearby faults and the hilly north and northeast edges of town. The main amendments require sprinklers in all one- and two-family dwellings and in most other buildings over 3,000 square feet, apply the Wildland-Urban Interface Code to all residential construction with Windsor treated as a Moderate Fire Hazard Severity Zone unless the state maps show a higher zone, delete residential code section R902.2, and define substantial improvement as work worth 50% or more of a building’s market value. FEMA’s Community Status Book lists the Town of Windsor (community 060761) as participating in the National Flood Insurance Program, with flood maps effective July 31, 2024.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Windsor permit search and official resources
Permit status, plan review comments and inspection results are in eTRAKiT, and the Building Division posts monthly lists of permits applied for, issued and finaled, with 2026 lists through October.
- Windsor Building Division
- Windsor eTRAKiT
- Permit Center forms
- Inspections and SelecTXT codes
- Residential solar applications
- Building permits applied, issued and finaled
- Building Division FAQs
- Town fee schedules
- Master Fee Schedule 2026-27
- Development impact fees 2026-27
- Ordinance 2025-402, 2025 building and fire codes
- 2025 ordinances
- 2026 ordinances
- Accessory dwelling units
- Planning Permit Center
- Encroachment permits
- Business license
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Windsor building permit FAQs
Can I drop off paper plans in Windsor?
The Building Division accepts submittals electronically through eTRAKiT; the counter is open Monday through Thursday from 8 to 11 a.m. or by appointment for help. Solar and battery applications may still be sent by email or brought in person.
How long does plan check take?
Residential plan checks are completed within 15 working days and non-residential ones within 20 working days of a complete set of plans.
Does a new house in Windsor need fire sprinklers?
Yes. Windsor’s code requires an automatic sprinkler system throughout every one- and two-family dwelling regardless of square footage.
How do I book an inspection?
Text 877-813-1904 or schedule in eTRAKiT. Inspections run Monday through Thursday, 8:30 a.m. to 4:30 p.m.
What does a building permit cost?
It depends on valuation: a $200,000 project pays a $2,681 permit fee plus $1,742.65 plan check under the 2026-27 schedule, before trade, state and impact fees.
Do contractors need a Windsor business license?
Yes, an active town business license is required before a permit is issued; a new license is $71.
Who issues permits just outside Windsor?
Permit Sonoma, which covers unincorporated Sonoma County.
Simplify Windsor permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Windsor sooner?
Let Alliance prepare, file, and track your Windsor permits while your crew stays on the job.
More California permitting guides
Sonoma County
Read guide →Healdsburg
Read guide →Rohnert Park
Read guide →Woodland Building Permit Guide
Read guide →Yolo County Building Permit Guide
Read guide →Yorba Linda Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Windsor permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.