Skip to main content
Municipal GuideCaliforniaHuntington Park · Los Angeles County

Huntington Park, California Building Permit Guide

To get a building permit in Huntington Park, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Huntington Park’s Building & Safety Division issues building, electrical, plumbing and mechanical permits for the city and now takes plan check submittals only through its electronic plan review portal.

Authority: Huntington Park Building & Safety DivisionPhone: (323) 584-6271Hours: Mon–Thu, closed Fridays
Authority
City Building & Safety6550 Miles Avenue (modular offices)
Plan check
Electronic onlyUpload plans and the permit worksheet
Issuance fee
$100 per building permitMaster fee schedule, Jan. 1, 2026
Home sales
Presale report$495 records and inspection report

In Huntington Park, building permits are issued by the city’s Building & Safety Division in the Community Development Department, reached at (323) 584-6271 or Building@hpca.gov. City Hall services are working from modular buildings in the City Hall parking lot at 6550 Miles Avenue, entered from Zoe Avenue, Monday to Thursday. Plans are submitted electronically through the division’s plan check portal, and the master fee schedule effective January 1, 2026 adds a $100 issuance fee to each building permit.

What requires a building permit in Huntington Park?

Huntington Park says plans and permits are needed for most residential, commercial and industrial construction on private property, whether the work is new, an addition, a remodel or an alteration. Where you are unsure, the division asks you to call before starting.

Building permit

  • New structures and room additions
  • Exterior stucco, interior remodeling and structural repairs
  • Roofing and window replacements
  • Pools, spas and patio enclosures
  • Any other structural or architectural work
  • Signs, solar systems, and electric vehicle chargers with their service equipment

Trade permits

  • Electrical: installing, altering, rebuilding or repairing wiring
  • Mechanical: heating, ventilation, air conditioning, refrigeration equipment, duct work and heating appliances
  • Plumbing: piping and re-piping, new or replacement fixtures and devices, and pool equipment

Several small jobs also need a separate Planning approval, described below, even when the building permit itself is simple.

What Huntington Park decides and what the state holds

The city enforces the statewide building standards code through its own Building & Safety Division, and since January 1, 2026 plans must be drawn to the 2025 edition; the last day for new submittals under the 2022 edition was December 31, 2025. The city sets its own fees, zoning, design review and its residential presale inspection program. Where its fee schedule names no fee for a plan check, permit or inspection, the Los Angeles County fee in effect at issuance applies.

Huntington Park building department: who handles permitting

The City of Huntington Park issues permits for all property inside its limits. The Building & Safety Division checks plans for new buildings, additions, tenant improvements and remodels, issues permits, inspects the work, keeps permit and plan records, and also inspects business premises when a city business license is issued. Louis Morales is the Community Development Director ((323) 584-6224).

Short on time to read all of this?

Get a free quote →
Huntington Park permit contacts
DetailInformation
Building & Safety6550 Miles Avenue, Huntington Park, CA 90255 (City Hall services in modular buildings in the City Hall parking lot, access from Zoe Avenue)
Phone / email(323) 584-6271; Building@hpca.gov
HoursMonday to Thursday; the division page gives 7:00 a.m. to 5:00 p.m. and the Community Development page gives counter hours to 5:30 p.m.; closed Fridays
Planning & Zoning(323) 584-6210, planning@hpca.gov; walk-in counter Monday to Thursday 7:00 a.m. to noon, 2:00 to 5:30 p.m. by appointment
Plan check portalBuilding & Safety Division Plan Check Portal (ePlanSoft), open 24/7; after-hours uploads are processed the next business day

Huntington Park permit types

Every application starts with the city’s Permit Worksheet: project address and parcel number, description and valuation, grading quantities, occupancy and construction type, square footage, sprinkler status, and the permit holder (licensed contractor or owner-builder) with state license and workers’ compensation details. The second page lists the electrical, mechanical and plumbing items to be priced.

Residential permits

  • Window replacements use the city’s residential window replacement form, and new window types or openings also need a Planning window approval.
  • Patio covers can follow the Los Angeles Department of Building and Safety attached patio cover standard detail the city posts.
  • Pool removals follow the city’s backfill requirements; the backfill inspection and minimum plan check are a single $500 item.
  • EV chargers follow the electric vehicle charging checklist.
  • Demolition involving asbestos follows South Coast AQMD Rule 1403, for which the city links a how-to sheet.

Commercial permits

Tenant improvements, new commercial and industrial buildings and additions go through full electronic plan check. New projects of two or more homes, public and institutional buildings, and commercial or industrial projects valued at $100,000 or more must provide public art or pay 1% of construction valuation to the city art fund; remodels of those building types valued at $50,000 or more are covered too. Building & Safety will not grant a final inspection until that fee is paid to Planning.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning approvals at $64 each. Re-roofs, fences, window changes and miscellaneous electrical, mechanical and solar work each have a Planning application: a re-roof approval needs a site plan and material color and type, a fence approval a plot plan, and a window approval photographs of the existing windows.
  • Zoning clearance. Building & Safety forwards uploaded plans to Planning for zoning clearance; projects needing discretionary review (development permits, conditional use permits, variances) should start with Planning before plan check.
  • Agency referrals. The permit worksheet warns that fire, health and other agency approvals on the referral form must be obtained before issuance, and plan check fees are forfeited if they cannot be.
  • Public Works. Work in the street needs an encroachment permit; a temporary encroachment permit is $193 and a residential driveway approach $312.

Huntington Park permit fees

Fees come from the city’s Master Fee Schedule for fiscal year 2025/2026, effective January 1, 2026; the published schedule labels its figures as adopted but prints no resolution number. Building plan check and permit fees are read from a valuation table with separate columns depending on whether the work triggers energy, disabled access and green building rules, plus a $100 issuance fee per building permit. The mechanical, grading and solar pages of the same schedule list a $60 issuance fee instead, so ask the counter which applies to a stand-alone trade permit.

Selected Huntington Park building fees, effective January 1, 2026
ItemFee
Building permit issuance$100 per permit ($60 on the mechanical, grading and solar pages)
$10,000 valuation, no energy or access workPlan check $373.85; permit $460.95
$20,000 valuation, no energy or access workPlan check $625.20; permit $777.77
$20,000 valuation with energy work onlyPlan check $687.72; permit $855.55
House solar with inverter, 10 kW or less$654.30 in total (electrical $340, building $314.30)
Mechanical / plumbing / electrical plan check50% / 40% / 70% of the trade permit fee
Demolition permit$293
Re-inspection / late inspection cancellation$290 / $162
Certificate of completed construction$209 (temporary $315)
Work without a permitInvestigation fee equal to the permit fee, at least $698 ($558 for owner-builders of one- or two-family homes, with Building Official approval)
Construction and demolition3% of project valuation
Address assignment or change$112

Rather talk it over?

Call 1-855-478-4290 →

Planning fees in the same schedule include $64 for a miscellaneous review such as a fence or solar approval, $1,010 for a preliminary plan review, $1,200 for a minor development permit and $11,049 for a major development permit. A zoning letter is $120. For work the schedule does not list, Los Angeles County’s fee at the time of issuance is charged.

Trade permits and who may pull them in Huntington Park

Electrical, mechanical and plumbing work is priced item by item on the back of the Permit Worksheet: branch circuits, outlets and fixtures, service panels, furnaces and condensers by BTU rating, water heaters, plumbing fixtures and backflow devices. Sample unit fees: $50 for each plumbing fixture or trap and for each water heater and vent, $101 for a house sewer connection to the public sewer, $93 each for the first 10 new 120-volt branch circuits, $54 for each fixed residential appliance, $150 for a service or panel under 400 amperes, $47 for an evaporative cooler and $28 for each air handler up to 2,000 CFM (first 10 units).

  • Who may apply: the division quotes the state rule that only licensed contractors, or owners who qualify for the owner-builder exemption, may pull a permit for regulated work. Contractors file the Licensed Contractor Declaration Form, and owners file the Owner-Builder Declaration, Workers’ Compensation Declaration and Authorization of Entry before an owner-builder permit is issued.
  • Workers on owner jobs: the city reminds owner-builders that relatives and others working on the project must be covered by workers’ compensation even if unpaid, unless they are the owner or immediate family living on the property.
  • Business license: Planning applications ask contractors for their city business license number; a new business license application costs $335 to process and a renewal $155.

Rather not deal with the building department?

Get a free quote →

How to apply for a Huntington Park building permit

1. Check zoning and Planning needs

Call Planning at (323) 584-6210 first if the project needs discretionary review, a re-roof, fence or window approval.

2. Complete the Permit Worksheet

Fill in every field in ink or in the fillable PDF, including valuation, permit holder and trade items.

3. Upload to the plan check portal

Submit the plans and worksheet through the Building & Safety Division Plan Check Portal; uploads are accepted around the clock.

4. Pay the plan check invoice

The permit counter processes the application and sends the invoice through the portal; pay in person at City Hall.

5. Upload the receipt and processed application

Review starts only when both are in the portal and the project shows as Accepted.

6. Clear corrections and agency approvals

Answer each correction list and obtain the approvals on the agency referral form; the counter contacts you when the permit is ready.

Review, corrections and what causes delay

The division has moved fully to electronic submittals and tracks each project’s status on the portal dashboard. A resubmittal must include the processed application and fee receipt, the latest plans, any supporting documents and responses to the last correction list; projects started before May 26, 2026 are resubmitted the same way. Unpaid plan check fees, missing receipts and outstanding agency approvals are the hold-ups the city names, and a plan check stays valid for one year, after which renewal fees may apply.

Inspections in Huntington Park

Huntington Park’s Building & Safety pages publish no separate inspection request line; the division’s listed contacts are (323) 584-6271 and Building@hpca.gov, Monday to Thursday.

A re-inspection costs $290. Cancelling when the inspector is already on site without notice costs $162, as does asking for the same inspection more than twice without fixing the corrections. When the work is finished the city issues a certificate of completed construction ($209), or a temporary certificate ($315, extensions $100).

Huntington Park also inspects homes before sale. Its Residential Pre-Sale Inspection Program (Municipal Code Title 8, Chapter 17.10) requires a presale records and inspection report for one- to four-unit properties; the application costs $495 ($315 exterior and $180 interior), the owner or agent must attend, and remedial work found during the inspection is followed up through the normal permit inspection process.

California building code in Huntington Park

Huntington Park enforces the 2025 California Building Standards Code, all thirteen parts from the Administrative Code to the Referenced Standards Code, for submittals made on or after January 1, 2026, and projects submitted earlier may continue under the 2022 code as long as their plan check has not expired. FEMA’s Community Status Book lists Huntington Park (community 060126) as participating in the National Flood Insurance Program, with no special flood hazard area mapped in the city.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Huntington Park building permit FAQ

Where is the Huntington Park building department?

At City Hall, 6550 Miles Avenue. City Hall services are temporarily in modular buildings in the City Hall parking lot, entered from Zoe Avenue, Monday to Thursday; the office is closed on Fridays.

Can I submit plans on paper?

No. The division has moved to electronic plan submittals: upload the plans and Permit Worksheet to the plan check portal, then pay the invoice in person at City Hall.

Do I need a permit to replace my roof or windows?

Yes. Roofing and window replacements are on the city’s permit list, and each also needs a $64 Planning approval for materials, color or window type.

How much does a building permit cost?

For a $20,000 job with no energy or access work, the valuation table gives $625.20 for plan check and $777.77 for the permit, plus the $100 building permit issuance fee.

Can a homeowner pull a permit?

Yes, as an owner-builder. The owner signs the Owner-Builder Declaration, Workers’ Compensation Declaration and Authorization of Entry, and takes responsibility for the work and for anyone hired.

Do I need an inspection before selling my house?

Yes, for one- to four-unit residential property. The city’s presale records and inspection report costs $495 and is required under Municipal Code Title 8, Chapter 17.10.

Huntington Park permit search and official resources

Huntington Park keeps the records of plans and permits for work on private property and reports permitted work to county and state agencies. For the permit history of a specific address, ask the Building & Safety Division at (323) 584-6271 or Building@hpca.gov; a presale report also summarizes a property’s permit records before a sale.

Inspections are where schedules slip.

Get a free quote →

Simplify Huntington Park permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Huntington Park sooner?

Let Alliance prepare, file, and track your Huntington Park permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Huntington Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.