In Blythe, building permits come from the City’s Building Division, part of the Development Services Department at City Hall, 235 North Broadway (760-922-6130). Applications are made at the Development Services counter with paper plan sets, the plan check fee is paid when plans are submitted, and the City says plan check takes 10 to 15 business days. Inspections are booked by phone, and Blythe issues no temporary certificates of occupancy.
What requires a building permit in Blythe?
The City’s answer is broad: if you are making modifications or alterations to your home, property or business, you need a building permit. The Building Division enforces the codes for new construction, additions, remodeling and interior renovation of homes, commercial buildings and industrial property. Its permit application covers building, electrical, plumbing and mechanical work, and lists new work, additions, alterations, moving or removing a building, patios, garages and tenant improvements as classes of work.
Permit needed, per City pages
- New homes, commercial and industrial buildings
- Additions, remodels and interior renovations
- Patios, garages and carports
- Moving or demolishing a building
- Water heater replacements
- Electrical, plumbing and mechanical work
- Manufactured home installations and their porches, awnings, decks and carports
- Rooftop solar and electric vehicle chargers
- Signs on private property (sign permit approval)
Exemptions
Blythe’s own web pages and handouts do not publish a list of work exempt from permits. Before skipping a permit for small work, call the Building Division at 760-922-6130 and describe the job.
What Blythe decides and what the state holds
Blythe lists the 2025 California codes as its current editions, along with three older model codes it still references: the 2006 Uniform Solar Energy Code, the 1997 Uniform Housing Code and the 1997 Uniform Code for the Abatement of Dangerous Buildings. The City runs its own zoning, project review, floodplain management and sign permits, and the Building Division also handles condemnation and demolition of unsafe structures. Contractor licensing is a state matter; the City’s role is the business license.
Blythe building department: who handles permitting
The Development Services Department is made up of the Planning, Building and Code Compliance divisions. The Building Division accepts and processes permit applications, reviews plans and inspects work for property inside Blythe’s city limits. Its Chief Building Inspector also serves as the City’s Fire Marshal. Land outside the city is under Riverside County.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Building Division | City Hall, 235 North Broadway, Blythe, CA 92225; 760-922-6130; fax 760-922-4938 |
| Permit technician, plan status and inspections | 760-922-6130, ext. 1227 (the FAQ lists 760-922-6161, ext. 1227) |
| Development Services counter | Monday to Thursday, 7:00 a.m. to noon and 1:00 to 4:00 p.m.; Friday, 7:00 a.m. to noon |
| City Hall | Monday to Friday, 7:00 a.m. to 4:00 p.m.; main line 760-922-6161 |
| Business licenses (Finance) | 760-922-6161, ext. 1221 or 1237 |
The Building page lists office hours of Monday to Friday, 7:00 a.m. to 4:00 p.m., while the City’s FAQ gives the counter’s shorter schedule above, including a noon-to-1:00 p.m. closure and a Friday closing at noon. Plan for the counter schedule when you need to file in person.
Permit types in Blythe
One City permit application is used for building, electrical, plumbing, mechanical and other permits; trade permits are filled in on the back of the same form. The applicant enters the zone, setbacks, contractor license number, class of work, building use and valuation, and both the contractor or authorized agent and the owner sign it.
Residential permits
Typical home permits are additions, remodels, patios, garages and carports, water heater changes and new houses. Each residential front yard must get two trees and ground cover. Manufactured homes are allowed on any lot zoned for a single-family house, must be at least 20 feet wide (with a 14-foot exception on certain older 25-foot lots), sit on a permanent foundation designed for that home, have at least 1-foot eaves and a conventional exterior finish, and have fire sprinklers installed before the certificate of occupancy. Porches, awnings, decks and carports for a manufactured home need their own application.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects add requirements that homes do not have: a complete landscaping plan with piping, controller and plantings, an anti-siphon device, a double check valve shown on the plans and a trash enclosure. New commercial development usually starts with the Project Review Committee described below.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Project Review Committee. The PRC is the first step for development projects. Planning sends the package to 26 agencies, including Edison, the Gas Company, the City Fire Department and Frontier; comments normally come back within two weeks, and the whole process averages four weeks. The result is a set of conditions to build into the plans before any discretionary approval or building permit submittal.
- Septic and wells. Where City water or sewer is not available, the submittal must include a Riverside County health clearance for the septic system or well.
- Public Works. The applicant must ask Public Works whether curb, gutter, sidewalk or a driveway approach is required, and how to connect to City water and sewer.
- Power. New service needs an Edison service request number (for manufactured homes, written approval from Edison).
- Grading. Where a site needs grading, the grading permit, compaction reports, pad certification and drainage plan come before the building permit.
- Floodplain. The Planning page posts the City’s floodplain management ordinance (Ordinance 827-08), its flood map panels and the countywide flood insurance study.
Blythe permit fees
Blythe does not post a general building permit fee schedule on its website, so the fee for a typical building, trade or solar permit is quoted by the Building Division (760-922-6130) once it has the application and valuation. What the City does publish:
- Plan check. The plan check fee must be paid when plans are submitted.
- School fees. The Building Division hands out a School Form after plans are submitted; it is completed with the school district, and school fees are paid to the district before the permit is issued.
- Business license changes. Moving a licensed business costs a $5 processing fee plus a Building Department inspection of the new location.
The City’s manufactured housing guidelines carry the only published dollar amounts for permits and connections. They are not dated, and the capital improvement fee cites City Resolution 01-737, so confirm them before budgeting.
| Item | Fee |
|---|---|
| Installation inspection, up to one hour | $196 |
| Second whole hour / each added 30 minutes | $82 / $41 |
| Re-inspection | $178 each |
| Capital improvement fee | $500 per home |
| Construction water fee | $50 |
| Water connection fee | $669 |
| Wastewater treatment plant fee | $1,300 |
| Water production facility expansion | $1,500 |
| Sewer connection, base rate by zone | $1,200 (West Hobsonway) to $3,400 (Riviera Drive, Colorado River 500); $9,000 Industrial Area |
| Check payable to the state Department of Housing and Community Development | $11 per unit |
Rather talk it over?
Call 1-855-478-4290 →The water, wastewater and sewer charges apply only where City services are available. The newer June 2023 manufactured home checklist says a $60 reinspection fee is charged if the setup booklet is not on site, a different figure from the guidelines’ $178 re-inspection fee; ask which applies. The guidelines add that Strong Motion Instrumentation (earthquake) fees are assessed on valuation and that grading, electrical, well and septic work are charged separately.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are issued by the Building Division on the same permit application form, with the trade details completed on the reverse. Plan sets must show electrical outlets, panels and sizes; commercial jobs need isometric drawings of water and sewer lines; and mechanical details must show equipment size in tons, vents and duct runs.
- Contractors. The application asks for the contractor’s license number. Manufactured home applicants are told to use only licensed individuals and to submit a subcontractor list.
- Business license. Blythe requires an active City business license for solar contractors using SolarAPP+, and licenses are not issued the same day. Applications go to the Finance Department in person or by mail, fees are paid by cash, check or money order only, and licenses run for the calendar year with renewal due by February 2.
- Solar. SolarAPP+ gives instant automated review for most residential roof-mounted retrofit solar systems that meet its eligibility checklist; the contractor must be on the SolarAPP+ eligibility list and pays SolarAPP+’s own processing fee, then takes the approved plans to the Development Services counter for the City permit.
- EV chargers. The City’s expedited EV charging station checklist promises a completeness review in 5 to 10 business days and a decision in 20 to 40 business days, depending on project size; permits must be picked up at Development Services.
- Owners. The application has signature lines for both the owner and the contractor or authorized agent.
Rather not deal with the building department?
Get a free quote →How to apply for a building permit in Blythe
Development projects go through the Project Review Committee first; allow about four weeks for the conditions letter.
Get Riverside County health clearance for any septic tank or well, an Edison service request number, and Public Works answers on street improvements and utility connections.
Bring three sets for most projects or four for new or major projects and anything touching City right of way or utilities, on paper at least 11 by 17 inches, drawn to scale. Professional plans need the California seal and original ink signature.
Complete the numbered spaces, including zone, setbacks, valuation and contractor license number, plus the reverse side for trade work.
File at Development Services in City Hall and pay the plan check fee at submittal. You will receive the School Form to take to the school district.
Plan check takes 10 to 15 business days. Once plans are approved and school fees are paid, collect the permit at City Hall.
Review, corrections and what causes delay
The submittal checklist marks every item as due at plan submittal, so missing pieces stop the clock. Common gaps are a plot plan that is not drawn to an engineer’s scale or leaves out setbacks, septic lines, wells, easements or property corners; missing Title 24 energy calculations (two copies); and missing truss calculations, which may be deferred. Pads raised or cut 12 inches or more need a soils compaction report. You can check plan status by calling extension 1227.
Inspections in Blythe
Inspections are scheduled by phone with the Building Department at extension 1227, or in person at the Development Services office. For a manufactured home the City lists the required inspections in order: marriage line, footings with steel in place or pier placement, bond beam before the pour, utility connections to the mains (or well and septic tank where there are no mains), and final. The setup booklet must be on site for every inspection.
Blythe does not issue temporary certificates of occupancy. A certificate of occupancy is issued only after the final inspection has been fully completed, and fire sprinklers in manufactured homes must be in before that certificate. Plan the move-in date around the final, not around rough inspections.
Building code in Blythe
Blythe lists the 2025 California codes as current, plus the older Uniform Solar Energy, Housing and Dangerous Buildings codes it still references, and runs floodplain management under Ordinance 827-08. Flood insurance: FEMA lists Blythe as a participating community in the National Flood Insurance Program; its current map entry is marked as showing no special flood hazard area.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Frequently asked questions
Does Blythe issue its own building permits?
Yes. The Building Division of the City’s Development Services Department takes applications, checks plans and inspects work inside city limits. Property outside the city is under Riverside County.
How much is a building permit in Blythe?
The City does not post a general fee schedule online, so ask the Building Division for a quote based on your valuation. The plan check fee is due at submittal, and school fees are paid to the school district before the permit is issued.
How long does plan check take?
The City says 10 to 15 business days. Call 760-922-6130, extension 1227, for status.
Do I need a permit to replace a water heater?
Yes. The City’s FAQ says a water heater replacement needs a permit; call the Building Department for details.
Can I apply online?
Not for a standard permit. Applications and paper plan sets are filed at the Development Services counter in City Hall; only eligible solar systems get automated review through SolarAPP+, and the City permit is still issued at the counter.
How do I schedule an inspection?
Call the Building Department at extension 1227 or visit the Development Services office in City Hall.
Can I place a manufactured home on my lot in Blythe?
Yes, on any lot zoned for a single-family house, if the home is at least 20 feet wide, sits on a permanent foundation designed for it, has fire sprinklers before occupancy and pays the City’s capital improvement and connection fees.
Can I get a temporary certificate of occupancy?
No. Blythe issues certificates of occupancy only after the final inspection is fully complete.
Blythe permit search and official resources
Blythe has no online permit search. For the status of plans under review, or a past permit on a property, call the Building Division at extension 1227 or ask at the Development Services counter.
Inspections are where schedules slip.
Get a free quote →- Blythe Building Division and current code editions
- Development Services Department
- Building permit application (PDF)
- Residential and commercial submittal checklist (PDF)
- City FAQs: counter hours, plan check time, inspections, business licenses
- SolarAPP+ automated solar permits
- EV charging station expedited checklist (PDF)
- Manufactured housing guidelines (PDF)
- Manufactured home submittal checklist (PDF)
- Planning and zoning, floodplain documents
- Floodplain management ordinance 827-08 (PDF)
- California Building Standards Code (Title 24)
Simplify Blythe permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Blythe sooner?
Let Alliance prepare, file, and track your Blythe permits while your crew stays on the job.
More California permitting guides
Riverside County
Read guide →Calimesa
Read guide →Canyon Lake
Read guide →Brawley Building Permit Guide
Read guide →Brea Building Permit Guide
Read guide →Brentwood Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Blythe permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.