To get a building permit in Avenal, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Avenal’s Building Division at City Hall, 919 Skyline Boulevard, issues building permits inside the city, with plan review and inspections by its contract firm, Willdan Engineering, and every application filed online.

Authority: City of Avenal Building DivisionPhone: 559-386-5766
Authority
City Building Division919 Skyline Blvd., Avenal
Apply
Online portal onlyBuilding, zoning and land division
Plan check
65% of permit feeFY 2021–22 schedule
Hours
Mon–Fri 8–4:30559-386-5766

In Avenal, the city’s Building Division, part of the Community & Economic Development Department at City Hall, 919 Skyline Boulevard (559-386-5766), issues building permits inside the city limits. The city contracts with Willdan Engineering for all building plan review, inspection and building code enforcement. All building, zoning and land division applications must be filed through the city’s online permit portal. Permit fees follow the state building code valuation tables, with plan check at 65% of the permit fee under the schedule the city posts as effective July 2021.

What requires a building permit in Avenal?

Avenal follows the state rule that no building or structure may be built, enlarged, altered, repaired, moved, improved, removed, converted or demolished without a permit from the building official, and any project with structural, mechanical, plumbing or electrical work needs one. The city’s homeowner guide lists the exceptions it applies.

Permit needed

  • New homes, room additions and major remodels
  • Patio covers, block walls and window replacements (city standard drawings available)
  • EV chargers and solar panels
  • Electrical, plumbing and mechanical work
  • Demolition and moving a building
  • Signs (Community Development approval) and new or relocated businesses (zoning permit)

No building permit (homeowner guide)

  • One-story detached sheds and playhouses up to 120 square feet
  • Wood, chain link and wrought iron fences up to 7 feet
  • Retaining walls up to 4 feet with no surcharge
  • Sidewalks and driveways
  • Painting, tiling, carpeting, cabinets and counters
  • Small above-ground pools under 24 inches deep, playground equipment and short window awnings
  • Minor electrical and plumbing repairs and portable appliances

Even when no building permit is needed, zoning rules may still apply; the guide notes that the Planning Division can regulate fence heights and locations. Building without a permit costs double the permit fee.

What Avenal decides and what the state holds

The city sets its own permit and planning fees, runs its zoning ordinance and requires a zoning permit before any development, new business or business move inside the city limits. It posts its own building regulations, Title 8 of the municipal code, whose chapters cover the adopted construction codes, antennas, unsafe buildings, the sign code, flood damage prevention, interim school facilities, landscaping, street address numbers and construction and demolition debris, along with the city’s standard specifications and drawings. Building plan review and inspection are done for the city by Willdan Engineering, and civil engineering review by A&M Engineering. Contractors are licensed by the state, and the guide says a permit may be issued only to a California licensed contractor or a homeowner.

Short on time to read all of this?

Get a free quote →

Avenal building department: who handles permitting

The Building Division reviews plans, issues permits for new construction and additions, and performs occupancy inspections for new businesses and homes. It belongs to the Community & Economic Development Department, whose director post was listed as vacant on the city’s page. Building and inspection services and building code enforcement are contracted to Willdan Engineering; engineering services are contracted to A&M Engineering. Land outside the city limits is unincorporated Kings County, served by the county Community Development Agency; see the Kings County building permit guide.

Avenal permit contacts
OfficeDetails
Building DivisionCity Hall, 919 Skyline Boulevard, Avenal, CA 93204; 559-386-5766 or 559-401-9854; fax 559-386-0629; building@cityofavenal.gov
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m.
Online permitsCity permit portal (OpenGov Citizen Services)
Zoning questionsCommunity Development, 559-386-5782
Building and inspection servicesWilldan Engineering, under contract to the city

Avenal permit types

All building, land use and zoning, and land division permits go through the city’s online portal. The building application asks for the type of work, the square footage and use of new buildings or additions, and contact details for the owner, architect or engineer, applicant and licensed contractor. Plans must include a site plan showing property lines, every structure, the street, the driveway and the proposed work; the city posts a typical site plan drawing.

Residential permits

  • New homes and major remodels. The 2023 plan requirements call for electronic plans at a scale of 1/4 inch to 1 foot, with a site plan (parcel number, north arrow, adjacent streets, setbacks to any well, private sewage system or propane tank, and easements), a foundation plan with footing, pier and slab details and hold-down hardware, and a floor plan with room uses, windows, doors, plumbing fixtures, the water heater, attic access, shear walls and any garage firewall. The set continues with floor and roof framing (or truss engineering and layout), framing sections, fireplace details, electrical and mechanical plans, at least two elevations, and state energy compliance documents with HVAC sizing calculations.
  • Smaller projects. Window changes or added outlets may need only room uses, dimensions and window sizes; a patio needs a drawing showing member sizes, spacing, connections and footings. Standard drawings cover patio covers, block walls, window replacement and EV chargers. The patio guideline sheet offers three ways to attach a patio cover (to the fascia, the top plate or the wall face) with rafter and beam span tables, and states that the patio is not to be enclosed and is not for balconies or decks.
  • Solar. Residential systems can use SolarAPP+: pay its $35 administrative fee per project, download the approval document and attach it to a building permit application in the city portal. Revisions go through SolarAPP+ first.
  • Homeowners may take out permits for their own work; the city recommends hiring a licensed contractor or tradesperson if you are not familiar with construction.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

New businesses, and businesses moving to a new location, need a zoning permit, and their buildings receive an occupancy inspection from the Building Division. Commercial signs need Community Development approval under the zoning ordinance. Commercial construction is priced on the same valuation basis as homes and goes to the contract plan reviewer.

What comes before the building permit

  • Zoning permit. Required before any development within the city limits. Each parcel sits in a zone district under the Avenal Zoning Ordinance, which sets allowed uses, minimum lot sizes, building heights and front yard depths; the city posts the ordinance and a zoning district map. Lot splits and lot line adjustments follow the Land Division Ordinance and use the land division application with an environmental information form.
  • Planning approvals. Site plan review starts at $1,295, a conditional use permit at $1,595 and a variance at $545 (full cost beyond the minimum).
  • Planning Commission. Meets on the first Monday of each month at 6:00 p.m. at the Avenal Theater & Event Center, 233 E. Kings Street.
  • School fees. Paid directly at the school district (listed as RSUSD on the city’s fee sheet), not to the city.
  • Improvement plans. Plans reviewed by the City Engineer need a $250 deposit, and engineering costs are billed to the applicant.

Avenal building permit fees

The fee schedules the city posts are for fiscal year 2021-2022, labeled on the Community Development page as effective July 2021. Building permits are priced from the California Building Code valuation tables rather than flat fees, so staff calculate the amount from the project valuation.

Rather talk it over?

Call 1-855-478-4290 →
Avenal building and planning fees, FY 2021-2022
ItemFee
Building permitPer California Building Code valuation
Building plan check65% of the building permit fee
Electrical, plumbing or mechanical plan check25% of the permit fee
Issuance fee: electrical / mechanical / plumbing$41.25 / $44.06 / $37.50
Compliance inspection or certificate of occupancy$100
Demolition$50 plus $100 deposit
Resubmittal review$120 per hour
Re-inspection (second inspection)$90 per hour
Work without a permitDouble the permit fee
Site plan review / conditional use permit$1,295 / $1,595 minimum
Variance / home occupation$545 / $345
Planning certificate of occupancy$195
Lot line adjustment / appeal$595 / $100

Plan check fees are paid before the permit is issued whenever plans are required. The planning fees cover city processing and hearing notices only; they do not include building permit fees, development impact fees or charges from other agencies, and engineering or consultant costs are billed to the applicant. The planning certificate of occupancy fee covers planning, building and fire staff time. School fees are paid at the school district.

Trade permits and who may pull them in Avenal

Electrical, plumbing and mechanical permits are issued by the Building Division and priced from the state electrical, plumbing and mechanical codes and valuation, plus a fixed issuance fee for each trade ($41.25 electrical, $44.06 mechanical, $37.50 plumbing) and trade plan check at 25% of the permit fee. Water and gas lines get pressure tests and drain and sewer lines get water tests during inspection.

Under the city’s homeowner guide, a permit may be issued only to a California licensed contractor or to the homeowner. Owners doing their own work should know that the inspector can explain code requirements but will not supervise the job. Businesses in Avenal apply for a city business license on the form posted online or at City Hall, weekdays 8:00 a.m. to 4:30 p.m., and should check zoning first with Community Development.

Rather not deal with the building department?

Get a free quote →

How to apply for an Avenal building permit

1. Check zoning

Call Community Development (559-386-5782) to confirm the zone and whether a zoning permit or site plan review is needed.

2. Ask for a preliminary review

Bring a sketch to the Building Division counter before final drawings; the city says a short conversation can save redrawing.

3. Prepare plans

Draw plans to scale with a site plan, or use a city standard drawing for patios, block walls, windows or EV chargers.

4. Apply online

Register on the city’s permit portal, complete the building application and upload the plans.

5. Clear plan check

Answer the contract plan reviewer’s corrections; resubmittals are billed at $120 an hour.

6. Pay and receive the permit

Pay plan check and permit fees and any school fees, then keep the approved plans and job card on site.

Review, corrections and what causes delay

The permit is issued only after every required department has approved the plans. The city advises asking for a fee estimate before final plans are drawn and making sure plans clearly show what, where and how you will build. The homeowner guide says an application with no permit issued expires 360 days after filing, with one 180-day extension; changes during construction need approval and may add plan check and fees. New homes and additions may need plans by a California registered architect or engineer.

Inspections in Avenal

Request inspections at the Building counter, by phone at 559-386-5766 or through the online request page, giving your name, phone number, permit number, job address and the type of inspection. Typical stages for a home are foundation, slab or underfloor, roof sheathing and shear nailing, framing, insulation, lath or gypsum board, and final, plus pressure and water tests on piping. The inspector signs the job card when work passes or leaves a correction notice; a second inspection is billed at $90 an hour. A permit lapses if work does not start, or no inspection is approved, within 180 days, with one 180-day extension on written request. Conditions from other departments must be met before the final, and after a new electric or gas service passes, the owner arranges the meter with the utility.

California building code in Avenal

Avenal’s Building Division and its contract firm apply the state building standards along with the city’s own building regulations and standard specifications and drawings, both posted on the Building Division page. FEMA’s Community Status Book lists Avenal (community 065073) as participating in the National Flood Insurance Program, with flood maps effective June 16, 2009.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Avenal building permit FAQs

Who issues building permits in Avenal?

The city’s Building Division at 919 Skyline Boulevard, with plan review and inspections contracted to Willdan Engineering.

Can I apply on paper?

No. The city requires all building, zoning and land division permits to be submitted through its online portal.

How much is plan check?

65% of the building permit fee, which is based on the California Building Code valuation tables, under the FY 2021-2022 fee sheet.

Do I need a permit for a shed or fence?

Not for a one-story detached shed up to 120 square feet or a wood, chain link or wrought iron fence up to 7 feet, though zoning rules still apply.

How do I schedule an inspection?

At the Building counter, by phone at 559-386-5766, or online, with the permit number, address and inspection type.

Where do I pay school fees?

At the school district (RSUSD on the city’s building fee sheet), not at City Hall.

Is there a standard plan for a patio cover?

Yes. The city’s patio guideline sheet shows three attachment details with span tables; the cover may not be enclosed or used as a balcony or deck.

When does the Planning Commission meet?

On the first Monday of each month at 6:00 p.m. at the Avenal Theater & Event Center, 233 E. Kings Street.

Avenal permit search and official resources

Your applications, permits and inspection requests are tracked in your account on the city’s permit portal. For older permits or property records, contact the Building Division at 559-386-5766 or building@cityofavenal.gov.

Inspections are where schedules slip.

Get a free quote →

Simplify Avenal permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Avenal sooner?

Let Alliance prepare, file, and track your Avenal permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Avenal permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.