In the Village of Weston, the Planning and Development Department at the Weston Municipal Center, 4747 Camp Phillips Road (715-241-2613), issues building, electrical, plumbing, HVAC and zoning permits, and it provides the same planning, zoning and building inspection services for the Town of Weston. Building permits are filed only in the Evolve online portal. Jennifer Higgins is Director of Planning and Development and Zoning Administrator, and Roman Maguire is Building Inspector and Building Manager. Fees come from the village’s 2026 fee schedule, last revised May 18, 2026.
What requires a building permit in Weston?
The village requires a permit for all new construction, alteration and demolition of any structure before work starts, and its permit pages list the common residential cases:
Permit required
- New one- and two-family homes and manufactured home installations
- Home and attached garage additions, and structural interior remodels (moving or removing walls, doors or windows, vaulted ceilings)
- Non-structural work under a home improvement permit: re-roofing, siding, soffit and fascia, drywall, cabinets and basement build-outs
- Every accessory structure, within the lot’s maximum accessory floor area (Figure 5.01(1) of the zoning code)
- Decks, fences, permanent above-ground and in-ground pools, hot tubs and in-ground sprinkler systems
- New driveways, driveway expansions and resurfacing
- Demolition of any building, including manufactured homes
- Rewiring, new circuits, service upgrades; re-plumbing or added fixtures; fireplaces, wood stoves, furnaces and AC units
No permit
- Seal coating a driveway
- Portable pools taken down each year
- Re-decking with like material
- Decorative ponds
- At-grade patios and fire pits, according to the permit page (setbacks still apply)
Note the one inconsistency: the 2026 fee schedule lists a $50 hardscape fee covering patios, fire pits, outdoor kitchens and retaining walls, so ask staff before building one. Commercial and multifamily (3+ unit) properties also need a roofing permit for a full re-roof, a permit to resurface a parking lot of more than 6 stalls, and trade permits for water heaters, furnaces and air conditioners.
What Weston decides and what the state holds
Construction standards come from the state’s Uniform Dwelling Code and Commercial Building Code; new homes are filed on the Wisconsin Uniform Building Permit Application. The village writes its own Chapter 94 zoning code (adopted March 18, 2015, last amended November 17, 2025; Ordinances 25-011 and 25-016 of 2025 changed the accessory structure rules), its subdivision rules and its fees, and the fee schedule applies equally in the joint Town and Village ETZ area. Town of Weston parcels outside the ETZ area follow the town’s own Chapter 94, adopted March 12, 2025, but are still reviewed by the village department. Plans for commercial work that modifies more than 25,000 cubic feet need state approval from DSPS before the village issues a permit.
Short on time to read all of this?
Get a free quote →Weston building department: who handles permitting
The DSPS list of UDC delegated agents (current as of September 24, 2026) shows both the Village of Weston and the Town of Weston in Marathon County with their own delegations, and the village’s Planning and Development Department provides planning, zoning and building inspection for both. Inspectors no longer keep walk-in hours; book an appointment for help with an application or a project question. Fire protection is provided by the South Area Fire & Emergency Response (SAFER) district.
| Detail | Information |
|---|---|
| Office | Planning and Development Department, Weston Municipal Center, 4747 Camp Phillips Road, Weston, WI 54476 |
| Phone | Building inspections and planning 715-241-2613; Municipal Center 715-359-6114 |
| Hours | Monday to Friday, 8:00 a.m. to 4:30 p.m. |
| Department head | Jennifer Higgins, Director of Planning & Development and Zoning Administrator |
| Building official | Roman Maguire, Building Inspector and Building Manager |
| Portal | Evolve (InfoVision) online permit system |
| Water and sewer | Weston utilities, 715-359-2876 |
Weston permit types
Evolve handles building permits, sign permits, commercial occupancy permits and temporary use permits; paper applications are no longer accepted for those. After you pick the permit type and enter the address, a “not in jurisdiction” message means the parcel is outside the village and the Town of Weston. Required fields must be completed and some permits require uploads such as site plans before the system will move on, and staff can help by appointment at the Municipal Center.
Residential permits
A new house uses the Wisconsin Uniform Building Permit Application path in Evolve. The addition and structural remodel permit includes the electrical, plumbing and HVAC trades, while the home improvement permit and accessory structure permit do not, so trade work under those is added at a set fee. Fences, decks, permanent pools and lawn sprinklers share one “other home projects” application, and driveways have their own. Home occupations and the larger residential businesses need their own permits, and a residential business is a conditional use in the residential districts.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Every new commercial building or addition needs site plan approval before any building permit, and in many cases a pre-application conference with planning staff first. Site plans for commercial, industrial and multifamily projects include a landscape calculation worksheet for new buildings, additions and new or expanded parking lots. New businesses, new tenants, changes of ownership and changes of use within a building need a zoning permit and certificate of occupancy before opening, filed in Evolve; applying after occupancy costs double the fee, so contact the village before signing a lease or buying commercial property.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Conditional use and rezoning. Both need a public hearing with a Class 2 notice and mailed notice to owners within 300 feet. The Plan Commission (or the ETZ Committee for town land) acts on a conditional use within 60 days of the hearing; on a rezoning it recommends within 45 days and the Village Board decides within 120 days of a complete application.
- Comprehensive plan amendments are taken twice a year, with applications due April 1 or October 1.
- Variances. The Zoning Board of Appeals holds its hearing within 45 days of a complete application.
- Land division. Up to three new parcels and a remnant use a certified survey map; more need a subdivision plat.
- Drainage review is charged on every new home and on multifamily and commercial sites.
- Streets and highways. Work in a village street needs an excavation or street privilege permit; a driveway onto a state highway needs a WisDOT connection permit.
Weston permit costs and fees
The 2026 fee schedule (revision dated May 18, 2026) sets every building, trade, zoning and land-division fee for the village and the joint ETZ area. Staff send an invoice after the completeness review; card payments carry a 3.25% plus $1 convenience fee and e-checks $0.64. Work started without a permit brings a stop work order and triple fees.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| New 1–2 family home: plan review (finished floor and garage area) | $400 plus $12 per 100 sq ft over 1,500 |
| New 1–2 family home: inspection fee (finished, unfinished and garage area) | $650 plus $25 per 100 sq ft over 1,500 |
| State UDC seal / drainage review | $40 / $100 single-family, $150 two-family |
| Completion surcharge (refunded after final site and building inspection) | $1,000 |
| Early start, footings and foundation | $100 residential; $200 commercial |
| Home addition (trades included) / attached garage addition | $250 / $100, each plus $20 per 100 sq ft over 200 |
| Structural / non-structural interior remodel | $150 / $50, each plus $20 per 100 sq ft over 200, plus $45 per trade inspection |
| Re-roofing, siding, soffit and fascia | $60 |
| Accessory structure | $40 up to 200 sq ft; $60 plus $0.10/sq ft to 800; $120 plus $0.20/sq ft over 800; $40 per trade |
| Deck (new or altered; plus an administrative fee) / fence / above-ground pool or hot tub / in-ground pool | $100 / $40 / $60 / $100 |
| Driveway: new / replacement or expansion / temporary | $75 / $50 / $100 |
| Electrical service or generator / each circuit; plumbing; HVAC unit | $75 / $10; $50; $50 per unit |
| Rooftop / ground solar | $200 / $250 |
| Demolition | $150 house; $75 accessory; $100 manufactured home |
| Re-inspections | $75 first; $150 second; $200 after that |
| Commercial building permit | $0.11 per sq ft, $200 minimum, $5,000 maximum |
| Commercial occupancy certificate / site plan review | $150 / $600 under 1 acre, $800 over |
| Commercial plumbing / HVAC / roofing | $200 / $100 / $100 |
| Park and recreation impact fee | $761 per single-family unit; $563 duplex; $495 multifamily |
| Conditional use / rezoning / variance | $350 / $350 / $400 |
Worked example from the schedule: a house with 1,900 square feet of finished floor and a 600-square-foot garage (2,500 square feet for plan review) over a 1,500-square-foot unfinished basement (4,000 square feet for inspection) pays $400 + 10 × $12 = $520 in plan review and $650 + 25 × $25 = $1,275 in inspection fees, plus $40 for the seal and $100 drainage review: $1,935. The $1,000 completion surcharge comes back after the final inspections, and a $761 park impact fee applies to the new unit. The schedule does not list separate trade fees for a new house, so ask staff whether they are included.
Trade permits and who may pull them
Weston issues its own electrical, plumbing and HVAC permits and inspects them with village staff, including a part-time commercial electrical inspector. Residential electrical permits cover rewiring, circuit extensions, new circuits and service upgrades or relocations; plumbing permits cover re-plumbing and added or moved fixtures; HVAC permits cover fireplaces, wood stoves, furnaces and air conditioners.
Rather not deal with the building department?
Get a free quote →- Who applies: Evolve asks for every contractor and subcontractor on the project, and a one- or two-family job is permitted only to a contractor holding the state Dwelling Contractor certification with a Qualifier, or to an owner-occupant. Electricians and plumbers carry DSPS licenses; HVAC businesses register with DSPS.
- Remodels and accessory buildings: trade inspections are added at $45 each on a remodel and $40 each on an accessory structure; an addition permit already includes them.
- Commercial: electrical permits are priced by building area, from $0.06 per square foot for warehouses and shells to $0.12 for multifamily, plus a service-size fee, $200 minimum and $5,000 maximum; service changes run $105 to $150, and commercial solar $300 or $500.
- Signs: a wall sign is $75 plus $1 per square foot over 50, and an electrical permit for a lit sign adds $50.
How to apply for a Weston building permit
Check the zoning map or call 715-241-2613; for town parcels, confirm whether the ETZ code or the town zoning code applies.
Book a pre-application conference for site plans, conditional uses or rezonings, and file those first.
Use the village’s step-by-step guide to register in the InfoVision Evolve portal.
Pick the permit type, enter the address, list every contractor and upload site plans or drawings the system asks for.
After the completeness review, pay by mail or in person at the Municipal Center; the permit is then e-mailed to you.
Log in to Evolve and request each inspection under the permit at least 48 hours ahead.
Review, corrections and what causes delay
Applications are screened for completeness before they go to staff, the Plan Commission or the Village Board, so missing uploads stop the clock. Commercial projects wait on site plan approval and, above 25,000 cubic feet of work, on DSPS plan approval. Hearings for conditional uses, rezonings and variances add weeks: notices must be published and mailed before the Plan Commission or Zoning Board of Appeals can act.
Inspections in Weston
When the work is ready, request the inspection in Evolve under the permit, or call 715-359-6114 or e-mail the department, at least 48 hours ahead; a voicemail left for an inspector does not book one. An inspector contacts you with a time window, and once the final inspection passes the permit is closed. New houses and two-family homes carry the $1,000 completion surcharge, which is refunded only after both the site and the building pass their final inspections, and the residential occupancy certificate is included in the fees.
A failed inspection costs $75 for the first re-inspection, $150 for the second and $200 for each one after that. Commercial occupancy inspections are $150, with $100 for a re-inspection, and every new business or change of use needs that certificate before opening.
Want this handled start to finish?
Get a free quote →Wisconsin building code in Weston
Weston enforces the state codes through its own UDC delegation and its municipal code, including the permit penalty in Section 14.101.11. FEMA’s Community Status Book lists the village (community 550323) as participating in the National Flood Insurance Program with no special flood hazard area mapped; the fee schedule still lists $100 shoreland and floodplain zoning permits for work the zoning code places under those rules.
Wisconsin's Uniform Dwelling Code covers one- and two-family homes. Its Commercial Building Code covers public buildings, workplaces and buildings of three or more units. Local ordinances must conform to both. Wisconsin rules
Weston permit search and official resources
Your own permits, invoices and inspection requests are tracked in your Evolve account. For other permit files, plans or inspection records, file a public records request on the village’s online form, by e-mail to the clerks’ office, in person at the Municipal Center or by phone at 715-359-6114. A zoning verification and compliance letter for a property is a separate, fee-based service.
- Planning and Development Department
- Permit applications and Evolve instructions
- How to create an Evolve account
- 2026 fee schedule (rev. May 18, 2026)
- Residential building permits
- Commercial and multifamily permits
- Chapter 94 zoning ordinance (last amended Nov. 17, 2025)
- Zoning and land use
- Town of Weston zoning and ETZ area
- Open records request
- Evolve online permit portal
- DSPS UDC delegated agents list
- WisDOT state highway connection permits
- FEMA Community Status Book, Wisconsin
Inspections are where schedules slip.
Get a free quote →Weston building permit FAQs
Can I still apply on paper in Weston?
No. Building, sign, commercial occupancy and temporary use permits are filed only in Evolve; staff help by appointment at the Municipal Center.
Does the village handle permits in the Town of Weston?
Yes. The village’s Planning and Development Department provides planning, zoning and building inspection for the town, and the same fee schedule applies in the ETZ area.
How much is a permit for a new house?
$400 plan review and $650 inspection fees plus area charges over 1,500 square feet, $40 seal and $100 drainage review, with a refundable $1,000 completion surcharge.
Do I need a permit for a shed?
Yes. Every accessory structure needs a permit: $40 up to 200 square feet, more for larger buildings.
Do I need a permit to replace my driveway?
Yes for new, expanded or resurfaced driveways ($50 to $75); seal coating needs no permit.
What happens if I build without a permit?
The village issues a stop work order and the permit fees are tripled.
How far ahead must I book an inspection?
At least 48 hours, through Evolve, by phone or by e-mail; voicemails to inspectors are not bookings.
Is there a park fee on new homes?
Yes. The park and recreation impact fee is $761 for each single-family unit, $563 per duplex unit and $495 per multifamily unit.
Simplify Weston permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Wisconsin. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Weston sooner?
Let Alliance prepare, file, and track your Weston permits while your crew stays on the job.
More Wisconsin permitting guides
Marathon County
Read guide →Portage County
Read guide →Clark County
Read guide →Whitefish Bay Building Permit Guide
Read guide →Whitewater Building Permit Guide
Read guide →Winnebago County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Weston permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.