Skip to main content
Municipal GuideWisconsinSalem Lakes · Village

Salem Lakes, Wisconsin Building Permit Guide

To get a building permit in Salem Lakes, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Building and zoning permits for the Village of Salem Lakes are handled by Kenosha County in Bristol and filed through the county’s online permitting portal; the village still issues driveway permits on village roads.

Authority: Kenosha County Division of Planning & Development, for the Village of Salem LakesCode: Wisconsin UDC; Salem Lakes zoning and floodplain ordinancesPhone: 262-857-1901
Permits
Kenosha County, Bristol19600 75th Street
Apply
County eTRAKiT portalLinked from the village site
New home
$0.38 per sq ftPlus $250 plan review
Village driveway
$50 permitVillage roads only

The Village of Salem Lakes moved its building and zoning work to Kenosha County, so permits for houses, additions, decks and commercial buildings are filed through the county’s online permitting portal and handled from the county building at 19600 75th Street in Bristol. County zoning administrators cover the village on set days, and the village’s state-delegated building inspection is done by the inspector the village lists. The village still approves driveways on village roads for $50. Under the county schedule the village posts, a new home pays $0.38 per square foot plus a $250 plan review.

What requires a building permit in Salem Lakes?

The fee schedule that Salem Lakes posts for its building and zoning work, the Kenosha County Division of Planning & Development schedule, shows what is permitted in the village by listing it. Building fees for Brighton, Paris and Salem Lakes cover new one- and two-family homes and attached garages, additions, remodels, repairs and alterations, detached garages and accessory buildings, sheds, decks and patios, fences, driveways off county highways, culverts, pools, spas and hot tubs, re-roofing and siding, razing, moving a building over a public road, and signs; separate electrical, plumbing and HVAC permits apply to the trade work.

County building permits

  • New homes, additions, remodels and repairs
  • Detached garages, accessory buildings and sheds
  • Decks, patios, fences and pools
  • Re-roofing, siding and trim
  • Razing and moving buildings
  • Electrical, plumbing and HVAC work

Zoning and village permits

  • Zoning permits for principal and accessory structures
  • Shoreland permits on the village’s lakes
  • Conditional uses, variances and rezonings
  • Site plan review and certificates of compliance
  • Land divisions, lot line adjustments and parcel combinations
  • Driveways on village roads (village Highway Department)

What the village decides and what the state holds

Salem Lakes keeps its own ordinances: the Salem Lakes general zoning and shoreland/floodplain zoning ordinance, its floodplain rules and Ordinance 458 on driveways. The village’s two floodplain pages give different dates: the adoption tracking sheet lists a public hearing and adoption on January 22, 2024 and an effective date of April 11, 2024, while the floodplain mapping page says Ordinance 2024-02.75, effective February 5, 2024, repealed and recreated section 490-45, and that the updated Kenosha County flood study maps were adopted on April 11, 2024. Both pages agree that the updated flood maps took effect on April 11, 2024. The village keeps its own Plan Commission and Board of Appeals, with agendas and minutes on its site, and it has a 2050 comprehensive plan in public review draft (August 2025). Kenosha County administers the permits under those rules. The construction standards are the state’s Uniform Dwelling Code and Commercial Building Code, and the village holds the state delegation for new one- and two-family dwellings.

Short on time to read all of this?

Get a free quote →

Salem Lakes building department: who handles permitting

The village’s building page says it plainly: the Building and Zoning Department has moved to Kenosha County, and questions about building and zoning go to the county. Two county zoning administrators serve Salem Lakes, one on Mondays and Tuesdays and the other Wednesday through Friday. The village lists its building inspector separately, and the state’s delegation list names Blue Line Inspections as the inspection agency for the village.

Salem Lakes permitting contacts
OfficeContact
Kenosha County building department (building permits for Salem Lakes)19600 75th Street, Bristol, WI 53104; online through the county permitting portal
County zoning administrators for Salem LakesMondays and Tuesdays 262-960-2165; Wednesday to Friday 262-857-1901
Building inspector (village listing)Contact listed on the village’s building page
Salem Lakes Highway Department (driveways on village roads)Through Village Hall
Kenosha County Division of Highways (driveways on county roads)19600 75th Street, Suite 122-1, Bristol; 262-857-1870
Village Hall9814 Antioch Road (STH 83), Salem, WI 53168; 262-843-2313; Monday to Friday, 8:00 a.m. to 4:30 p.m.

Salem Lakes is on the state’s Uniform Dwelling Code delegation list (current as of September 24, 2026) in its own right, with the village administrator as contact. Inspection of a new house is therefore done under the village’s delegation, while the county handles the paperwork, zoning review and fees.

Salem Lakes permit types and application documents

Building permits are applied for in the Kenosha County online permitting portal, which the village links from its building page. The village’s zoning page keeps the zoning forms used in Salem Lakes: a certificate of compliance application, comprehensive plan amendment, conditional use permit packet, cost recovery agreement, fire department site plan review checklist, land division, lot line adjustment, parcel combination affidavit, rezoning packet, shoreland permit application, site plan review, temporary use, variance, and waivers of liability for the survey and the foundation survey.

Residential permits

A new house runs through zoning and building together: the county zoning permit for a single-family home is $300, the building permit is charged by the square foot, and the file needs an erosion control permit and, at the end, an occupancy permit. The village’s forms list includes waivers of liability for the survey and for the foundation survey, and the building page posts an impervious surface area calculation worksheet.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial buildings pay $2,000 for a new principal structure in county zoning fees and $1,000 for an addition or alteration, plus building fees of $0.35 per square foot and a plan review of $300 plus $30 per unit. Site plan review is priced by building area, from $750 for 3,000 square feet or less, and the village’s fire department has its own site plan checklist.

What comes before the building permit

  • Zoning. The county zoning administrators review setbacks and use under the Salem Lakes zoning ordinances; rezonings, conditional uses and variances follow the village’s own fee lines.
  • Floodplain and shoreland. The 2024 floodplain rules and maps, and a shoreland permit for lakefront work; the village still posts the 2020 floodplain mapping study for Camp and Center Lakes.
  • Septic. Where there is no sewer, a county sanitary permit, priced from $475 for an in-ground gravity system.
  • Driveway. A $50 village permit on village roads, or a Kenosha County permit on county roads.
  • Access on WIS 83. The village posts the WIS 83 access management vision for the highway from WIS 50 to the state line.

Salem Lakes permit costs and fees

The fee schedule the village links is the Kenosha County Division of Planning & Development Fee Schedule, effective February 14, 2024; its building fee sections are headed “Brighton, Paris, Salem Lakes” and it has a separate section of Village of Salem Lakes zoning fees.

Rather talk it over?

Call 1-855-478-4290 →
Fees for Salem Lakes (Kenosha County schedule effective February 14, 2024)
ItemFee
New 1–2 family residence and attached garage / additions / remodels$0.38 per sq ft each
Plan review: 1–2 family residence / additions and alterations$250 / $100
Plan review: decks and pools / detached garages and accessory structures$50 / $75
Detached garage or accessory building$0.32 per sq ft
Shed / deck or patio / fence / driveway off county highway$75 each
Re-roof, siding or trim / re-inspection$70 / $100
Occupancy permit / early start for a 1–2 family residence$100 / $250
Impact fee / performance bond$2,000 / $2,500
Erosion control: 1–2 family residence / garage, accessory or addition$200 / $75
WI uniform building permit sealState charge plus $25
Minimum building permit fee$50
Electrical, plumbing or HVAC, new structure$75 plus $0.05 per sq ft each
Zoning permit: single-family / two-family principal structure$300 / $600
Zoning permit: accessory building over 150 sq ft / residential addition$150 / $175
Village of Salem Lakes rezone / conditional use permit$1,325 / $1,325
Village variance or temporary use / certified survey map$875 / $525

Most of the village lines include a $75 publication fee. Other lines that come up on house projects: razing or wrecking is $100 plus $0.12 per square foot (capped at $900), pools, spas and hot tubs are $13 per $1,000 of value with a $75 minimum, a culvert is $100, and a sign is $125. Erosion control plan review where no engineered stormwater plan is needed is $250. The schedule’s deck lines add up to $260 for a typical deck: $75 for the building permit, $50 for plan review, $60 for the zoning permit and $75 for erosion control. The village’s own driveway application for a village road shows a $50 fee, while the county schedule lists $75 for driveways not on a county highway; the village’s driveway page sends village-road driveways to its Highway Department, so ask which form applies before paying.

Trade permits and who may pull them

Electrical, plumbing and HVAC permits for Salem Lakes are part of the same county system, with residential minimums of $75 each and a re-inspection fee of $75. A new structure pays $75 plus $0.05 per square foot for each trade; an electrical service upgrade or rewire is $75, plumbing fixtures are $10 each, and an air conditioner or new furnace is $75.

  • Builders. A new one- or two-family home needs a state Dwelling Contractor certification and a certified Dwelling Contractor Qualifier unless the owner-occupant builds it.
  • Owners on driveways. The village asks owners doing their own driveway to sign its homeowner waiver.
  • Septic. County sanitary permits, from $475 for an in-ground gravity system to $775 for a mound, are on the same county schedule.
  • Commercial trades. Commercial electrical, plumbing and HVAC permits have a $125, $75 and $125 minimum respectively.

Rather not deal with the building department?

Get a free quote →

How to apply for a Salem Lakes building permit

1. Talk to zoning

Call the county zoning administrator on duty that day about setbacks, shoreland and floodplain rules.

2. Get a survey

Prepare a survey or site plan and, where asked, the impervious surface worksheet.

3. Apply online

File the zoning and building applications in the Kenosha County permitting portal.

4. Add the driveway

Apply to the village Highway Department for a village-road driveway, or to the county for a county road.

5. Pay and post

Pay the plan review, permit, erosion control and any impact fees and bond.

6. Book inspections

Schedule inspections with the building inspector the village lists.

Review, corrections and what causes delay

The two county zoning administrators split the week, one on Mondays and Tuesdays and the other Wednesday through Friday, so questions go to whoever is on duty that day. Projects needing a rezoning, conditional use or variance go through a village hearing with publication, and floodplain sites must meet the 2024 floodplain ordinance before a permit issues. New curb and gutter for a driveway needs a pre-pour inspection once it is framed.

Inspections in Salem Lakes

Building inspections in the village are done by the inspector the village lists, the agency the state’s delegation list names for Salem Lakes. The county schedule charges $100 for a re-inspection and $75 for failing to call for a required inspection on a home, and the occupancy permit for a new house is $100 ($100 for a temporary one).

Driveways have their own checks: the Salem Lakes Highway Department must approve the driveway before the permit issues, it must sit at least 2 feet off the property line and be no wider than 24 feet at the street, concrete is 7 inches thick where there is curb and gutter and 4 inches where there is not, and new curb and gutter sections need a pre-pour inspection.

Wisconsin building code

FEMA’s Community Status Book lists Salem Lakes (community 550505) as participating in the National Flood Insurance Program, with a current effective flood map dated April 11, 2024, the date the village gives for adopting the updated Kenosha County flood insurance study maps prepared by the Wisconsin DNR with FEMA.

Wisconsin's Uniform Dwelling Code covers one- and two-family homes. Its Commercial Building Code covers public buildings, workplaces and buildings of three or more units. Local ordinances must conform to both. Wisconsin rules

Want this handled start to finish?

Get a free quote →

Salem Lakes permit search and official resources

Current building and zoning permits sit in the Kenosha County permitting portal. The county schedule also prices written answers about a property: buildability, re-buildability, zoning verification and floodplain review letters are $65 for the first parcel and $10 for each additional one, and processing a FEMA letter of map amendment request (out as shown) is $50. For village records, the village’s forms page has an Open Records Request form, and the Village Clerk answers license and permit questions at 262-843-2313, extension 5715.

Inspections are where schedules slip.

Get a free quote →

Salem Lakes building permit FAQ

Who issues building permits in Salem Lakes?

Kenosha County, which took over the village’s building and zoning work; applications go through the county’s online portal.

Where is the building office?

At the Kenosha County building, 19600 75th Street in Bristol. Village Hall, at 9814 Antioch Road, still takes driveway permits for village roads and open records requests.

How much is a permit for a new house?

The building permit is $0.38 per square foot, with a $250 plan review, a $300 zoning permit, a $200 erosion control fee, a $2,000 impact fee and a $100 occupancy permit, among other items.

Who approves my driveway?

The village Highway Department on village roads ($50 village form); Kenosha County’s Division of Highways on county roads.

Do I need a permit for a deck or fence?

Yes. Each is a $75 building fee, with zoning fees of $60 for a deck and $50 for a fence.

Who do I call about zoning?

The county zoning administrator: 262-960-2165 on Mondays and Tuesdays, 262-857-1901 Wednesday to Friday.

Does Salem Lakes have floodplain rules?

Yes. Ordinance 2024-02.75 recreated the floodplain section of its zoning ordinance, and the updated flood maps were adopted April 11, 2024; village staff answer map questions at 262-843-2313.

Who inspects new homes?

The village holds the state delegation, and the state’s list names Blue Line Inspections as its inspection agency.

Simplify Salem Lakes permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Wisconsin. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Salem Lakes sooner?

Let Alliance prepare, file, and track your Salem Lakes permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Salem Lakes permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.