Jackson County, Wisconsin Building Permit Guide

To get a building permit in Jackson County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Jackson County’s Zoning, Planning and POWTS Department at the courthouse in Black River Falls issues sanitary, land use, shoreland and floodplain permits for unincorporated land; dwelling code building permits come from each municipality or the state’s inspector.

Authority: Jackson County Zoning, Planning & POWTSFees: Schedule effective January 1, 2026Phone: 715-284-0220
County issues
Sanitary and land usePlus shoreland and floodplain
Zoned towns
14 of 21Seven towns: shoreland, floodplain, septic only
House permit
$300 land useAfter a $400–$600 sanitary permit
Office
307 Main St., Suite B03Black River Falls, 715-284-0220

In Jackson County, the Zoning, Planning and POWTS Department at the courthouse, 307 Main Street, Suite B03, Black River Falls (715-284-0220), runs the county’s zoning, shoreland, floodplain, subdivision, sanitary and airport height ordinances in the unincorporated areas; Jonathan Hemp is the Zoning Administrator. A new home needs the county sanitary permit first, then a $300 land use permit in a zoned town, and finally the dwelling code building permit from the local municipality or, where no municipality is delegated, the state’s inspector.

What requires a county permit in Jackson County?

Chapter 17, the county zoning ordinance, has governed many rural areas since April 19, 1966. Fourteen towns are under county comprehensive zoning, and in every town the county still controls shoreland, floodplain, septic systems and minimum lot sizes. In a zoned town, a land use permit is required for building, placing, adding to or altering any structure.

County permit needed

  • Homes, garages, sheds, barns, decks, porches and gazebos (land use permit in zoned towns)
  • Carports with metal roofs, shipping containers, signs and towers
  • Any septic system, reconnection, tank replacement, repair or privy (sanitary or non-plumbing permit)
  • Building within 300 feet of a river or stream or 1,000 feet of a lake or flowage (shoreland)
  • Building on land shown on FEMA flood maps (floodplain)
  • Grading and filling above the ordinary high-water mark of navigable water
  • Dividing land by certified survey map or plat
  • Registering a travel trailer kept more than 25 days a year on vacant land

Outside the county’s land use permit

  • Structures in the seven unzoned towns outside shoreland and floodplain areas (septic permits still apply there)
  • Anything in Black River Falls or the five villages, which run their own land use plans

What the county decides and what the state holds

The county decides where and how land may be used in its zoned towns and controls septic systems everywhere outside the city and villages. It does not enforce the dwelling code: the county’s own UDC page says the local municipality administers and enforces it, and DSPS’s delegated-agent list, current as of September 24, 2026, shows no county delegation. The county’s construction guide also says all commercial and business building inspections in the county are done by DSPS.

Jackson County building department: who handles permitting

The department reviews and issues permits, inspects sites (it visits every site before a permit is issued), investigates complaints and keeps the records. The Zoning and Land Information Committee holds public hearings on rezonings, conditional uses and plats, and the County Board makes the final decision on zoning map amendments. For livestock and animal facility licenses, the Land Conservation Department (715-284-0256) is the contact.

Short on time to read all of this?

Get a free quote →
Jackson County zoning contacts
DetailInformation
OfficeZoning, Planning and POWTS Department, Jackson County Courthouse, 307 Main Street, Suite B03, Black River Falls, WI 54615
Phone and email715-284-0220; fax 715-284-0238; zoning@jacksoncountywi.gov
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m.
Zoning AdministratorJonathan Hemp
County highway accessJackson County Highway Department, 715-284-0264
Jackson County municipalities: county zoning and UDC building permits
MunicipalityCounty zoning and who issues UDC permits
City of Black River Falls (3,555)Own land use plan; delegated city, General Engineering on the DSPS list
Villages of Alma Center and TaylorOwn land use plans; delegated, General Engineering on the DSPS list
Villages of Hixton, Melrose and MerrillanOwn land use plans; delegated
Towns of Bear Bluff, Brockway, Cleveland, Franklin, Garden Valley, Knapp, Manchester, Melrose, Millston and North BendCounty-zoned; each delegated (the county guide names General Engineering as their inspector)
Town of AdamsCounty-zoned; delegated, with an individual inspector on the DSPS list (the county guide names General Engineering)
Towns of Albion, Komensky and SpringfieldCounty-zoned; not on the DSPS list, so a DSPS-appointed inspector issues UDC permits
Towns of Alma, Curran and IrvingNot county-zoned; each delegated (Alma: General Engineering)
Towns of City Point, Garfield, Hixton and NorthfieldNot county-zoned; not on the DSPS list, so a DSPS-appointed inspector issues UDC permits

Jackson County permit types

The county guide lists the permits in the order they must be issued: sanitary permit, land use permit, driveway, address number and, last, the local building permit.

Residential permits

  • Sanitary permit. Required for any dwelling meant for people to live in, and the first permit before building or placing it. A certified soil tester evaluates the soil, a licensed plumber or designer designs the system, and the plumber files the application.
  • Non-plumbing and reconnection permits. A privy, composting or chemical toilet needs a non-plumbing permit and a recorded agreement; connecting a new or different building to an existing system needs a reconnection permit, issued only if the system passes inspection.
  • Land use permit. Filed with a site plan in a zoned town; staff inspect the site before work starts. It is valid for six months and can be renewed for $50.
  • Accessory buildings first. An accessory building put up before the house needs an affidavit as well as the land use permit.
  • Town permits. Some towns add their own: City Point and Millston charge $25 and $10 administrative permits for new structures valued over $5,000, and Garfield takes a $25 building notification.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial projects in zoned towns use the commercial land use permit ($500 new, $250 for additions, changes or renewals) and often a conditional use permit. Commercial and business building inspections are done by DSPS, according to the county’s construction guide. Wireless towers have their own permit fees, and nonmetallic mines need a conditional use permit priced by acreage.

What comes before the building permit

  • Rezoning or conditional use. The request is published for two weeks, the Town Board files a position form, and the Zoning and Land Information Committee holds a hearing (usually the Thursday before the County Board meeting) that the petitioner must attend; map amendments then go to the County Board.
  • Shoreland and floodplain. Chapter 16 (shoreland) and Chapter 20 (floodplain) apply in every town; the county urges a call before any work near water.
  • Setbacks. Roads: 110 feet from a state highway centerline, 75 from a county highway and 63 from a town road (or the right-of-way distance if greater). Structures stay 75 feet from the ordinary high-water mark, 100 feet on the Black River below the State Highway 54 bridge.
  • Driveways. WisDOT for state highways, the county Highway Department for county roads, and the town for town roads.
  • Land division. Up to four lots in five years by certified survey map; five or more lots need a plat and a public hearing.

Jackson County permit costs and fees

Fees come from the Jackson County Zoning, POWTS and Land Information fee schedule, effective January 1, 2026. Payment can be made by card online through the county’s payment service (a convenience fee applies), with the receipt emailed to the office along with the application.

Rather talk it over?

Call 1-855-478-4290 →
Jackson County fees (effective January 1, 2026)
WorkFee
Land use permit: new or principal structure / addition or modification / accessory structure$300 / $100 / $200
Land use permit renewal (six months)$50
Commercial land use permit: new / addition, modification or renewal$500 / $250
Shoreland or floodplain land use permit$250
State sanitary permit: conventional / mound, at-grade, in-ground pressure or in-fill$400 / $500
Holding tank / larger systems$600; $750 for 1,000–5,000 gallons a day; $1,000 above
County sanitary permit: reconnection, replacement tank, repair, remediation or non-plumbing system$250 each
Soil evaluation onsite / onsite inspection$100 / $50
Zoning map amendment / conditional use / variance or special hearing / appeal$300 / $400 / $750 / $350
After-the-fact conditional use / variance$800 / $1,500
Certified survey map review$50 plus $10 per lot
Travel trailer registration (annual)$100

Worked example from the schedule: a new house with a conventional septic system in a zoned town pays $400 for the state sanitary permit, $100 for the soil evaluation onsite and $300 for the land use permit, or $800 in county fees, before any town fee and the UDC permit. The county’s construction guide warns that starting before the land use permit is issued brings a penalty of 10 times the permit fee. Address signs are ordered and installed by the town, which charges its own fee.

Trade permits and who may pull them

The county issues no electrical, plumbing or HVAC permits. Septic work is the county’s trade field, and only licensed people do it:

  • Soil testing: by a certified soil tester; test pits must be dug by backhoe (hand-dug pits only where soils are suitable to 24 inches or less), all original soil reports go to the county, and the tester pays the soil onsite fee within 45 days ($100 in the 2026 fee schedule; the department’s policy sheet, which still points to the 2025 schedule, says $50, with a $10 late fee after 45 days). At least one pit is needed per absorption site, and site plans sent with the soil report must be legible, drawn to scale from distances measured on site and show contour lines at equal one- or two-foot intervals.
  • Installation: by the licensed plumber who filed the permit; the system must be inspected before backfilling, so the plumber calls at least 48 hours ahead, and the plumber is responsible for seeding and mulching.
  • Pumping: every septic tank must be pumped by a licensed pumper within 36 months of installation and at least every 36 months after, or sooner at one-third sludge depth; the county mails reminders and posts a list of licensed service providers.

Rather not deal with the Jackson County building department?

Get a free quote →

Dwelling code and electrical inspections for houses are done by the municipality’s inspector or the state’s. Several town sheets on the county’s site name General Engineering as the building inspector and as the contact for the electrical inspections that local electric utilities require.

How to apply for permits in Jackson County

1. Call the Zoning Department first

The county asks to be the first contact for any development, to check zoning, shoreland and floodplain rules.

2. Get the sanitary permit

Soil test, plumber’s design and plumber-filed application; allow up to two weeks in the construction season.

3. File the land use permit

Legal description, parcel size and a plot plan with setbacks to lot lines and roads; staff visit the site before work starts.

4. Arrange the driveway

Through WisDOT, the county Highway Department or the town, depending on the road.

5. Apply for the address number

Every structure needs one before occupancy; the town orders and installs the sign.

6. Get the local building permit

Contact the town clerk and its UDC inspector for the dwelling code permit.

Review, corrections and what causes delay

Applications with missing data, the wrong form or the wrong fee are returned. Sanitary permits can take up to two weeks in the construction season, and staff workload can limit inspection scheduling. Rezonings and conditional uses need two weeks of published notice and a hearing. A land use permit lapses after six months unless renewed.

Inspections in Jackson County

The county inspects every land use site before construction and every septic system before backfilling; soil onsite inspections need 48 hours’ notice. If staff cannot attend an installation, the plumber must send elevation data, the install date and an as-built plan on the county’s form. Non-plumbing systems are checked periodically under their recorded agreement.

Footing, framing, electrical and final inspections for a new house are done by the UDC inspector who issued the building permit; the county guide notes that the dwelling code applies to new one- and two-family homes and to additions and alterations to homes built after June 1, 1980.

Wisconsin building code in Jackson County

Jackson County does not enforce the dwelling code; municipalities do, and DSPS covers the towns that are not delegated and all commercial building inspections. FEMA’s Community Status Book lists Jackson County (community 550583) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2017; the paper FEMA maps can be viewed at the Zoning Department.

Want this handled start to finish?

Get a free quote →

Wisconsin's Uniform Dwelling Code covers one- and two-family homes. Its Commercial Building Code covers public buildings, workplaces and buildings of three or more units. Local ordinances must conform to both. Wisconsin rules

Jackson County permit search and official resources

Sanitary permits and septic pumping records can be viewed and printed through the county’s online mapping and property search portal. For other zoning records, ask the department; open-records copies cost 30 cents a page.

Inspections are where schedules slip.

Get a free quote →

Jackson County permit FAQs

Does Jackson County issue building permits?

No. It issues sanitary, land use, shoreland and floodplain permits; the dwelling code building permit comes from the municipality or, in towns not delegated, the state’s inspector.

Is my town under county zoning?

Fourteen towns are, including Adams, Brockway, Komensky, Millston and Springfield. Alma, City Point, Curran, Garfield, Hixton, Irving and Northfield are not, though county shoreland, floodplain, septic and lot-size rules still apply there. Millston’s own sheet says the town is not zoned, so confirm with the county.

How much are county permits for a new house?

$300 for the land use permit in a zoned town, plus $400 for a conventional septic permit or $500 for a mound, and $100 for the soil evaluation onsite.

How long is a land use permit good for?

Six months from issue; a renewal costs $50.

What if I start building before the permit?

The county guide warns of a penalty of 10 times the permit fee, and after-the-fact hearings cost more.

Who inspects commercial buildings?

The county’s construction guide says DSPS handles all commercial and business building inspections in the county.

How often must I pump my septic tank?

At least every 36 months, or when sludge reaches one-third of the tank; the county mails a notice to return with the pumper’s signature.

Simplify Jackson County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Wisconsin. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Jackson County sooner?

Let Alliance prepare, file, and track your Jackson County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Jackson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.