Door County, Wisconsin Building Permit Guide

To get a building permit in Door County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Door County’s Land Use Services Department in Sturgeon Bay issues zoning, shoreland, floodplain and septic permits for the towns, while each town, village and the City of Sturgeon Bay issues its own building permits.

Authority: Door County Land Use ServicesFees: Resolution 2024-52, effective 1/1/2025Phone: 920-746-2323
County issues
Zoning and septicNo county building permit
County zoning
9 of 14 townsShoreland and floodplain in all 14
Building permits
Each municipalityAll 19 are DSPS-delegated
Zoning permit
$150 to $1,000By building footprint

Door County does not issue building permits. Its Land Use Services Department at the Government Center, 421 Nebraska Street, Sturgeon Bay (920-746-2323), issues zoning permits in the nine towns enrolled in county zoning, shoreland and floodplain permits in all 14 towns, and sanitary (septic) permits in unsewered areas, all through its online application system. The building permit for a house comes from the town, village or city, every one of which holds its own Uniform Dwelling Code delegation; on an unsewered lot the septic permit comes before the county zoning permit.

What requires a permit in Door County?

A project in rural Door County usually needs two separate approvals: a county permit that checks zoning, shoreland, floodplain and septic rules, and a building permit from the local municipality that checks the construction against the state codes. Which county permits apply depends on the town and on how close the lot is to the water.

County permits

  • Zoning permits for new structures and uses in the nine county-zoned towns
  • Shoreland zoning permits on waterfront and other shoreland lots in all 14 towns
  • Floodplain permits for building, repair, interior alteration, change of use, filling, grading or paving in a floodplain
  • Sanitary permits for new, replacement, repaired or reconnected private septic systems
  • Filling and grading, signs, conditional uses and shoreland mitigation or impervious surface authorizations
  • Land divisions in all 14 towns, and height checks near Cherryland Airport

Local permits

  • Building permits for new homes and additions, issued by the town, village or city
  • Any local building permit for a commercial building, after state plan approval
  • Zoning inside Sturgeon Bay and the four villages, which county zoning does not cover except for annexed shoreland
  • Driveway permits on town and village roads, from the town or village office

A project started without a required county permit pays double the application fee; a second violation within 36 months pays triple, a third quadruple, and a fourth brings a summons seeking an injunction and penalties.

What the county decides and what the state holds

The county board writes the Comprehensive Zoning Ordinance (adopted in 1995; its latest amendment, Ordinance 2026-02, was adopted February 24, 2026 and took effect April 7, 2026), the shoreland, floodplain, land division and airport height ordinances and Chapter 21 of the county code on private onsite wastewater systems, effective November 2, 2024. Building standards are the state’s: the Uniform Dwelling Code for one- and two-family homes and the Commercial Building Code for everything else, enforced by the municipalities and DSPS. The county holds no UDC delegation of its own.

Door County building department: who handles permitting

Land Use Services has three parts. Zoning staff handle regular zoning permits and prepare conditional use, variance, appeal and amendment files; the Sanitarian office runs the septic program; and Planning staff write the county’s plans and ordinances. The Resource Planning Committee, five county board members, holds the hearings on conditional uses and amendments, the County Board decides amendments, and the Board of Adjustment hears variances and appeals.

Short on time to read all of this?

Get a free quote →
Door County permit contacts
OfficeContact
Land Use Services: Planning & ZoningGovernment Center, 421 Nebraska Street, Sturgeon Bay, WI 54235; 920-746-2323; LUSdepartment@co.door.wi.gov; fax 920-746-2387
Sanitarian (septic)920-746-2308; sanitarian@co.door.wi.gov
HoursMonday to Thursday 7 a.m. to 4:30 p.m.; Friday 7 to 11 a.m.
County Highway (driveways on county roads)Patrol Superintendent, 920-746-2507
WisDOT (driveways on STH 42 and STH 57)Regional office, 920-492-0148
Soil and Water Conservation920-746-2214

Who issues building permits in each municipality

DSPS’s Uniform Dwelling Code delegated-agent list, current as of September 24, 2026, has no county row for Door; all 19 municipalities hold their own delegation. Where the list names an inspection firm, it is shown below.

Door County municipalities and UDC building permits (DSPS list, September 24, 2026; 2025 Census estimates)
MunicipalityWho issues UDC permits
City of Sturgeon Bay (9,917)The city (own delegation); Inspection Specialists listed; city zoning
Villages of Egg Harbor (395), Ephraim (348) and Forestville (460)Each village (own delegation); Inspection Specialists listed
Village of Sister Bay (1,177)The village (own delegation); no inspector named on the list
Towns of Baileys Harbor, Brussels, Clay Banks, Egg Harbor, Gardner, Jacksonport, Nasewaupee, Sevastopol and Sturgeon BayEach town (own delegation); Inspection Specialists listed
Town of Liberty GroveThe town (own delegation); eServices LLC listed
Towns of Forestville, Gibraltar, Union and WashingtonEach town (own delegation); no inspector named on the list

Door County permit types

County zoning, shoreland, floodplain and sanitary applications are filed online through the county’s CitySquared portal, which also lets you research permits already issued; fees can be paid online through Point and Pay.

Residential permits

  • Zoning or shoreland permit. Upload a site plan, every floor plan including basement and loft, at least two elevations showing the basement or crawl space depth, the height from grade to roof peak and the roof pitch, and, for a new principal building, a cross-section and grade sheet. The portal adds a project scope declaration and a wetland notice that the owner signs even where no wetland exists, plus an impervious surface worksheet. The structure and nearest lot lines must be staked, and the Zoning Administrator can require a surveyor’s staking plan and as-built survey.
  • Sanitary permit. A new project that needs a septic system must have its sanitary permit before the zoning permit is issued, and work tied to an existing system may need a reconnect permit. A certified soil tester’s soil and site evaluation and the state POWTS application go with it.
  • Floodplain permit. A surveyor sets an on-site benchmark and reports existing grades, the site plan shows the required fill, and the owner signs the county’s Floodplain Construction Agreement.
  • Shoreland mitigation and impervious surfaces. Lots that exceed shoreland impervious limits or need mitigation use the county’s mitigation handbook and permits.
  • Address. A new parcel address is applied for online with the Land Information Officer, who handles addressing in the towns and three of the four villages.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and other non-residential projects in a county-zoned town need the same zoning or shoreland permit, may need a conditional use permit heard by the Resource Planning Committee, and a sanitary permit where no sewer serves the site. Building plan approval comes from DSPS or a delegated reviewer under the Commercial Building Code before the local building permit is issued.

What comes before the building permit

  • County permits first. The county’s application checklist tells applicants to contact the town’s building inspector for building permit requirements once zoning is settled.
  • Conditional uses and variances. Conditional uses go to a public hearing before the Resource Planning Committee; variances and appeals of zoning decisions go to the Board of Adjustment.
  • Land division. Certified survey maps and plats in all 14 towns are reviewed under the county land division ordinance.
  • Driveway. County highways need a county driveway permit, STH 42 and STH 57 a WisDOT permit, and named town or village roads a permit from the local office.

Door County permit costs and fees

The county’s zoning, land division and septic fees were adopted by the County Board on October 22, 2024 in Resolution 2024-52 and took effect January 1, 2025. A project that needs both a shoreland and a comprehensive zoning permit pays only one fee. Building permit fees are set by each town, village and city.

Rather talk it over?

Call 1-855-478-4290 →
Door County Land Use Services fees (Resolution 2024-52, effective January 1, 2025)
ItemFee
Non-waterfront project needing only a shoreland permit$150
Zoning or waterfront shoreland permit, footprint up to 120 sq ft$150
Footprint 121 to 999 sq ft / 1,000 to 1,999 sq ft$250 / $500
Footprint 2,000 to 4,999 sq ft / 5,000 sq ft and over$750 / $1,000
Use or alteration with no new footprint$250
Filling and grading$500
Floodplain permit$250
Sign permit / permit revision or renewal$150 / $150
Conditional use permit$1,000 ($500 for nonfarm residential lots in the EA district)
Variance$1,250 ($500 for a floodplain extent-of-fill variance)
Shoreland mitigation permit / with stormwater runoff plan$750 / $1,250
Impervious surface authorization$1,250
Appeal / zoning amendment / comprehensive plan amendment$2,000 / $1,250 / $2,500
Minor land division / preliminary plat / final plat$250 plus $50 per lot / $750 plus $50 per lot / $500
Address sign and post$200
Septic, under 3,000 gpd: conventional, mound, at-grade or in-ground pressure$500
Septic: aerobic treatment unit / holding tank$750 / $625
Septic tank replacement / repair / reconnection$250 each
Transfer (property interest) septic inspection$125
Septic systems over 3,000 gpd$1,250

Worked example from the chart: a waterfront house with a 1,600-square-foot footprint that also falls under county zoning pays one $500 permit fee, plus the $500 sanitary permit for a conventional or mound septic system on an unsewered lot. Septic permit renewals cost the original fee less $100, and a revised zoning permit is $150 or the difference between fee categories.

Trade permits and who may pull them

Electrical, plumbing and HVAC permits and inspections for buildings are not issued by Door County; they follow the building permit at the town, village or city, under that municipality’s delegated inspection program and the state’s trade licensing. The county’s part of the plumbing picture is the private septic system.

Rather not deal with the Door County building department?

Get a free quote →
  • Septic installers and plumbers. The Sanitarian office publishes lists of certified soil testers, system installers, evaluators and pumpers working in the county.
  • State review. Septic designs that need state approval are submitted on the state POWTS application; the county issues the sanitary permit.
  • Transfer inspections. A change in property interest can trigger a county septic inspection ($125), and the Sanitarian office will provide an onsite inspection letter on request.
  • Building contractors. A contractor-built house needs state Dwelling Contractor credentials on the local permit; owner-occupants are exempt.

How to apply for a Door County permit

1. Identify the municipality and zoning layers

Look the parcel up on the county GIS maps and call 920-746-2323 to confirm whether county zoning, shoreland, floodplain or the airport height rules apply.

2. Get the septic permit

On an unsewered lot, have a certified soil tester and plumber prepare the evaluation and design, and obtain the sanitary permit first.

3. Stake the site

Stake the structure and the nearest lot lines before the zoning review.

4. Apply online

File the zoning, shoreland or floodplain application in CitySquared with the plans and signed supplemental forms.

5. Pay and receive the permit

Pay online or at the office; the zoning permit is good for one year.

6. Apply for the local building permit

Take the county permit to the town, village or city building inspector for the UDC or commercial building permit.

Review, corrections and what causes delay

Shoreland and floodplain lots carry extra requirements that depend on the site, so the county asks applicants to call the Zoning Administrator before planning such a project. Projects needing a conditional use or variance wait for a public hearing. A zoning permit expires one year after issue; if substantial work is done, apply to renew before it lapses, because after expiry a new application is required.

Inspections in Door County

The structure and nearest lot lines must be staked for the county’s zoning review, and the Sanitarian office inspects septic installations under Chapter 21. Floodplain construction is checked against the surveyed elevations: the lowest floor of a home must be at or above the flood protection elevation, with 15 feet of fill around the house at least one foot above the regional flood elevation, and any crawl space dry-floodproofed under a certified plan.

Building inspections (footings, framing, rough-ins, insulation and final occupancy for new homes) are done by the municipality’s UDC inspector, often a contracted firm such as those named on the DSPS list above. Call the town, village or city office for scheduling and for its building permit fee.

Wisconsin building code in Door County

All Door County municipalities administer the Uniform Dwelling Code under their own DSPS delegations, while the county regulates land use, water frontage and septic systems. FEMA’s Community Status Book lists Door County (community 550109) as participating in the National Flood Insurance Program, with flood maps effective May 8, 2024; the department posts FEMA’s May 9, 2024 list of letters of map change, and the county floodplain ordinance was updated April 2, 2024.

Want this handled start to finish?

Get a free quote →

Wisconsin's Uniform Dwelling Code covers one- and two-family homes. Its Commercial Building Code covers public buildings, workplaces and buildings of three or more units. Local ordinances must conform to both. Wisconsin rules

Door County permit search and official resources

The county moved permitting to its CitySquared system on August 23, 2021, and basic details of earlier permits can also be looked up there, but much of the information in the department’s paper files has not been digitized. For older files, septic records or an onsite inspection letter, contact the zoning or Sanitarian office. Building permit records are held by the municipality that issued them.

Inspections are where schedules slip.

Get a free quote →

Door County building permit FAQs

Does Door County issue building permits?

No. The county issues zoning, shoreland, floodplain and septic permits; the town, village or city issues the building permit, and all 19 hold their own UDC delegation.

Is my town under county zoning?

Nine of the 14 towns use the county Comprehensive Zoning Ordinance; shoreland, floodplain and land division rules apply in all 14. Call Land Use Services at 920-746-2323 to confirm for your parcel.

How much is a county zoning permit for a house?

It depends on the footprint: $500 for 1,000 to 1,999 square feet, $750 for 2,000 to 4,999, with one fee when both shoreland and zoning permits apply.

Do I need the septic permit first?

Yes. A new project needing a private septic system must have its sanitary permit before the county issues the zoning permit.

What does a septic permit cost?

$500 for a conventional, mound, at-grade or in-ground pressure system under 3,000 gallons a day, $625 for a holding tank and $750 for an aerobic treatment unit.

How long is a zoning permit valid?

One year from issue; renew before it expires if substantial work is done.

Who issues a driveway permit?

The county highway department on county roads, WisDOT on STH 42 and 57, and the town or village on local roads.

What if I build in a floodplain?

You need a $250 county floodplain permit, a surveyed benchmark and a lowest floor at or above the flood protection elevation.

Simplify Door County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Wisconsin. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Door County sooner?

Let Alliance prepare, file, and track your Door County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Door County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.