Building permits in South Park Township come from the township’s own Building Department (Building Inspector and Code Enforcement Office) in the Administration Building, 2675 Brownsville Road, open 9:00 a.m. to 5:00 p.m. on weekdays at 412-831-7000. Under the township’s Master Fee Schedule, last amended in April 2023, a residential building permit is $40 for the first $1,000 of construction cost plus $6 for each additional $1,000, and simply reshingling a roof needs no permit.
What requires a building permit in South Park Township?
The township publishes its own list of work that needs a permit and reminds owners that getting the right permits is the homeowner’s responsibility even when a contractor is hired. The list reaches well past structural work, so outdoor projects such as patios, fences and air conditioners need a stop at the Building Department too.
Permit needed
- Replacing, enlarging, altering, repairing or demolishing an existing structure
- Additions
- Decks, fences, gazebos and on-ground patios
- Pools holding more than 24 inches of water, whether in-ground, above-ground or temporary, and hot tubs
- Utility sheds and air conditioners
- Electrical work: new wiring, rewiring or a service upgrade
- Grading a lot and excavating in the street right-of-way
- Roof work that changes the structure, such as a skylight or roof extension
- A dumpster, bagster or portable storage pod
No building permit
- Reshingling a roof with no structural change
Driveways, fences, sheds, air conditioning units and other accessory structures are priced as zoning permits on the fee schedule, while decks, additions, pools and alterations take building permits. Portable storage containers and temporary dumpsters have been regulated since Ordinance No. 698 was adopted on May 11, 2020.
What South Park decides and what the state holds
South Park Township opted in to enforce the statewide Uniform Construction Code on June 14, 2004, with no local amendments, according to the Department of Labor and Industry’s municipal list. The township decides its zoning (Chapter 137 of the township code), its subdivision and land development ordinance (Chapter 118 of the township code), grading, street opening, storage container and property maintenance rules, and its fees. In August 2026 the Board of Supervisors adopted Ordinance No. 723, which amends Chapter 118 to require multiple vehicle access points for developments, change sidewalk requirements, add block length and configuration standards and set rules for waivers and modifications.
Short on time to read all of this?
Get a free quote →South Park Township building department: who handles permitting
The Building Inspector and Code Enforcement Office sits in the Administration Building with the Manager’s Office and the Sewer Rental and Refuse Billing Office. The township’s Code Enforcement Officer is also its Building Code Official; after the previous official resigned in January 2026, the Board of Supervisors hired a new Code Enforcement Officer and Building Code Official who started on April 14, 2026. Board minutes from December 2025 show Middle Department Inspection Agency (MDIA), a certified third-party agency, doing plan review and inspections on one development; the township’s pages do not say which agency, if any, handles house permits, so ask the Building Department.
| Detail | Information |
|---|---|
| Office | Building Inspector / Code Enforcement Office, Administration Building, 2675 Brownsville Road, South Park, PA 15129 |
| Phone | 412-831-7000 |
| Hours | 9:00 a.m. to 5:00 p.m., Monday through Friday |
| Township email | southparktwp@southparktwp.com |
| Plumbing permits | Allegheny County Health Department Plumbing Program: main office 412-578-8123; in-person permits at 2121 Noblestown Road, Room 207, Pittsburgh (412-578-8036) |
South Park Township permit types
The township’s building requirements notice tells owners and contractors to obtain permits, ask questions and check whether a project needs a permit by contacting the Building Department. The fee schedule shows the permit families the township issues: zoning permits, residential and non-residential building permits, demolition, occupancy, pools and spas, signs, dumpsters, grading, street openings, sewer tap-ins, electrical, mechanical and energy inspections, and plan review.
Residential permits
House permits, including solar panels, are priced on the cost of construction. Plan review is free for porches and decks, carports, garages and additions up to 1,000 square feet, and costs $132 for a new single-family house up to 3,500 square feet. A new house also pays electrical ($192), mechanical ($120) and energy ($96) inspection fees, a $50 occupancy permit and a $200 occupancy security deposit. Pools are flat fees: $425 in-ground, $244 above-ground, $144 for a temporary pool, and $244 for a spa or hot tub.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Non-residential building permits are charged by area: $0.19 per square foot for new construction and $0.12 per square foot for renovations, with additions over 500 square feet charged at the new-construction rate. Commercial plan review needs a $188 minimum escrow deposit and runs 0.157% of construction value up to $1 million, with lower marginal rates above that; accessibility review is $182 up to $500,000 of value. An industrial or commercial occupancy permit is $100. A home occupation needs a $25 annual permit, and a storage trailer kept on a property is charged $500 a year for each trailer.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Accessory structures, driveways, fences, sheds and air conditioners take a $30 zoning permit, and a zoning certification is $30. Appeals and special exceptions before the Zoning Hearing Board cost $200 for residential and $500 for non-residential cases.
- Subdivision and land development. Applications carry $200 filing fees and a minimum $1,200 review escrow, and must meet the Chapter 118 standards as amended by Ordinance No. 723 in 2026.
- Grading. Grading a lot needs a permit: a $100 application fee, a $750 review escrow and a permit fee by volume, starting at $80 for 10 to 1,000 cubic yards, with a performance bond of 50% of the estimated cost and a two-year maintenance bond of 15%.
- Sewer. A sewer tap-in permit is $2,500, and the sewage treatment plant serving the property may add its own fee; engineering review and legal work are at the applicant’s expense.
- Street work. Excavating in the street right-of-way needs a street opening permit ($65, plus $25 for each additional 100 feet).
South Park Township permit costs and fees
The fees below are from the Master Fee Schedule for the Township of South Park, marked as amended April 10, 2023 and linked from the township’s home page as the Township Fee Schedule. It is the newest fee schedule the township posts.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Residential building permit (incl. solar) | $40 up to $1,000 + $6 per additional $1,000 or part |
| Non-residential building permit | $0.19 per sq ft new; $0.12 per sq ft renovation |
| State building permit fee | $4.50 |
| Zoning permit (driveways, fences, sheds, A/C units, accessory structures) | $30 |
| Residential plan review | $132 new house up to 3,500 sq ft; no charge for decks, garages and additions up to 1,000 sq ft |
| Electrical inspection | $192 new home; $120 200-amp service upgrade; $96 temporary power |
| Mechanical / energy inspection, new house | $120 / $96 |
| Demolition | $55 |
| Occupancy permit | $50 new house; $100 commercial or industrial |
| Pool | $425 in-ground; $244 above-ground; $144 temporary |
| Spa or hot tub | $244 |
| Dumpster permit / sign permit | $25 / $30 |
| Sewer tap-in | $2,500 plus any plant fee |
| Zoning Hearing Board appeal or special exception | $200 residential; $500 non-residential |
| Grading permit | $100 application + $750 review escrow + $80 (10–1,000 cu yd), $230 (1,001–5,000), $355 (5,001–10,000) |
| Street opening | $65 + $25 per additional 100 ft; $65 street crossing |
| UCC Board of Appeals | $175 residential; $225 commercial |
| Rezoning | $500 |
A worked example from the residential row: a $15,000 deck costs $40 for the first $1,000 plus 14 × $6 for the remaining $14,000, or $124, and adds the $4.50 state fee for $128.50. There is no plan review charge for a deck. A $15,500 project would count the last $500 as a part of $1,000 and pay one more $6 step.
Trade permits and who may pull them
- Electrical: any new wiring, rewiring or service upgrade needs a permit; the township charges for electrical inspections, from $120 for a 200-amp service upgrade to $192 for a new home, and $150 to reintroduce power to an existing structure.
- Mechanical and energy: new houses pay a $120 mechanical inspection and a $96 energy inspection; air conditioners need a zoning permit for placement.
- Plumbing: issued by the Allegheny County Health Department, which requires an approved plumbing plan before plumbing is installed or altered and makes a final inspection on every permit.
- Solar: residential solar panels are priced on the residential building permit scale.
The township’s pages show no local license for contractors or tradespeople; home improvement contractors register with the Attorney General under the state’s home improvement law.
Rather not deal with the building department?
Get a free quote →How to apply for a South Park Township building permit
Ring 412-831-7000 to confirm which permits the project needs and get the forms.
Accessory structures, fences and driveways start with a $30 zoning permit; variances go to the Zoning Hearing Board.
Bring drawings and the construction cost; new houses up to 3,500 square feet pay $132 for plan review.
Grading, street opening, sewer tap-in and dumpster permits are separate.
Submit plumbing plans to the Allegheny County Health Department.
Pay the township fees and the $4.50 state fee, then schedule inspections as work proceeds.
Review, corrections and what causes delay
Open plan review comments hold up inspections, so answer them before calling for the next stage. Under the state code a residential application must be decided within 15 business days and a commercial one within 30, unless extended in writing. Large developments also face the 2026 Chapter 118 standards on access points, sidewalks and block length.
Inspections in South Park Township
The township’s pages do not set out an inspection booking procedure or cut-off; the Building Department at 412-831-7000, open 9:00 a.m. to 5:00 p.m. on weekdays, is its contact for building matters. The fee schedule prices the separate electrical, mechanical and energy inspections for a new house, and the occupancy permit is issued at the end of new residential construction ($50) or for commercial and industrial space ($100), and new construction also posts the $200 occupancy security listed on the schedule.
An owner or contractor who disagrees with a decision of the Building Code Official under the construction code can appeal to the township’s UCC Board of Appeals, which costs $175 for a residential case and $225 for a commercial one; zoning decisions go to the Zoning Hearing Board instead. The township’s pages do not describe a resale occupancy inspection; its published building requirements also cover property upkeep, such as house numbers at least 4 inches high, grass no taller than 12 inches and vehicles parked only on paved surfaces.
Pennsylvania building code
South Park Township’s election to enforce the Uniform Construction Code dates from June 14, 2004, and it adopted no local amendments; the township’s own ordinances, including the zoning and subdivision chapters, are published as the Code of the Township of South Park on eCode360. FEMA’s Community Status Book includes South Park Township (community 421165) in the list of participating National Flood Insurance Program communities, with a current flood map dated September 26, 2014.
Want this handled start to finish?
Get a free quote →Pennsylvania has one Uniform Construction Code for the whole state, based on the 2021 International Codes since January 1, 2026. Most municipalities enforce it themselves or through a certified third-party agency; where a municipality has opted out, the Department of Labor and Industry handles commercial work and home owners hire a certified agency. Counties do not issue building permits. Pennsylvania rules
South Park Township permit search and official resources
South Park does not offer an online permit search; the Building Department holds the records, and a written zoning certification costs $30. Right-to-Know requests go to the township’s Open Records Officer on the Pennsylvania Standard Right-to-Know Request Form, by mail to 2675 Brownsville Road, by email to southparktwp@southparktwp.com or by fax to 412-831-0425.
- South Park Township official website
- Building requirements: when a permit is required
- Master Fee Schedule (amended April 10, 2023)
- Township contacts and hours
- Board of Supervisors minutes
- Minutes, April 13, 2026 (Building Code Official hired)
- Minutes, August 10, 2026 (Ordinance No. 723)
- Ordinance No. 698, portable storage containers
- Planning Commission agenda, October 28, 2026 (draft data center amendment)
- Allegheny County Health Department plumbing permits
- L&I municipal UCC elections list
- FEMA Community Status Book, Pennsylvania
Inspections are where schedules slip.
Get a free quote →South Park Township building permit FAQs
How much is a building permit in South Park Township?
For residential work, $40 for the first $1,000 of construction cost and $6 for each additional $1,000 or part, plus the $4.50 state fee.
Do I need a permit to replace my roof?
Not if you are only reshingling. Structural changes such as adding a skylight or extending the roof need a permit.
Does a fence or shed need a permit?
Yes. Fences, sheds, driveways and air conditioners are on the township’s permit list and are charged as $30 zoning permits.
Do above-ground pools need a permit?
Yes, any pool holding more than 24 inches of water, including temporary pools; fees run from $144 to $425.
Do I need a permit for a dumpster?
Yes. Dumpsters, bagsters and storage pods need a $25 permit before they are placed.
Who issues plumbing permits?
The Allegheny County Health Department, not the township.
Is South Park changing its zoning for data centers?
A draft amendment to Chapter 137 would allow data centers as conditional uses in the two industrial districts. It was on the Planning Commission’s October 28, 2026 agenda, the Board of Supervisors has a public hearing on it set for November 9, 2026 at 6:30 p.m., and it has not been adopted.
What are the Building Department’s hours?
9:00 a.m. to 5:00 p.m., Monday through Friday, at 2675 Brownsville Road.
Simplify South Park Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Pennsylvania. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in South Park Township sooner?
Let Alliance prepare, file, and track your South Park Township permits while your crew stays on the job.
More Pennsylvania permitting guides
Allegheny County
Read guide →Upper St. Clair Township
Read guide →West Mifflin
Read guide →South Union Township Building Permit Guide
Read guide →Spring Garden Township Building Permit Guide
Read guide →Springettsbury Township Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about South Park Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.