Skip to main content
Municipal GuidePennsylvaniaJohnstown · Cambria County

Johnstown, Pennsylvania Building Permit Guide

To get a building permit in Johnstown, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Johnstown is a member of the Laurel Municipal Inspection Agency, which acts as the city’s building code official and handles its residential and commercial building permits and zoning from Carrolltown.

Authority: Laurel Municipal Inspection Agency (for the city)Code: Uniform Construction Code, opted in June 10, 2004Phone: 814-471-0424
Permits & zoning
Laurel Municipal Inspection Agency814-471-0424; weekdays 8–4
House permit
$59.50Residential UCC or non-UCC building permit
City codes office
401 Main Street814-539-2504; rentals and contractor licenses
Started without a permit
Fee doubledCity permit fee rule

In the City of Johnstown, building and zoning permits run through the Laurel Municipal Inspection Agency (LMIA), the inter-municipal code agency the city belongs to, which also serves as the city’s building code official. Applications go to LMIA’s office in Carrolltown (814-471-0424). A residential building permit costs $59.50, commercial permits follow a value table, and the city’s own Code Enforcement office at 401 Main Street handles rental registration and the commercial contractor license.

What requires a building permit in Johnstown?

The city’s rule is wide. A building or demolition permit is required for all demolition, repairs, renovations, remodels and new construction in Johnstown; the only work the permit page leaves out is painting and flooring. Anyone who starts covered work without a city-issued permit can be served a stop work order, and the permit fee is doubled for projects begun before the permit was issued.

Permit needed

  • New houses, commercial buildings and additions
  • Repairs, renovations and remodels, inside or out
  • Decks, garages, pole buildings and above-ground pools (LMIA has a worksheet for each)
  • Roof replacement (LMIA’s residential form asks for a receipt for disposal of the old roofing)
  • Demolition of any building or part of one
  • Erecting, altering or moving any sign

No building permit

  • Painting and flooring
  • Public notices from government agencies, and signs inside a building that are not on a window or door
  • Art without a commercial message, scoreboard and athletic-field signs, private traffic signs and project identification signs of a regulated size

Signs must also follow the zoning rules for their district, may not hang over a street or right-of-way, and yard-sale posters may not go on utility poles or street trees. All commercial projects, and some residential ones, need drawings and specifications stamped by a Pennsylvania-registered architect or engineer.

What Johnstown decides and what the state holds

The building standards are the state’s Uniform Construction Code. Johnstown opted in to enforce it locally from June 10, 2004, and L&I’s list shows the city kept local amendments that predate the UCC. The city chose to carry out that duty through LMIA. City Council keeps the local layers: the zoning ordinance and map, the Planning Commission and Zoning Hearing Board, the stormwater and sewer-lateral ordinances, rental registration, contractor licensing and the permit fee schedule printed on the city’s permit page.

Johnstown building department: who handles permitting

LMIA’s legal name is the Cambria County Building Codes Enforcement Agency; it was set up by inter-municipal agreements among its members to administer the UCC, and it also inspects floodplain, driveway, zoning and property maintenance matters for participating towns. Its member list covers several dozen municipalities in Cambria, Clearfield, Indiana, Somerset and Westmoreland counties, with the City of Johnstown among them. The city’s permit page sends every permit question to LMIA.

Short on time to read all of this?

Get a free quote →

The City’s Codes Department, led by Codes Director Matthew Krawczyk, stays responsible for property maintenance under the International Property Maintenance Code, rental registration and inspection, and contractor licenses. Each part of the city has its own assigned code enforcement officer.

Johnstown permit contacts
DetailInformation
Building permits, zoning, inspectionsLaurel Municipal Inspection Agency, 140 E. Carroll Street, Suite 202, P.O. Box 375, Carrolltown, PA 15722
LMIA phone and email814-471-0424 (fax 814-471-6801); info@LMIAgency.org
LMIA hoursMonday to Friday, 8:00 a.m. to 4:00 p.m.
City Codes DepartmentCity Hall, 401 Main Street, Johnstown, PA 15901; 814-539-2504 (Codes Director ext. 103)
Code appealsUCC Board of Appeals, application filed with the Building Code Official

Johnstown permit types

LMIA publishes one residential application and one commercial application, each covering the building work and the trades together, plus drawing worksheets for common house projects. The city adds the demolition permit, sign permit, rental registration and commercial contractor license.

Residential permits

The residential application is for one- and two-family dwellings. It asks for the owner, the principal contractor and the contractor’s home improvement (HIC) number, a description of the work and the estimated construction cost at reasonable fair market value. It also collects the heating type, whether water and sewer are public or private, fireplaces, existing and proposed floor areas, the number of bedrooms and the electrical service size, utility company work-order number and electrician. LMIA’s 2023 worksheets cover decks with and without roofs, cantilevered decks, garages, pole buildings, additions and above-ground pools. The deck sheet asks for joist, beam, post and footing sizes and shows a guard wherever the floor is 30 inches or more above the ground; the pool sheet sets out the electrical bonding, including a #8 AWG solid copper bonding conductor and bonding of the pool water.

Commercial permits

The commercial application covers new buildings, additions, alterations, demolition and changes of use group, with the occupancy classification checked from A-1 to U. It asks whether the municipality has zoning and whether the zoning permit has been obtained, whether the site is in a flood hazard area (with the IBC 1612.5 flood certification attached if so), and the bid cost of the building, plumbing, mechanical and electrical work separately. Commercial drawings must carry a Pennsylvania architect’s or engineer’s stamp.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Johnstown has 14 zoning classifications on an interactive map; the city tells owners to ask the Building Code Official what their property is zoned before any development, alteration or addition.
  • Site plan review. Every new construction project gets one of three reviews: administrative staff review, a conceptual or sketch plan review, or full site plan review, which is required for principal buildings in commercial, industrial and public districts, for projects that change the land use shown on the zoning map and for projects needing added utilities or infrastructure. The nine-member Planning Commission meets the first Tuesday of each month at the Public Safety Building on Washington Street.
  • Zoning Hearing Board. Variances and appeals from zoning decisions.
  • Stormwater. Ordinance No. 5160 (effective January 1, 2015) governs land development and earth disturbance; contact the city before construction to learn whether a stormwater plan, permit or inspection applies.
  • Sewer laterals. Ordinance No. 5152 (August 13, 2014) requires owners to televise or pressure test private sewer laterals and repair those that fail, ending with a Certificate of Sewage Compliance.
  • Floodplain and historic sites. LMIA’s form asks about flood hazard areas and the lowest floor level, and warns that work in a historic district may need a certificate of appropriateness from the municipality. Driveways onto state roads need a PennDOT Highway Occupancy Permit.

Johnstown permit costs and fees

The city prints its building permit fees on its permit page. Every commercial fee is quoted “plus state UCC tax”, the $4.50 state fee; the residential figure of $59.50 matches a $55 fee plus that $4.50.

City of Johnstown building permit fees
ItemFee
Residential building permit, UCC or non-UCC work$59.50
Commercial, project value $1–$1,000$55 + state fee
Commercial, $1,001–$5,000$100 + state fee
Commercial, $5,001–$10,000$150 + state fee
Commercial, $10,001–$25,000$200 + state fee
Commercial, $25,001–$50,000$300 + state fee
Commercial, $50,001–$100,000$400 + state fee
Commercial, $100,001–$250,000$600 + state fee
Commercial, $250,001 and up0.5% of project value + state fee
Demolition1% of the demolition contract + $150 sewer cap fee + $4.50
Work started before the permitPermit fee charged double
UCC Board of Appeals application$400, non-refundable
Pennsylvania UCC state fee$4.50 per permit

Rather talk it over?

Call 1-855-478-4290 →

Worked examples from the table: a $40,000 commercial fit-out falls in the $25,001–$50,000 band and costs $300 plus $4.50, or $304.50; a $600,000 commercial building costs 0.5% of $600,000, $3,000, plus $4.50. A demolition under a $20,000 contract costs $200 plus the $150 sewer cap fee and $4.50, so $354.50.

Rental and license fees

All rental units must be registered with Code Enforcement, and the city waives the registration fee. Rental inspections cost $50 for a single-family dwelling, $150 for a duplex or two-family dwelling, $150 for a multi-family dwelling and $1,500 for a halfway house; an owner of 10 or more units pays $50 per unit. Extra contractor vehicle decals cost $2 each.

Trade permits and who may pull them

Johnstown does not run separate city trade offices. Electrical, plumbing and mechanical work is part of the UCC permit LMIA reviews: the residential form takes the electrical service details and the heating system, and the commercial form lists the plumbing, mechanical and electrical bid costs beside the building cost. LMIA inspects the trade work with the rest of the job.

  • Who may apply. Building and demolition permits are issued to the owner, an authorized agent or the contractor doing the work; LMIA’s form also accepts the lessee or the registered design professional on the job.
  • Commercial contractor license. Every contractor and subcontractor on a commercial building or repair project in the city needs a City of Johnstown contractor license, including construction, alteration, repair, sign, site preparation, excavation, paving and demolition work. The registration form needs proof of workers’ compensation and liability insurance, or a notarized statement that the contractor has no employees. The license runs for the calendar year with no pro-rating, one vehicle decal comes with it, and the Building Code Official reviews contractor records before approving permits or renewals.
  • Workers’ compensation. LMIA needs a certificate of insurance or an affidavit of exemption with any application where a contractor does the work.
  • Home improvement registration. Contractors on houses list their state HICPA number on the LMIA form.

The city’s code enforcement pages list no separate electrician or plumber license beyond the commercial contractor license.

Rather not deal with the building department?

Get a free quote →

How to apply for a Johnstown building permit

1. Confirm zoning

Find the district on the city’s interactive zoning map and ask LMIA, as Building Code Official, which approvals the project needs.

2. Clear site plan or board review

Larger projects go through staff, sketch or full site plan review with the Planning Commission; variances go to the Zoning Hearing Board.

3. Check stormwater and sewer

Ask the city whether Ordinance 5160 stormwater rules apply, and plan any lateral testing the sewer ordinance requires.

4. Fill in LMIA’s form

Use the residential application or the commercial application and the matching worksheet, with stamped drawings where required.

5. Add insurance proof

Attach the contractor’s workers’ compensation certificate or the exemption affidavit, and a commercial contractor license for commercial jobs.

6. Return it to LMIA

Send the signed application to the Carrolltown office and pay the fee the agency assesses.

7. Inspect and occupy

Call LMIA for each inspection and obtain the occupancy permit when the UCC work passes.

Review, corrections and what causes delay

State rules give a residential application 15 business days for a decision and a commercial one 30, unless the applicant agrees in writing to more time. In Johnstown the common hold-ups are missing stamped drawings on commercial work, an absent roofing disposal receipt or insurance certificate on house jobs, and a commercial contractor without a current city license. Timing also matters after issue: the city’s permit page says building permits expire after 60 days and demolition permits after 30, with extensions possible for demolition, while the state UCC rules let a permit lapse when work has not started within 180 days of issue or stops for 180 days, so confirm with LMIA which date it applies to your permit.

Inspections in Johnstown

LMIA inspects all UCC work in the city, and the city states that every UCC project is inspected for compliance before an occupancy permit is issued. Inspection requests go to LMIA’s office during its weekday hours, since the city refers all permit questions to the agency.

Code appeals go to the city’s Uniform Construction Code Board of Appeals. The application, revised January 29, 2020, is filed with the Building Code Official, costs $400 and is complete only when the fee is paid; it can appeal a decision of the Building Code Official or ask for a variance or more time, though action on unsafe buildings may not be stayed.

Rental inspections

Johnstown has thousands of rental units, and each must be registered with the Code Enforcement Office. The city updated its rental inspection ordinance to waive registration fees and lower inspection costs, and inspections check the required safety features. The city’s pages do not describe an inspection at the sale of an owner-occupied house.

Pennsylvania building code in Johnstown

Johnstown enforces the Uniform Construction Code through LMIA under its June 10, 2004 opt-in. FEMA’s Community Status Book lists the City of Johnstown (community 420231) as participating in the National Flood Insurance Program, with flood maps effective June 19, 2012, and LMIA’s forms require floodplain work to meet the program and the state Flood Plain Management Act.

Want this handled start to finish?

Get a free quote →

Pennsylvania has one Uniform Construction Code for the whole state, based on the 2021 International Codes since January 1, 2026. Most municipalities enforce it themselves or through a certified third-party agency; where a municipality has opted out, the Department of Labor and Industry handles commercial work and home owners hire a certified agency. Counties do not issue building permits. Pennsylvania rules

Johnstown permit search and official resources

There is no public online permit search. For permits, inspections and occupancy records on a property, ask LMIA or the city’s Codes Department. Formal requests for city records go through the Right to Know page, and the city accepts them only on the official form of the state Office of Open Records. Council agendas and minutes, including ordinances on codes and fees, are posted on the city site.

Inspections are where schedules slip.

Get a free quote →

Johnstown building permit FAQs

Who issues building permits in Johnstown?

The Laurel Municipal Inspection Agency, the code agency the city belongs to. It serves as the Building Code Official and handles residential and commercial permits and zoning; call 814-471-0424.

How much is a building permit for a house in Johnstown?

The city lists $59.50 for a residential permit, whether or not the work falls under the UCC. The fee doubles if work started before the permit was issued.

Do I need a permit to replace my roof in Johnstown?

Yes. The city requires a permit for all repairs and renovations except painting and flooring, and LMIA’s residential form asks every roofing job for a receipt for disposal of the old roofing.

Do contractors need a Johnstown license?

Contractors and subcontractors working on commercial building or repair projects need a city contractor license for the calendar year, with insurance proof. Home improvement contractors also list their state HICPA number on LMIA’s form.

What does a demolition permit cost in Johnstown?

One percent of the demolition contract, plus a $150 sewer cap fee and the $4.50 state fee. Demolition permits expire after 30 days but may be extended in some cases.

Do I have to register a rental in Johnstown?

Yes. Every rental unit must be registered with Code Enforcement; registration is free, and inspections start at $50 for a single-family home.

How do I appeal a Johnstown building code decision?

File the Building Codes Appeals application with the Building Code Official and pay the $400 non-refundable fee; the UCC Board of Appeals hears it.

Simplify Johnstown permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Pennsylvania. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Johnstown sooner?

Let Alliance prepare, file, and track your Johnstown permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Johnstown permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.