Skip to main content
Municipal GuidePennsylvaniaChambersburg · Franklin County

Chambersburg, Pennsylvania Building Permit Guide

To get a building permit in Chambersburg, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In Chambersburg, building work starts with a free borough Land Use Permit at Borough Hall, after which Pennsylvania Municipal Code Alliance, the borough’s third-party code agency, issues the UCC permit and inspects.

Authority: Land Use & Community Development + PMCAFees: Master Fee Schedule, May 11, 2026Phone: 717-251-2417
Borough step
Land Use PermitNo fee; Borough Hall, 2nd floor
Code agency
PA Municipal Code Alliance717-496-4996
New house inspections
$665 (PMCA)Plus application and plan review
Trades
Borough licensesElectricians and plumbers

In the Borough of Chambersburg, Franklin County, building permits are a two-step process: the Land Use & Community Development Department at Borough Hall, 100 South Second Street (717-251-2417), approves a free Land Use Permit, and then Pennsylvania Municipal Code Alliance (PMCA), the borough’s state-certified third-party code agency (717-496-4996), issues the UCC permit, plumbing permit and certificate of occupancy. Electricians and plumbers must hold borough licenses, and PMCA’s fees are those Town Council approved in its Master Fee Schedule on May 11, 2026.

What requires a building permit in Chambersburg?

The borough’s Land Use Permit is the entry point for almost every project. It is needed to build, remodel or demolish a structure, to put up a sign or billboard, to build a parking lot, or to change the use of a building or lot, and the borough lists it for new buildings, additions, remodeling and changes in the use of commercial buildings.

Borough approvals

  • Land Use Permit for building, remodeling, demolition, signs, parking lots and changes of use (no fee)
  • Electric permit for regulated electrical work under Chapter 135 (no fee, borough-licensed electrician)
  • Excavation permit for any digging in a street; curb, sidewalk and driveway ramp permits
  • Water and sewer connection permits, paid at Borough Hall
  • Zoning variances from the Zoning Hearing Board

PMCA permits

  • UCC building permit and inspections
  • Borough plumbing permit for work inside a home or business
  • Certificate of occupancy, including temporary certificates
  • Fire, sprinkler and alarm licenses
  • Flammable liquid storage, blasting and fire code permits

PMCA’s 2026 residential fee sheet shows the small projects it prices individually, which gives a practical list of work it inspects at houses: decks, fences and retaining walls, small prefabricated sheds under 500 square feet, demolition, above-ground and in-ground pools and electrical service upgrades. A new driveway on a state route also needs a PennDOT permit, and digging in a state route may need one.

What Chambersburg decides and what the state holds

L&I’s list shows the borough opted in to the UCC on June 28, 2004 with local amendments, and the borough has appointed PMCA as its certified third-party agency. Town Council sets the Master Fee Schedule, including PMCA’s rates, appoints the Planning & Zoning Commission, Zoning Hearing Board and Building Code Board of Appeals, and licenses electricians and plumbers through its examining boards. Because Chambersburg runs its own electric, gas, water and sewer utilities, several utility departments sign off on each Land Use Permit.

Short on time to read all of this?

Get a free quote →

Chambersburg building department: who handles permitting

The Land Use & Community Development Department covers planning, zoning, community and economic development and the building, health and property maintenance codes. Its Planning and Zoning Office processes Land Use Permits and Zoning Hearing Board appeals, and its Codes Office handles property maintenance and rental housing. The Uniform Construction Code itself is enforced by PMCA, whose staff also enforce the rental property code with the Codes Office’s support. The department is led by Phil Wolgemuth, Deputy Borough Manager and Land Use and Community Development Director.

Chambersburg permit contacts
DetailInformation
Land Use PermitsPlanning and Zoning, Borough Hall (second floor), 100 South Second Street, Chambersburg, PA 17201; 717-251-2417
Borough Hall hoursMonday to Friday, 8 a.m. to 5 p.m.; main line 717-264-5151
UCC permits and inspectionsPennsylvania Municipal Code Alliance, 1013 Wayne Avenue, Chambersburg (per the 2026 Land Use form; the borough’s plumbing sheet gives 405 Wayne Avenue and PMCA’s fee sheets 380, so call first); 717-496-4996
Electric permitsBorough Service Center, 80 South Franklin Street; 717-263-4111
Trade license examsBorough Hall, second floor; 717-251-2430
Street, curb and sidewalk permitsPublic Works, Borough Hall; 717-251-2471

Chambersburg permit types

The 2026 Land Use Permit Application asks for the address, owner, contractor, project type (new, addition, demolition, interior commercial or sign), land use, lot size, parking spaces, building dimensions, height and estimated cost, signed by the owner. A site plan must show all property lines, the distance to the work and every existing building. Borough staff from customer service, electric, gas, public works, planning and zoning, stormwater and water and sewer review it and mark which further approvals are needed, such as a new utility account, a borough electric permit, a net metering application, a drainage plan, a DEP sewage planning module or PMCA’s UCC permit and certificate of occupancy.

Residential permits

  • New houses go through PMCA’s standard inspection set, from footings to final, and the final must be ready within a year or a processing fee applies.
  • Decks, fences, sheds, pools and demolition are priced by PMCA as small projects by the number of inspection trips, from one for a shed or demolition to four for an in-ground pool (footer, bonding, underground plumbing and final).
  • Plumbing inside a house needs a PMCA plumbing permit, pulled by a borough-licensed plumber; service lines outside the house are permitted by the Borough Service Center.
  • Gas appliances on the borough’s gas system use the residential gas appliance installation form.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

New commercial buildings and changes of use must include electric and plumbing plans with the Land Use Permit, and a change of use also needs a floor plan showing doors, windows and restrooms. PMCA prices commercial inspections from the construction cost (0.2% up to $2 million), the expected project length and the number of trades, plus an $80 application charge; changes of occupancy are $170 under 8,000 square feet and $200 above. Restaurants also need a borough retail food facility license, and signs need a plan with dimensions, graphics and location.

What comes before the building permit

  • Zoning. The Land Use Permit is the zoning check. Relief from setbacks, parking and other rules goes to the Zoning Hearing Board for a $250 appeal fee.
  • Land development. Plans creating lots or developing land go to the Planning & Zoning Commission and then Town Council for approval.
  • Stormwater. Where a drainage plan is needed, the borough invoices the review costs of its staff and consulting engineers under Chapter 251 of the borough code; the borough’s storm water consultant reviews development drainage plans.
  • Water and sewer. Connection permits are paid at Borough Hall, and the signed receipt is taken to PMCA to obtain the plumbing permit.
  • Streets. Excavations, curbs, sidewalks and driveway ramps need borough permits, and new driveways on state routes need PennDOT permits.

Chambersburg permit costs and fees

Town Council adopted the current Master Fee Schedule on May 11, 2026. The Land Use Permit is free; PMCA’s 2026 residential, commercial, electrical and supplemental fee sheets are attached to the schedule, and PMCA notes that its listed fees cover inspections only, not plan review, the state fee, the application fee or any municipal fee.

Chambersburg permit fees (Master Fee Schedule, May 11, 2026)
ItemFee
Borough Land Use PermitNo charge
PMCA application fee$50 residential; $80 commercial
PMCA residential plan review$50 per hour, one-hour minimum
PMCA new house inspections (footings to final)$665 without sprinkler or under-slab inspections; $10 per 100 sq ft over 3,500 sq ft
PMCA deck / fence or retaining wall / shed$195 / $135 / $75
PMCA pool, above-ground / in-ground$135 / $255
PMCA residential demolition$75
PMCA temporary certificate of occupancy$125
Zoning Hearing Board appeal$250
Street excavation or sidewalk permit$45 borough street; $75 state street
Sewer tap, per EDU$1,900 capacity plus $2,284 collection
Water tap, per EDU$2,464 capacity plus $618 distribution

Rather talk it over?

Call 1-855-478-4290 →

Worked example: a deck at a house costs PMCA’s $195 inspection charge (footer, framing and final at $65 each), plus the $50 application fee, at least $50 for one hour of plan review and the $4.50 state fee, or $299.50 at the minimum. Return trips for failed or incomplete work cost at least $75, and a 1.5% late fee applies to PMCA accounts unpaid after 30 days. Tap fees are charged per equivalent dwelling unit, defined as 226 gallons a day for sewer and 163 gallons a day for water, and a standard 5/8- or 3/4-inch water meter costs $400.

Land development plan review costs $100 for the first acre, $50 per acre up to 10 acres and $35 per acre beyond, and subdivision review $100 for the first lot and $50 for each additional lot. A plan proposing development also needs an escrow: $1,000 plus $50 per lot or dwelling unit for residential plans, and $2,000 plus $500 per acre or per 10,000 square feet of building area for non-residential plans; if review costs exceed the deposit, the developer adds enough to bring the balance back up to 25% of the original amount.

Trade permits and who may pull them

Chambersburg licenses its own electricians and plumbers. Only a borough-licensed electrician may do regulated electrical work and only a borough-licensed plumber may do plumbing in the borough; applications for the exams and for one-time-a-year special licenses are available at Borough Hall and online, and are approved by the Electricians Examining Board or the Plumbing Examining Board. Home improvement contractors also register with the Attorney General under HICPA.

  • Electrical: the master electrician exam is offered in June and December. License fees are $60 for the first exam including the license, $60 to renew, $60 for a limited license and $360 for a special license. For every job the electrician files the borough’s free Electric Permit Application and Service Request with the Service Center, and proves compliance with an inspection report or cut-in card from a borough-approved inspection agency. Meter sockets must be Milbank unless the Electric Department approves another make.
  • Plumbing: the plumbers’ exam is held in April and October, with the same $60 and $360 fee levels. Work inside a building needs a PMCA plumbing permit; outside service lines are permitted through the Service Center or the borough plumbing inspector (717-262-5471), with a $75 minimum inspection fee and $100 re-inspections.
  • Mechanical and fire: PMCA inspects mechanical rough-ins under the UCC and issues fire, sprinkler and alarm licenses.

Rather not deal with the building department?

Get a free quote →

How to apply for a Chambersburg building permit

1. File the Land Use Permit

Submit the 2026 application and site plan to Planning and Zoning at Borough Hall.

2. Wait for borough sign-off

Utility, public works, zoning and stormwater staff review it and list the other permits you need.

3. Line up licensed trades

Use a borough-licensed electrician and plumber; the electrician files the electric permit with the Service Center.

4. Pay utility connections

Pay water and sewer connection fees at Borough Hall and keep the signed receipt.

5. Apply to PMCA

Take the approved Land Use Permit, plans and connection receipt to PMCA for the UCC and plumbing permits.

6. Pay PMCA’s fees

Application fee, plan review, inspection charges and the $4.50 state fee.

Review, corrections and what causes delay

Missing site plans, or missing electric and plumbing plans on a commercial job or change of use, hold up the Land Use Permit before PMCA can begin. PMCA bills plan review by the hour, so revisions add cost. Once PMCA has a complete application, state rules allow 15 business days for a residential decision and 30 for commercial.

Inspections and certificates in Chambersburg

PMCA performs the UCC inspections. For a new house its schedule runs through footings, foundation, framing, plumbing and mechanical rough-ins, electrical service and rough, energy, wallboard and final, with an under-slab or sprinkler inspection where needed. PMCA issues the certificate of occupancy after the final, and temporary or provisional certificates for $125. Electrical work is also inspected by a borough-approved inspection agency, whose report or cut-in card the electrician supplies to the borough as proof.

Rental housing has a separate program: every residential rental unit must be inspected at least once every three years, PMCA staff carry out the rental code enforcement, and owners pay $75 per three-year cycle, collected as $25 a year. Construction code appeals go to the Town Council-appointed Building Code Board of Appeals, for a $250 fee.

Pennsylvania building code in Chambersburg

Chambersburg opted in to the UCC in 2004, with local amendments, and enforces it through Pennsylvania Municipal Code Alliance as its third-party agency. FEMA’s Community Status Book lists Chambersburg (community 420469) as participating in the National Flood Insurance Program, with flood maps effective January 18, 2012.

Want this handled start to finish?

Get a free quote →

Pennsylvania has one Uniform Construction Code for the whole state, based on the 2021 International Codes since January 1, 2026. Most municipalities enforce it themselves or through a certified third-party agency; where a municipality has opted out, the Department of Labor and Industry handles commercial work and home owners hire a certified agency. Counties do not issue building permits. Pennsylvania rules

Chambersburg permit search and official resources

Borough records, including Land Use Permits, are requested under the Right-to-Know Law on the borough’s request form or the state form, sent to the Open Records Officer by mail to 100 South Second Street, by fax to 717-264-0224 or by email to the Borough Secretary’s office; questions go to 717-251-2437.

Inspections are where schedules slip.

Get a free quote →

Chambersburg building permit FAQs

Where do I get a building permit in Chambersburg?

Start with a free Land Use Permit from Planning and Zoning at Borough Hall; once it is approved, PMCA issues the UCC permit.

How much are inspections for a new house?

PMCA charges $665 for the standard set without sprinkler or under-slab inspections, plus the $50 application fee, plan review and $4.50.

Can an out-of-town electrician work in the borough?

Only with a borough license: pass the master electrician exam (June or December) or obtain a one-time-a-year special license for $360.

Who issues plumbing permits?

PMCA for plumbing inside a building; the Borough Service Center or plumbing inspector for outside service lines. Plumbers must be borough licensed.

Does a deck need a permit?

Yes. It needs a Land Use Permit and a PMCA permit; PMCA’s deck inspections cost $195.

How often are rentals inspected?

At least once every three years, for $75 per cycle billed at $25 a year.

Do I need a permit to dig in the street?

Yes, a borough excavation permit: $45 on a borough street or $75 on a state street, where PennDOT may also require a permit.

Simplify Chambersburg permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Pennsylvania. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Chambersburg sooner?

Let Alliance prepare, file, and track your Chambersburg permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Chambersburg permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.