In Woolwich Township, the Construction Office in the Municipal Building at 120 Village Green Drive is the UCC enforcing agency, with William Miller as Construction Official, Building Subcode Official and Housing Inspector (856-467-2666, option 1; DCA’s roster lists 856-467-1445). Most projects start with a township zoning permit, and most zoning permits end with a zoning inspection of the finished work. Every home sold or rented needs a $45 housing inspection and certificate of occupancy, and new residential development pays a 1.5% affordable housing development fee under Ordinance 2026-02.
What requires a building permit in Woolwich?
Woolwich asks owners to call the Construction Office before work starts to find out whether building, plumbing or electrical permits are needed, and lists jobs that should always prompt that call: boilers, furnaces, heating and air conditioning, windows replaced with a different size or type, siding, decks, patios and driveways. Under the UCC, ordinary maintenance (N.J.A.C. 5:23-2.7) needs no permit and minor work (N.J.A.C. 5:23-2.17A) needs a permit but may start after notice.
Call before you start
- Boilers, furnaces, heating and air conditioning
- Windows that change size or type
- Siding, decks, patios and driveways
- New buildings, additions, garages, pole barns and carports
- Pools (inspected before excavation), sheds, fences and solar
- Demolition, relocation and foundation-only work
The township’s no-permit examples
- Laying floor tile (not wall tile)
- Painting
- Replacing windows or doors with the same size
- Repaving a driveway with the same material and size
Emergencies get one exception: a failed furnace, boiler or water heater may be replaced right away if the Construction Office is told by phone at the time and the permits are taken out within five days.
What Woolwich decides and what the state holds
Woolwich enforces the state code; its own layer is the construction fee chapter (Chapter 68, whose state surcharge wording Ordinance 2026-05 updated on March 16, 2026), the zoning ordinance in Chapter 203 with a zoning permit for most work, lot grading review under Chapter 109, affordable housing development fees under Chapter 95, the housing certificate of occupancy for every sale or rental, and the Kings Landing redevelopment plan, amended in 2025 and 2026. Ordinance 2026-19, posted on the township’s 2026 ordinance list, sets up a Chapter 18 Office of Code Enforcement kept separate from the state construction code.
Woolwich building department: who handles permitting
The Construction Office reviews plans, issues permits and inspects, with the Construction Official also serving as building subcode official and housing inspector. DCA’s roster as of September 2, 2026 lists township officials for the construction, building, electrical, fire protection and plumbing posts and DCA as the elevator subcode official. Business fire inspections are separate: since January 1, 2024 every Woolwich business has fallen under the Swedesboro Fire Bureau, which handles business registrations, fire inspections and fire safety permits.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Construction Office | 120 Village Green Drive, Woolwich Township, NJ 08085; 856-467-2666, option 1 (roster and housing form: 856-467-1445, ext. 7201 or 7202); fax 856-467-5487; constructiondept@woolwichtwp.org |
| Construction Official | William Miller, also Building Subcode Official and Housing Inspector |
| Hours | Monday to Thursday 7:30 a.m. to 4:30 p.m.; Friday 7:30 a.m. to noon |
| Zoning Office | 856-467-2666, option 2; zoning@woolwichtwp.org; office hours Tuesday to Thursday, 11 a.m. to noon |
| Joint Land Use Board | Secretary, ext. 7206 |
| Business fire safety | Swedesboro Fire Bureau, 1500 Kings Highway, Swedesboro; 856-467-0202 |
Woolwich permit types
The Construction Office posts the state permit jacket (F100) and the technical sections: building (F110), electrical (F120), plumbing (F130), fire (F140), mechanical for one- and two-family dwellings only (F145) and elevator (F150), plus the chimney verification (F370) and framing checklist (F390). Permit and application fees can be paid through the township’s online payment portal.
Residential permits
- Pools of every kind need a zoning permit and a pre-dig inspection before excavation; call the office to book it.
- Emergency heating replacements follow the five-day rule above, and fuel-fired equipment changes use the chimney verification form.
- Solar and generators with a second power source need a printed (not handwritten) label within 18 inches of the main panel and meter warning of multiple power sources, which the housing inspection also checks.
- New houses and additions need a $40 zoning application with height, all four setbacks and any wetlands and buffer lines, and a grading plan reviewed under Chapter 109.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial work uses the same jacket and sections (F145 is limited to one- and two-family homes). Non-residential development pays a 2.5% development fee on the equalized assessed value under the Statewide Non-Residential Development Fee Act, as Ordinance 2026-02 applies it, with exemptions certified on the state Form N-RDF. Businesses register yearly with the Swedesboro Fire Bureau, life-hazard uses through the state DCA portal, and signs need zoning permits ($60 for permanent signs; nonprofit signs have their own application).
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the construction permit
- Zoning permit. Send the township zoning application with a site plan showing street and property lines, building limits, wetlands limits and buffers and a north arrow; septic lots show the system or attach county-approved septic plans, and new primary buildings need a site plan sealed by an architect, engineer or land surveyor. Drawings must be to scale; fences need dimensions, height and material but no sealed drawing. HOA properties attach an approval letter.
- Joint Land Use Board. Variances, site plans and subdivisions go to the board, which meets on the first and third Thursday at 7:00 p.m. at 120 Village Green Drive.
- Grading. The Township Engineer reviews grading plans on the township’s grading application; no certificate of occupancy issues until the as-built grading is approved.
- Septic and wells. Gloucester County Environmental Health, 204 E Holly Avenue, Sewell (856-218-4170).
- Soil and county roads. Gloucester Soil Conservation District certification for 5,000 square feet or more of disturbance (856-589-5250) and Gloucester County Engineer road opening permits on county roads (856-307-6600).
The Zoning Office’s own answers set expectations: if the Zoning Officer refuses a permit and says a variance is needed, neither the Mayor nor the Township Committee can order one, and the first step for an unhappy applicant is the Director of Community Development & Planning. Variances run with the land, so a buyer inherits both the relief and its conditions, but a variance for a use that is abandoned is lost. Boundary-line and overhanging-tree disputes between neighbors are private legal matters the zoning office does not handle. Vacant and foreclosed properties are registered with the township through the MuniReg service, online or by mail.
Woolwich permit costs and fees
The township’s construction permit fees are in Chapter 68 of its code; the department pages do not print the subcode amounts, so the office explains the fee when you call about a project. Ordinance 2026-05, adopted March 16, 2026, set the state surcharge collected with each permit at $0.00371 per cubic foot of new construction and $1.90 per $1,000 of value for alterations and renovations, with a $1 minimum. These are the township’s published local fees:
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Zoning application for new buildings and additions | $40 |
| Signs: temporary real estate directional / temporary sign or banner / all others | $10 per sign per posting / $40 / $60 |
| Grading plan review: application / Township Engineer escrow | $50 / $300 per lot |
| Grading inspection (subdivisions) / re-inspection | $200 per lot / $100 |
| Housing inspection for resale or rental CO | $45 per dwelling unit |
| Housing re-inspection | $45 |
| State surcharge, new construction / other work | $0.00371 per cubic foot / $1.90 per $1,000 (minimum $1) |
| Residential development fee (Ordinance 2026-02) | 1.5% of equalized assessed value; 6% bonus fee on extra units from a density variance |
| Non-residential development fee | 2.5% of equalized assessed value, unless exempt |
Worked example from the surcharge ordinance: a $40,000 kitchen renovation carries a state surcharge of 40 × $1.90 = $76 on top of the township’s permit fee. The residential development fee does not apply to developments of one or two owner-occupied homes; where it applies, the tax assessor estimates the value after the first permit and confirms it before the final inspection, and the full fee must be paid before the final certificate of occupancy.
Trade permits and who may pull them
Electrical, plumbing, fire and mechanical work is filed on the state technical sections and inspected by the township’s subcode officials; DCA handles elevator devices. New Jersey licenses electrical contractors, master plumbers and HVACR contractors, has no general contractor license, and requires home improvement contractors to register with the Division of Consumer Affairs, while homeowners working on their own houses are exempt from registration.
- Electrical: the township lists two electrical subcode officials; solar and generator installations must carry the multiple-power-source label.
- Plumbing and heating: emergency water heater, furnace and boiler replacements may go in first if the office is called at the time and permits follow within five days.
- Mechanical: the F145 mechanical section is used only for one- and two-family dwellings.
- Fire: fire protection systems use the F140 section; separate fire safety permits for businesses and events come from the Swedesboro Fire Bureau.
Rather not deal with the building department?
Get a free quote →How to apply for a Woolwich building permit
856-467-2666, option 1, to confirm which permits the job needs and how the fee is figured.
File the zoning application with a scaled site plan, wetlands lines and the fee; HOA letter if needed.
Grading plan review by the Township Engineer, and Joint Land Use Board approval if a variance or site plan is needed.
F100 jacket and each technical section, with plans and contractor registration details.
Pay at the office or through the online payment portal for permits and applications.
Book construction inspections by phone and email the Zoning Office for the final zoning inspection.
Review, corrections and what causes delay
Zoning applications that are not to scale are returned, and new-building plans without the wetlands note or delineation are rejected. A zoning permit lasts one year; under Ordinance 2025-10, if the work has not started or is less than 25% complete by then, a new zoning permit is needed. For the construction permit, N.J.A.C. 5:23-2.16 gives the construction official 20 business days to approve or deny a complete application.
Inspections and certificates in Woolwich
Construction inspections are scheduled by calling 856-467-2666 and choosing option 1. Pools get an extra early visit before any digging. The zoning side has its own close-out: the zoning application says every zoning permit except one for a new home is inspected when the work is done, and section 203-86 makes no permit complete until the zoning officer certifies the work; email zoning@woolwichtwp.org to book it. A certificate of occupancy also waits for the as-built grading approval where Chapter 109 applies, and for payment of any development fee.
Housing certificate at sale or rental
Each resale or rental needs a housing inspection and certificate of occupancy from the Construction Office. Apply in person or by mail and pay when you apply: $45 per unit by cash or check to the Township of Woolwich, and $45 again for each re-inspection. The inspection date is set when you apply; inspections run Monday to Friday, all utilities must be on, and an owner or agent must attend if the house still has belongings in it. Homes on a well or septic system need county well and septic approvals submitted to the township, and a copy of the certificate is sent to the email address on the application, including the new homeowner’s. The application also records any open permits on the property.
New Jersey building code in Woolwich
Woolwich enforces the statewide Uniform Construction Code with its own officials. The 2024 I-codes, the 2024 National Standard Plumbing Code and the 2023 NEC apply from August 17, 2026, and an application that is complete with all prior approvals may still use the 2021 codes and 2020 NEC until February 17, 2027. FEMA’s Community Status Book lists Woolwich Township (community 340217) as participating in the National Flood Insurance Program, with flood maps effective August 17, 2016.
Want this handled start to finish?
Get a free quote →New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
Woolwich permit search and official resources
To see permits or inspection records for a property, file a public records request using the clerk forms in the township forms library; before a sale, the Construction Office’s housing inspection also checks the property for open permits.
- Woolwich Construction Office and forms
- Zoning Office
- Zoning permit application (revised October 30, 2024)
- Grading plan review application
- Housing inspection (CO) application 2026
- Ordinance 2026-05, state surcharge fees
- Ordinance 2026-02, development fees
- Ordinance 2025-10, zoning permit duration
- Township code and ordinances
- Joint Land Use Board
- Bureau of Fire Safety (Swedesboro Fire Bureau)
- Online payment portal
- Township forms library
- Gloucester County Environmental Health: septic systems
- Gloucester Soil Conservation District
- Gloucester County directory (County Engineer)
- DCA local construction contacts roster
- FEMA Community Status Book, New Jersey
Inspections are where schedules slip.
Get a free quote →Woolwich building permit FAQs
Can I replace a broken furnace or water heater before getting a permit?
Yes, in an emergency, if you notify the Construction Office by phone at the time and get the permits within five days.
Do I need a permit to replace windows?
Not for same-size windows or doors; call the office if the size or type changes.
Does a pool need an inspection before it is dug?
Yes. Every pool, above-ground or in-ground, needs a zoning permit and a pre-dig inspection before excavation.
How much is the resale inspection?
$45 per dwelling unit, and $45 for each re-inspection.
Does a new house pay a development fee?
Residential development pays 1.5% of the equalized assessed value under Ordinance 2026-02, but developments of one or two owner-occupied dwellings are exempt.
How long is a zoning permit good for?
One year; if the work has not started or is less than 25% done by then, a new zoning permit is required.
Who inspects businesses for fire safety?
The Swedesboro Fire Bureau, which has covered all Woolwich businesses since January 1, 2024.
Simplify Woolwich Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Woolwich Township sooner?
Let Alliance prepare, file, and track your Woolwich Township permits while your crew stays on the job.
More New Jersey permitting guides
Deptford Township
Read guide →East Greenwich Township
Read guide →Franklin Township (Gloucester County)
Read guide →Wyckoff Township Building Permit Guide
Read guide →Asbury Park Building Permit Guide
Read guide →Atlantic City Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Woolwich Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.