In the Township of West Milford, the Building Department at 1480 Union Valley Road (973-728-2780) enforces the Uniform Construction Code and the township’s zoning; Adam Slufik is the Construction Official. Construction fees come from Ordinance 2026-004, effective February 10, 2026 ($50 per $1,000 for alterations, $0.07 per cubic foot for new space), zoning permits are filed online through SDL, and Highlands Act rules apply to the whole township.
What requires a building permit in West Milford?
The township’s Building FAQ requires a permit to build, enlarge, repair, alter or demolish a structure, or to install or alter equipment such as heating and air conditioning, apart from ordinary maintenance, and lists both sides of the line.
Permit needed
- Cutting into any wall or partition, or removing or cutting a beam or bearing support
- Removing or changing a required way out of the building
- Any work affecting structural or fire safety, or making a nonconformity worse
- Adding, replacing or moving water, sewer, gas, waste or vent piping
- New or moved wiring other than low-voltage communication wiring in a one- or two-family home
- Replacing a receptacle where the electrical code calls for GFCI protection
- Roofs on anything other than a detached one- or two-family home; polypropylene siding in every case
- Pools that hold more than 24 inches of water, exceed 250 square feet or have a recirculating filter
- Sheds over 200 square feet (building and zoning permits, plus a foundation)
Ordinary repairs
- Painting, wallpaper, and drywall or plaster under 25% of a room
- Same-size window and door replacements, screens and glass
- Flooring, cabinets and trim in a one- or two-family home
- Roof repair up to 25% of the roof in 12 months; re-roofing a detached one- or two-family home (since March 5, 2018)
- Like-for-like siding on a one- or two-family home
- Faucets, traps, a toilet or sink swap with no piping change, and clearing clogs
- Replacing switches, fixtures and ordinary receptacles of 20 amps or less, battery smoke alarms, range hoods and same-fuel appliances
An emergency repair, such as a water heater that fails on a Friday night, may be made right away, but the permit must be obtained as soon as possible and no more than 72 hours later, with all required inspections.
What West Milford decides and what the state holds
The technical code is the state’s. West Milford controls its construction fee chapter (Section 135-5), its land development ordinance and zoning (Chapter 500), the lake community notice rule, the municipal Highlands exemption determination and its construction hours. The Department of Community Affairs reviews and processes elevator work, which the fee ordinance and the DCA roster both assign to the state.
West Milford building department: who handles permitting
The Building Department enforces the construction code and the township’s zoning regulations; the Planning & Zoning Department issues zoning permits. Adam Slufik is listed on the township’s contact page as Construction Official and Building Inspector. The DCA roster (as of September 2, 2026) gives the office’s number and fax at the same address and leaves its construction official line blank.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building Department | Town Hall, 1480 Union Valley Road, West Milford, NJ 07480 |
| Phone / fax | 973-728-2780 (permits and inspections) / 973-728-2843 |
| Construction Official | Adam Slufik, 973-728-2725 |
| Hours (September 8, 2026 to May 28, 2027) | Monday, Tuesday and Thursday 8:30 a.m. to 4:30 p.m.; Wednesday to 6:30 p.m.; Friday to 1:30 p.m. |
| Zoning Officer / Zoning Clerk | 973-728-2759 / 973-728-2796 |
| Planning Board and Board of Adjustment secretary | 973-728-2798 |
| Fire Prevention Bureau | 13 Edgar Drive; 973-728-2840 |
| Wells and septic | Passaic County Health Department (environmental), 13 Edgar Drive; 973-881-4772 |
| Elevator subcode | Department of Community Affairs |
Summer hours (May 29 to September 6, 2027) are 8 a.m. to 5 p.m. Monday to Thursday, to 6 p.m. Wednesday, with Fridays closed.
West Milford permit types
Construction permits use the standard New Jersey application forms; the township says forms from another town are acceptable as long as they are the standard state forms. Its Forms Center adds handouts for decks, pools, retaining walls, wood stoves, egress windows, radon systems in new homes, smoke detectors and energy code packages.
Residential permits
- Additions and new homes. Two sets of drawings, at least 1/4 inch to the foot, with floor plans, elevations, foundation and footing details (42-inch minimum footing depth), framing and roof framing plans, wall sections, smoke detector locations, insulation values with an energy code compliance report, and the design loads, which the township lists as a 40 psf ground snow load and 80 mph wind speed.
- Who draws the plans. An owner may prepare drawings for an owner-occupied single-family home; everything else must be drawn and sealed by a New Jersey licensed architect or engineer.
- Decks. The township’s application guide treats decks as alterations, not additions, so they are priced by cost.
- Sheds. Every shed needs a zoning permit; only a shed over 200 square feet also needs a building permit and a foundation.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
All plans for buildings other than an owner-occupied single-family home must carry an architect’s or engineer’s seal and list the use groups and construction class. Commercial storage and factory buildings (S-1, S-2, F-1, F-2) are charged $0.05 per cubic foot with a $400 minimum, a change of use needs a $200 certificate of occupancy, a change in tenancy needs a $30 zoning permit, and a new commercial building a $200 one.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the construction permit
- Zoning permit. Filed only online at sdl.town/WestMilford since June 1, 2024, with a property survey showing the structure to scale and its distances to every line and building; the zoning office says state law gives it 10 business days and the review can take up to two weeks from payment.
- Highlands. The zoning office states that the entire township is in the Highlands Preservation Area. The township posts a Highlands exemption determination application, and environmental limits are settled through the NJ Highlands Council or NJDEP.
- Health Department. Septic and well questions go to the Passaic County environmental health office at 13 Edgar Drive, which the zoning office recommends contacting first when asking whether a lot can be built on.
- Lake communities. Under Ordinance 2008-019 (amended in 2011), a lot on the township’s lake community list needs proof of certified-mail notice to the property owners’ association before a zoning or construction application for a deck, wall, fence, shed or other structure is complete.
West Milford permit costs and fees
Construction fees are in Section 135-5 of the township code as amended by Ordinance 2026-004 (introduced January 7, adopted January 21, effective February 10, 2026). A plan review fee of 20% of the permit fee is paid before review and credited toward the permit fee, and the township collects the state surcharge of $0.00371 per cubic foot of new construction and $1.90 per $1,000 for alterations.
| Item | Fee |
|---|---|
| New construction and additions | $0.070 per cubic foot, $200 minimum |
| Residential shed over 200 sq ft | $0.050 per cubic foot, $200 minimum |
| Renovations, alterations, repairs, minor work | $50 per $1,000 of cost, $100 minimum |
| Roof or siding, R-3/R-5 house | $100 flat (other uses $50 per $1,000) |
| Swimming pool, above-ground / in-ground | $150 / $300 |
| Retaining wall at a house: 550 sq ft or less / over 550 sq ft | $150 / $300 |
| Demolition of a building, structure or in-ground pool | $200 |
| Certificate of occupancy; change-of-use certificate | $200 each |
| Certificate of continued occupancy (on request) / no-CCO letter | $400 / $40 |
| Plumbing | $50 per fixture; $100 per special device; $100 minimum |
| Electrical | $100 for the first 25 fixtures, $50 per further 25; service up to 200 amps $100 |
| Fire | $100 for 1–6 alarm devices; central air $100; wood stove $150; chimney liner $150 |
| Mechanical, 1–2 family | Water heater $50; furnace, boiler or mini-split $100; $100 minimum |
| Change of contractor | $100 per subcode |
Rather talk it over?
Call 1-855-478-4290 →Worked example. A $20,000 deck on a house is an alteration, so the building fee is 20 × $50 = $1,000. The 20% plan review fee ($200) is paid at submission and credited toward that $1,000, and the state surcharge adds 20 × $1.90 = $38. Any other subcode work is added on its own section.
Zoning permits, paid online, are $100 for a new single-family home, $75 for a residential addition or an accessory building over 100 square feet, $50 for fences, pools, sheds, walls, decks, signs, generators, home occupations and short-term rentals, $30 for a change in tenancy, $200 for a commercial building and $150 for commercial additions or alterations.
Trade permits and who may pull them
Plumbing, electrical and fire protection are separate sections of the state application, each fee counted from the fixtures or appliances being installed. On one- and two-family homes the mechanical inspector’s section can be used in place of the plumbing and fire sections for water heaters, boilers, furnaces, gas piping and air conditioning. New Jersey has no general contractor license: home improvement contractors register with the Division of Consumer Affairs, new-home builders register with DCA, and electrical, plumbing and HVACR contractors hold state licenses. An owner doing work on their own home is exempt from registration, and the township’s permit guide tells owners doing the work themselves to write “self” in the contractor box.
- Who seals the trade sections. The plumbing and electrical sections carry the licensed contractor’s seal when a contractor does the work, or the owner’s signature otherwise.
- Pools. Bonding inspections are a $100 flat fee, and the annual electrical inspection of pools, spas and hot tubs costs $100.
- Final payment. The Building Department will not recommend contractors, and it advises holding final payment until the certificate of approval or occupancy issues.
Rather not deal with the building department?
Get a free quote →How to apply for a West Milford building permit
On an undeveloped or constrained lot, start with the Health Department for septic and well rules and the Highlands exemption determination.
Apply on the SDL portal with a property survey; the approved zoning permit arrives by email.
If the lot is on the lake community list, mail the association notice by certified mail and keep the receipt.
Complete the state forms, giving a realistic estimated cost, and attach two sets of drawings.
The 20% plan review fee is paid at submission and credited when the permit issues.
Phone 973-728-2780 at least 24 hours ahead when the work is ready.
Review, corrections and what causes delay
The township states that it has up to 20 business days to review a complete application once all prior approvals, from the Health Department, Planning and Engineering among others, are in, and that decks and sheds are usually faster. The estimated cost must be what a contractor would charge even if the owner does the work, and the township warns that unrealistic figures get applications refused. The Zoning Board of Adjustment, which hears bulk and use variances, meets in the Town Hall main meeting room at 7 p.m.
Inspections and certificates in West Milford
Call 973-728-2780 during business hours, at least 24 hours before the inspection, with the permit number, block and lot, owner, address and type of inspection. The township does not give specific times. Its Required Inspections page lists building inspections Monday to Friday, plumbing on Monday, Wednesday and Friday, electrical on Monday, Tuesday and Wednesday, and fire on Monday and Friday (the older Building FAQ shows different days, so confirm when you call).
- Building. Footing before concrete; foundation before backfill; basement slab before the pour, with 4 inches of crushed stone, a 6-mil vapor barrier and one radon vent pipe per 1,500 square feet; a set inspection for modular homes; framing once framed and sheathed, with the township’s framing checklist; insulation, with its checklist; and final.
- Plumbing. Rough with pressure tests on water, drain and gas lines; building sewer before backfill; final.
- Electrical. Rough, service before the utility connects, and final.
- Fire. Rough fireplace before flue tiles or concealment, and a final smoke detector test.
Selling or renting a home
West Milford does not require a certificate of continued occupancy when a home is sold; one is available on request for $400, and a written letter confirming that none is required costs $40. What the state does require is a certificate of smoke alarm and carbon monoxide alarm compliance before a one- or two-family home is sold, leased or reoccupied, which the Fire Prevention Bureau issues; failing to get one can bring a fine of up to $2,500. Apply and pay through the bureau’s citizen services portal or call 973-728-2840; the office is at 13 Edgar Drive, and owners at Bald Eagle Commons on Richmond Road need the certificate too. Construction work itself is allowed from 7 a.m. to 6 p.m. on weekdays and 9 a.m. to 6 p.m. on weekends, a rule the police enforce.
Want this handled start to finish?
Get a free quote →New Jersey building code in West Milford
West Milford enforces the state code through its own Building Department, with DCA handling elevators. FEMA’s Community Status Book lists West Milford (community 340411) in the National Flood Insurance Program, with flood maps dated April 17, 2020.
New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
West Milford permit search and official resources
Zoning applications are filed on the township’s SDL portal, linked from the Building and Planning pages. Copies of older permits and plans are requested from the Clerk’s office under the Open Public Records Act.
- Building Department and township hours
- Building Department contacts
- Building FAQ: ordinary repairs, plans, sheds, fences, pools
- Ordinance 2026-004, construction fees (Section 135-5)
- Guide to filling out your building permit
- Required inspections
- Choosing a contractor
- Building forms and handouts, including the Highlands exemption application
- Planning & Zoning: online zoning applications
- Zoning FAQ and zoning permit fees
- SDL portal for West Milford
- Lake communities release form (Ordinance 2008-019)
- Certificate of smoke and carbon monoxide alarms
- Health Environmental (Passaic County): wells and septic
- Zoning Board of Adjustment
- DCA Local Construction Contacts roster
- FEMA Community Status Book, New Jersey
Inspections are where schedules slip.
Get a free quote →West Milford building permit FAQs
Do I need a permit to re-roof my house in West Milford?
Not for a detached one- or two-family home since March 5, 2018; other buildings need one. A house roofing or siding permit, such as for polypropylene siding, is $100 flat.
Does a fence need a permit?
A zoning permit, always ($50); a building permit only if the fence is a pool barrier. Fences are limited to 4 feet in front yards and 6 feet in side and rear yards.
Can I still file a paper zoning application?
No. Since June 1, 2024 zoning applications must be submitted online through the SDL portal.
Does West Milford require a CCO when I sell?
No, but the Fire Prevention Bureau’s smoke and carbon monoxide alarm certificate is required, and a letter confirming no CCO is needed costs $40.
Is my lot in the Highlands?
Yes. The zoning office says the whole township is in the Highlands Preservation Area.
Can I draw my own plans?
For an owner-occupied single-family home, yes; all other buildings need plans sealed by a New Jersey licensed architect or engineer.
Who handles septic and wells?
The Passaic County environmental health office at 13 Edgar Drive, 973-881-4772, not the Building Department.
Simplify West Milford Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in West Milford Township sooner?
Let Alliance prepare, file, and track your West Milford Township permits while your crew stays on the job.
More New Jersey permitting guides
Passaic County
Read guide →Woodland Park Borough
Read guide →Clifton
Read guide →West New York Building Permit Guide
Read guide →West Orange Building Permit Guide
Read guide →Westfield Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about West Milford Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.