To get a building permit in North Bergen, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

North Bergen’s Code Enforcement department at Town Hall, 4233 Kennedy Boulevard, reviews plans, issues construction permits and certificates of occupancy, and enforces the township zoning ordinance.

Authority: North Bergen Code Enforcement (Building Department)Code: NJ Uniform Construction CodePhone: 201-392-2051
Office
4233 Kennedy BoulevardTown Hall, 201-392-2051
Letter of denial
$35First step toward a board hearing
Elevators
Municipal Inspection CorpPrivate agency on DCA’s roster
Meadowlands lots
NJSEA plan reviewFile by email to the NJSEA

In the Township of North Bergen, the Code Enforcement department at Town Hall, 4233 Kennedy Boulevard (201-392-2051), is the UCC enforcing agency: it reviews engineering and architectural plans, issues construction permits, inspects, and issues residential and commercial certificates of occupancy, and it also handles zoning. A project that does not meet zoning starts with a $35 letter of denial from the construction official’s office. Parcels inside the Meadowlands District have their zoning and construction plans reviewed by the NJSEA.

What requires a building permit in North Bergen?

New construction, additions, alterations, demolition and trade work need a construction permit under the statewide UCC, filed with the township’s Code Enforcement department. Ordinary maintenance (N.J.A.C. 5:23-2.7) needs no permit, notice or inspection; minor work (N.J.A.C. 5:23-2.17A) needs a permit but can start once the department has been notified. Because the same department enforces the zoning ordinance, a project is checked against zoning as part of the permit process, and one that does not comply receives a letter of denial that points it to the Planning Board or the Board of Adjustment.

Handled by Code Enforcement

  • Construction permits and engineering and architectural plan review
  • Inspections and residential and commercial certificates of occupancy
  • Zoning enforcement and letters of denial
  • UCC violations and property maintenance
  • Illegal apartment complaints and illegal occupancy investigations

Handled elsewhere

  • Meadowlands District parcels: NJSEA zoning certificates and UCC plan review
  • Elevator devices: Municipal Inspection Corp, the township’s elevator subcode agency
  • Fire Code inspections of existing buildings: Fire Prevention Bureau
  • County-road site plans and street openings: Hudson County

What North Bergen decides and what the state holds

The codes are statewide; the township supplies the enforcing agency, the fee ordinance, the zoning ordinance and its boards. North Bergen also runs an illegal apartment hotline (201-392-0308) and a housing inspection office (201-392-2008), and its Health Department inspects public health nuisances, food establishments, public pools and institutions for a township of more than 60,000 residents, by its own count. Part of the township lies in the Hackensack Meadowlands District, whose eastern border the NJSEA describes as Routes 1 and 9 (Tonnelle Avenue) and the Norfolk Southern and CSX freight lines; inside the district, the NJSEA’s own zoning and subdivision regulations apply.

North Bergen building department: who handles permitting

The Code Enforcement department, which the township also calls the Building Department, is North Bergen’s construction office. DCA’s roster as of September 2, 2026 lists township officials as construction official (who also holds the plumbing subcode) and as building, electrical and fire protection subcode officials, and names a private inspection agency, Municipal Inspection Corp, as the elevator subcode official, so elevator plans and inspections go through that agency rather than DCA.

Short on time to read all of this?

Get a free quote →
North Bergen permit contacts
OfficeContact
Code Enforcement / Building DepartmentTown Hall, 4233 Kennedy Boulevard, North Bergen, NJ 07047; 201-392-2051; fax 201-864-0208
Housing inspectors201-392-2008
Board of Adjustment (and rent control)201-392-2047
Fire Code Enforcement201-392-2075 (no credit cards; cash, check or money order)
Township Clerk201-392-2024
NB Help Desk201-875-9110; online requests answered within 48 hours
Meadowlands District parcelsNJSEA, plans@njsea.com; Zoning Officer of the Day 201-460-1700

North Bergen permit types

Construction permits are filed on the state UCC construction permit application with the technical section for each trade, and plans go through the department’s engineering and architectural review before the permit issues.

Residential permits

House projects such as additions, alterations, decks and new dwellings are reviewed for zoning compliance alongside the code review. Where an addition or new unit does not meet the zoning ordinance, the department issues a letter of denial, which the owner then takes to the Board of Adjustment or the Planning Board for a variance. Code Enforcement also investigates illegal apartments and potential illegal occupancy, and it issues residential certificates of occupancy after inspection.

Commercial permits

Commercial work follows the same jacket and technical sections, with commercial certificates of occupancy issued by Code Enforcement. Businesses also deal with the Business License office (201-392-2026) and the Fire Prevention Bureau, whose state-certified inspectors carry out the state-mandated fire inspections of existing buildings. Elevator installations and alterations go through Municipal Inspection Corp as the elevator subcode agency. In the Meadowlands District, the NJSEA requires a continued occupancy certificate at every change of tenant.

Not sure this scope needs a permit?

Get a free quote →

Parcels in the Meadowlands District

North Bergen is not one of the three towns (Secaucus, Kearny and Carlstadt) that opted out of NJSEA review, so for a parcel inside the district the NJSEA itself handles the land use side and the UCC plan review. Applications go only by email to plans@njsea.com, fully completed and signed, with the licensed professional’s signature on every plan sheet (electronic signatures are accepted); the applicant is emailed a file number and the fees due, and original signed and sealed sets are sent only when NJSEA staff request them. A zoning certificate is required for new buildings, additions, site improvements including placing fill, and changes of use, and the NJSEA’s site plan reviewers look at grading and drainage, lighting, open space, landscaping and utilities. Public hearings are held only for variances or special exceptions; conforming applications go to the NJSEA’s Chief Engineer for approval. For the construction permit, the applicant submits the NJUCC subcode forms and construction plans to the NJSEA and pays its plan review fee. The NJSEA also reviews sign permit applications, inspects before issuing a continued occupancy certificate, and routinely inspects district properties for fill, dumping, signage, maintenance and occupancy. Its Zoning Officer of the Day answers questions by email at zod@njsea.com or at 201-460-1700.

What comes before the construction permit

  • Zoning review by the township, or for district parcels an NJSEA zoning certificate (new buildings, additions, site improvements including fill, and changes of use).
  • Board approval from the Planning Board or the Board of Adjustment, whichever the letter of denial names.
  • Hudson County Planning Board review for site plans that affect traffic or drainage on a county road, filed through the county’s online portal.
  • County street openings through the Hudson County Division of Engineering (201-369-4340).
  • Soil erosion certification from the Hudson-Essex & Passaic Soil Conservation District, 80 Orchard Street, Bloomfield (862-333-4505), when more than 5,000 square feet is disturbed.

North Bergen permit costs and fees

The township’s construction fee schedule is set by ordinance but is not printed on the township’s web pages, so get a quote from Code Enforcement at 201-392-2051 before you budget. The state training fee surcharge under N.J.A.C. 5:23-4.19 is added to every permit. The fees the township does publish relate to the board process:

North Bergen published fees and requirements
ItemFee or rule
Letter of denial from the construction official’s office$35
Planning Board application18 complete packets plus a flash drive
Board of Adjustment application15 complete packets plus a flash drive
Legal noticeIn The Record and/or The Jersey Journal at least 10 days before the meeting
Neighbor noticeCertified mail to owners within 200 feet
Meadowlands District parcelsPlan review fee paid to the NJSEA
Fire Prevention paymentsCash, check or money order; no credit cards

Rather talk it over?

Call 1-855-478-4290 →

Board applications also carry the board’s own application fees, which the cover letter of each packet must list by amount and purpose.

Trade permits and who may pull them

Electrical, plumbing, fire protection and mechanical work is filed on the state technical sections and reviewed and inspected by the township’s subcode officials; the construction official also serves as plumbing subcode official. Elevator work is the exception, handled by Municipal Inspection Corp. New Jersey licenses electrical contractors, master plumbers and HVACR contractors; there is no state general contractor license, but home improvement contractors must be registered with the Division of Consumer Affairs, and new-home builders with DCA. A homeowner doing work on their own home is exempt from contractor registration and still needs the permit and inspections.

How to apply for a North Bergen building permit

1. Check where the lot is

If the parcel is inside the Meadowlands District, file zoning and construction plans with the NJSEA by email.

2. Prepare plans

An architectural plan, and a site plan from an engineer or surveyor where the work changes the site.

3. File with Code Enforcement

Submit the UCC jacket, technical sections and plans at Town Hall, 4233 Kennedy Boulevard.

4. Zoning review

If the project does not conform, request the $35 letter of denial and apply to the right board.

5. Board hearing, if needed

File 18 (Planning Board) or 15 (Board of Adjustment) packets, advertise and notify neighbors.

6. Permit and inspections

Once approvals are in, the permit issues and the department inspects through to the certificate.

Review, corrections and what causes delay

Board cases add the most time: packets must include proof of paid taxes, the certified 200-foot owner list from the Tax Assessor, the application form from the Building Department, the survey and plans, and notice must be published at least 10 days before the meeting and mailed to neighbors, with proof given to the Planning Board Secretary beforehand. Once an application is complete, N.J.A.C. 5:23-2.16 gives the construction official 20 business days to approve or deny it; if the office does neither in that time, the failure counts as a denial for an appeal to the county board, unless the applicant agreed to more time.

Rather not deal with the building department?

Get a free quote →

The same state rules set the life of a permit. An application that sits for six months without a permit being issued is treated as abandoned unless it has been diligently pursued (N.J.A.C. 5:23-2.15). Once issued, a permit becomes invalid if the work does not start within 12 months or is suspended or abandoned for six months. A true copy of the permit must be kept on site until the job is finished, and the construction official must get at least 24 hours’ notice before work starts.

Appealing a construction decision

A ruling by the township’s construction office under the UCC is appealed to the Hudson County Construction Board of Appeals, 595 County Avenue, Secaucus (201-369-4340). The appeal must be filed by the 15th day after written notice of the decision, or, if the office failed to act, by the 15th day after its time to act ran out. The county’s July 2026 application asks for the original and nine collated copies with the filing fee, a copy of the decision being appealed, and proof that a copy went to the local enforcing agency at the same time. Zoning issues and municipal ordinance violations are not heard by that board; they stay with the township’s boards.

Inspections and certificates in North Bergen

Code Enforcement inspects permitted work and issues residential and commercial certificates of occupancy; book inspections through the department at 201-392-2051, giving at least the 24 hours’ written notice the UCC requires (N.J.A.C. 5:23-2.18(c)). Under the same rule, inspections are made within three business days of the requested time, or at another time within 30 days that the department and the person in charge of the work agree, and the work may not be covered until it has been inspected. In the Meadowlands District, the NJSEA performs inspections where it considers them necessary or when the township’s code official asks, and it inspects before issuing a continued occupancy certificate to a new tenant. The Fire Prevention Bureau separately inspects existing buildings each fiscal year under the state Fire Code.

New Jersey building code in North Bergen

North Bergen enforces the statewide UCC with its own officials, except in the Meadowlands District, where the NJSEA reviews plans for code conformance. The 2024 I-codes, the 2024 National Standard Plumbing Code and the 2023 NEC apply from August 17, 2026; until February 17, 2027 a complete application with all prior approvals may use the 2021 codes and 2020 NEC. FEMA lists the Township of North Bergen (community 340225) as participating in the National Flood Insurance Program, with flood maps effective August 16, 2006.

Want this handled start to finish?

Get a free quote →

New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules

North Bergen permit search and official resources

Planning Board case files can be viewed at the North Bergen Recreation Center, 1231 Kennedy Boulevard, third floor, between noon and 6 p.m. For permit files and inspection records, contact the Township Clerk (201-392-2024) for an Open Public Records Act request, or ask through the NB Help Desk. NJSEA posts a yearly list of its opened applications for district parcels.

Inspections are where schedules slip.

Get a free quote →

North Bergen building permit FAQs

Where do I apply for a building permit in North Bergen?

At Code Enforcement, the township’s Building Department, in Town Hall at 4233 Kennedy Boulevard (201-392-2051).

What if my project does not meet zoning?

Ask the construction official’s office for a letter of denial ($35), then apply to the Planning Board or Board of Adjustment as the letter directs.

How many copies does a board application need?

18 complete packets for the Planning Board or 15 for the Board of Adjustment, plus the full application on a flash drive.

Who handles permits in the Meadowlands part of town?

The NJSEA reviews zoning and construction plans for parcels inside the Meadowlands District; applications go by email to plans@njsea.com.

How do I appeal a permit decision?

File with the Hudson County Construction Board of Appeals in Secaucus within 15 days of the written decision, sending a copy to the township’s construction office at the same time.

Who inspects elevators?

Municipal Inspection Corp, the private agency listed on DCA’s roster as North Bergen’s elevator subcode official.

How do I report an illegal apartment?

Call the township’s illegal apartment hotline at 201-392-0308; Code Enforcement investigates illegal occupancy.

Simplify North Bergen permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in North Bergen sooner?

Let Alliance prepare, file, and track your North Bergen permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about North Bergen permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.