In the Borough of Haddonfield, construction permits come from the Construction and Zoning Department, Room 104, Borough Hall, 242 Kings Highway East (856-429-4700), where Ed Toussaint is the Construction Official (ext. 209). Zoning approval must be granted before a construction application is accepted, and exterior work in the historic district needs a certificate of appropriateness first. Under the borough’s posted fee schedule an alteration costs $34 per $1,000 of the first $50,000 of cost, fees are paid by cash or check only, and inspections are requested by email or through the online portal.
What requires a building permit in Haddonfield?
The department enforces the state Uniform Construction Code, which sets the permit line for new buildings, additions and alterations of homes and other buildings. Work listed as ordinary maintenance in N.J.A.C. 5:23-2.7, such as painting, flooring, cabinets and windows replaced in the same opening, needs no permit; minor work such as a like-capacity water heater or furnace replacement needs a permit but may start after the office is notified. Asbestos removal is overseen by DCA, and the contractor must be certified and file its paperwork with the Construction Office.
Zoning permit first
- Additions, porches and new houses
- Fences (the zoning form doubles as the fence permit)
- Basement finishing and garage conversions, with room-by-room layouts
- New businesses and changes of use
- Business signs
Extra borough requirements
- Pre-construction video for additions, new houses, demolitions and new construction over 200 square feet
- Tree protection certification
- New home or addition occupancy agreement
- Affordable housing development fee form
- Historic Preservation Commission approval in the historic district
One older item to check: the borough’s posted fee schedule, dated January 17, 2020, still lists a $65 fee for roofing and siding on one- and two-family houses, while the current state list treats replacing the roof covering on a detached one- or two-family house, and siding on any one- or two-family house other than polypropylene siding, as ordinary maintenance.
What Haddonfield decides and what the state holds
The construction standards are the state’s. Haddonfield controls its zoning and historic district rules, its construction fee schedule, the pre-construction video rule in Chapter 171, the smoke detector certificate at sale or rental in Chapter 114, the sidewalk inspection at sale in Chapter 199 and the historic district disclosure to buyers in Chapter 135. DCA’s roster lists the same Kings Highway office and officials for neighboring Tavistock Borough.
Haddonfield building department: who handles permitting
The Construction and Zoning Department is the borough’s enforcing agency for the Uniform Construction Code: it issues construction permits and inspects the work. In DCA’s Local Construction Contacts roster (as of September 2, 2026) Ed Toussaint holds the construction official, building and plumbing posts, other borough officials hold electrical and fire protection, and the Department of Community Affairs holds elevators. The same technical assistant also serves as secretary to the Historic Preservation Commission, the Planning Board and the Zoning Board.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Construction and Zoning, Room 104, Borough Hall, 242 Kings Highway East, Haddonfield, NJ 08033 |
| Hours | Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| Construction Official | Ed Toussaint, 856-429-4700 ext. 209 |
| Construction questions | Technical assistant, ext. 210; fax 856-429-4162 |
| Zoning and code enforcement | Zoning Officer ext. 228; code enforcement ext. 214 |
| Inspection requests | inspections@haddonfield-nj.gov or the online portal |
| Fire Marshal (resale and rental certificates) | 856-429-4700 ext. 257 or 260 |
Haddonfield permit types
Construction permits use the state jacket and the building, electrical, plumbing, mechanical, elevator and fire technical sections, which the borough posts in their September 2026 versions with a framing checklist, an air barrier and insulation checklist, a chimney certification and the energy efficiency certificate. Applications are refused unless every form is correctly completed.
Residential permits
- New houses and additions. Besides the technical sections, file the affordable housing development fee form, the pre-construction video ($250, on a labeled USB drive showing the curb, sidewalk, apron, street trees, inlets and utility fittings), the tree protection certification and the signed occupancy agreement. The permit is not released without that agreement.
- Interior work. Basements and garage conversions need zoning approval with drawings showing the layout and use of each room.
- Pools and retaining walls. Flat fees depend on whether the surface area is over 550 square feet.
- Dumpsters. The Police Department issues dumpster permits online.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial jobs use the same technical sections, with volume-based fees for new space. A new business needs a zoning permit with a letter of intent describing the use, hours and staff and an interior layout. Business signs have their own application and checklist, and outdoor dining, merchandise display and A-frame sign permits are renewed every calendar year with proof of insurance naming the borough; a business may have a merchandise display or an A-frame sign, not both.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the construction permit
- Zoning permit. $50, with two scaled surveys showing existing and proposed improvements, setbacks, height and coverage, and the front yard setback calculation where it applies. Zoning and construction applications cannot be filed together.
- Historic Preservation Commission. Any exterior change in the historic district needs a certificate of appropriateness: the HPC reviews the design at its meeting on the second Wednesday of the month at 7:30 p.m., and the Planning Board gives final approval.
- Boards. Variances go to the Zoning Board of Adjustment (third Tuesday, 7 p.m.) and site plans and subdivisions to the Planning Board (first Tuesday, 7:30 p.m.); every escrow needs a W-9, and a seasonal high water test pit has its own engineering escrow form.
- County and soil. Work in a Camden County road needs a county road opening permit, and disturbing more than 5,000 square feet needs a plan certified by the DelAtlantic Soil Conservation District (West Berlin, 856-767-6299).
Haddonfield permit costs and fees
The borough posts its construction fee schedule, dated January 17, 2020. Plan review is 20% of the construction permit fee, the minimum fee is $65, and fees are paid in cash or by check to the Borough of Haddonfield; electronic payment is not accepted for permit application fees.
| Work | Fee |
|---|---|
| New buildings and additions | $0.038 per cubic foot; A, F and S groups $0.021 per cubic foot |
| Alterations and repairs | $34 per $1,000 up to $50,000; $26 per $1,000 from $50,001 to $100,000; $22 per $1,000 above |
| Above-ground pool | $70; $140 over 550 sq ft |
| In-ground pool / retaining wall at a house | $106; $210 over 550 sq ft |
| Plumbing fixtures and appliances | $15 each; special devices such as backflow preventers $91 |
| Electrical fixtures and devices | $50 for 1 to 50; $9 per further block of 25 |
| Electrical service up to 225 amps / 225 to 1,000 amps | $65 / $129 |
| Mechanical equipment in a house | $60 first device; $15 each additional |
| Demolition, small one- or two-family house | $92 ($168 other buildings) |
| Certificate of occupancy | $39; change of use group $168 |
| Certificate of continued occupancy | $168 |
| Pre-construction video | $250 |
| Zoning permit | $50 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the schedule: an $80,000 renovation carries a building fee of $1,700 on the first $50,000 (50 × $34) plus $780 on the remaining $30,000 (30 × $26), or $2,480, before trade sections, plan review and the state surcharge. New houses and additions also pay the affordable housing development fee, 1.5% of the increase in equalized assessed value for residential work and 2.5% for commercial work, in three steps: half the estimate with the permit submission, the balance before final inspections are booked, and a final bill after the tax assessor reassesses the property.
Trade permits and who may pull them
Electrical, plumbing, mechanical and fire work is filed on the matching technical section of the same construction permit. In Haddonfield the Construction Official also holds the plumbing subcode, while separate subcode officials handle electrical and fire protection, and DCA handles elevator work.
- Electrical: fees count fixtures and devices in blocks, plus individual charges for motors, services, generators and pool equipment; electrical contractors hold state licenses.
- Plumbing: each fixture or gas appliance counts toward the $15 per-item fee; master plumbers are licensed by the state.
- Mechanical: furnace, boiler and air conditioner replacements in a house are inspected by a mechanical inspector for $60 plus $15 per extra device, with no separate charge for the gas or water connections.
- Fire: sprinkler, alarm and suppression work uses the fire section; smoke detector certificates for sales and rentals are a separate Fire Marshal process.
Contractors improving a home must be registered home improvement contractors with the Division of Consumer Affairs, and new-home builders register with DCA; HVACR contractors hold state licenses. A homeowner working on the house they live in is exempt from registration.
How to apply for a Haddonfield building permit
If the property is in the district, start the certificate of appropriateness at the Zoning & Construction Office.
File the $50 zoning permit with two scaled surveys; construction forms are not accepted until it is granted.
Jacket, technical sections, plans and, for new houses and additions, the fee form, video, tree certification and occupancy agreement.
Bring the packet to Borough Hall with a check or cash for the first development fee payment where one applies.
Each subcode official reviews the matching section and returns any comments.
Pay the construction fee by cash or check and pick up the permit before work starts.
Rather not deal with the Haddonfield Borough building department?
Get a free quote →Review, corrections and what causes delay
State rules give the construction official 20 business days to decide a complete application, and the clock cannot start in Haddonfield until zoning approval is in hand. Historic district projects also wait for the monthly HPC meeting and Planning Board approval, and an incomplete form stops the file at intake. Surveys must be to scale; the office keeps none on file, so owners without one need their title company, lender or a surveyor.
Inspections and certificates in Haddonfield
Inspection requests must be in writing, by email to inspections@haddonfield-nj.gov or through the portal, never by voicemail, and must include the permit number, address, specific inspection, preferred date and phone number. Ask two or three days ahead; next-day inspections are not guaranteed. Subcode inspections run roughly 11 a.m. to 3 p.m. on weekdays, with limited slots on Monday and Wednesday afternoons from about 2 to 5 p.m., and the office confirms by email. No new building or addition may be used until all finals pass and the certificate of occupancy is issued.
Selling or renting a home
A home sale needs two certificates, filed in Room 104. The Fire Marshal inspects smoke detectors, carbon monoxide alarms and the house number under Chapter 114, on a Tuesday or Wednesday between 9 a.m. and 1 p.m.; the fee is $56 with more than 10 business days’ notice, $125 at four to 10 days and $201 under four, with one free reinspection and $25 after that. A borough inspector checks sidewalks, driveway aprons and walkways in the right-of-way once a sale contract is signed ($50, or $75 inside 10 business days); that certificate is valid for 90 days, repairs are due within 30 days of transfer, and listed condominium complexes are exempt. Historic district homes need a free disclosure form, rentals need the smoke detector inspection plus lead paint filings, and any open construction permit must be closed before a certificate is released.
New Jersey building code in Haddonfield
Haddonfield enforces the Uniform Construction Code as adopted by DCA: the 2024 I-codes, the National Standard Plumbing Code and the 2023 NEC from August 17, 2026, with the 2021 codes still available until February 17, 2027 for a complete application with all prior approvals. FEMA’s Community Status Book lists the borough (community 340501) as a participating National Flood Insurance Program community, with flood maps effective September 28, 2007. Appeals of construction decisions go to the Camden County Construction Board of Appeals within 15 days.
New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
Haddonfield permit search and official resources
Before a sale, the department checks the construction permit history of the property for open permits; owners can ask Room 104 about open permits, or request older files under the Open Public Records Act. Historic Preservation Commission, Planning Board and Zoning Board agendas, applications, minutes and resolutions are posted by year.
Want this handled start to finish?
Get a free quote →- Construction and Zoning Department
- Forms and applications
- Construction fee schedule (January 17, 2020)
- Zoning permit package 2026
- Affordable housing development fee form
- Pre-construction video requirements
- Schedule an inspection
- Resale and rental CO information
- Smoke detector certificate application
- Sidewalk inspection for home sales
- Historic Preservation Commission
- Zoning Board of Adjustment
- Planning Board
- Construction FAQ
- DCA Local Construction Contacts roster
- Camden County Construction Board of Appeals
- Camden County road opening permit rules
- DelAtlantic Soil Conservation District
- FEMA Community Status Book, New Jersey
Inspections are where schedules slip.
Get a free quote →Haddonfield building permit FAQs
Can I file zoning and building permits together in Haddonfield?
No. The borough requires zoning approval before it will accept the construction permit application.
How much does a renovation permit cost?
The building fee is $34 per $1,000 of cost up to $50,000, $26 per $1,000 up to $100,000 and $22 above that, so an $80,000 job is $2,480 before trade sections and plan review.
Do I need approval to change windows in the historic district?
Yes. All exterior changes there need a certificate of appropriateness, reviewed by the Historic Preservation Commission and approved by the Planning Board, before work or a construction permit.
What is the pre-construction video?
A $250 video or photo record on a USB drive of the curb, sidewalk, apron, trees and utility fittings, required for new houses, additions, demolitions and other heavy-equipment jobs.
What inspections does a home sale need?
A Fire Marshal smoke and CO alarm inspection and a sidewalk inspection, plus the historic district disclosure where it applies.
Can I pay permit fees online?
No. Permit application fees are paid by cash or check made payable to the Borough of Haddonfield.
How far ahead should I request an inspection?
Two or three days, in writing by email or the portal; voicemail requests are not scheduled.
Simplify Haddonfield Borough permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Haddonfield Borough sooner?
Let Alliance prepare, file, and track your Haddonfield Borough permits while your crew stays on the job.
More New Jersey permitting guides
Camden County
Read guide →Lindenwold Borough
Read guide →Pennsauken Township
Read guide →Hamilton Township (Mercer) Building Permit Guide
Read guide →Hamilton Township (Atlantic County) Building Permit Guide
Read guide →Hammonton Town Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Haddonfield Borough permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.