In Clark Township, the Construction Department at the Municipal Building, 430 Westfield Avenue, issues and inspects construction permits; Art Figueiredo is the Construction Official, building subcode official and Zoning Officer (732-428-8401). Zoning approval comes before the construction application, the permit packet is picked up at the office and must be filled out completely, and inspections are booked through the township’s online services portal for Tuesdays and Thursdays. Every residential, commercial or industrial sale needs a Certificate of Resale.
What requires a building permit in Clark?
Clark’s permits page puts it simply: permits are required for most home improvement projects, inside or outside the house, and the Construction Office hands out the application packet. The state draws the exact line. Ordinary maintenance listed in N.J.A.C. 5:23-2.7 needs no permit, minor work may start once the office is notified, and N.J.A.C. 5:23-2.14 exempts garden sheds of 200 square feet or less (10 feet tall or less, no utilities) and fences up to 6 feet that are not pool barriers from the building permit.
Construction permit
- Additions, new houses and alterations
- Decks, pools and pool barriers
- Electrical, plumbing, fire and mechanical work, including replacement fuel-fired equipment with a chimney verification
- Larger sheds and fences over 6 feet
- Commercial fit-outs and alterations
Township permits and filings
- Fence and shed zoning permits (online)
- Zoning permit for a commercial change of tenant
- Right-of-way permit for work in a township street
- Dumpster permit
- Monitoring well permit, with a temporary access agreement
- Annual backflow certification for commercial properties
What Clark decides and what the state holds
The construction rules are the state’s. Clark decides its zoning (the setbacks, coverage and height limits below), its construction fee schedule in the township code, the Certificate of Resale on every sale, right-of-way and dumpster permits, annual business registration and fire inspection, and backflow certification for commercial properties. Clark fills all of its own subcode posts in DCA’s roster, including elevators; none is held by DCA.
Clark building department: who handles permitting
The Clark Township Construction Department enforces the Uniform Construction Code. In DCA’s Local Construction Contacts roster (as of September 2, 2026) Artur Figueiredo holds the construction official and building subcode posts, one township official holds electrical and fire protection, another plumbing, and the township has its own elevator subcode official. The township page adds that the Construction Official also serves as Zoning Officer, so zoning and construction questions go to the same office, and the department’s inspection requests, zoning projects and resale certificates all run through the township’s GovPilot online services.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Construction Department, Municipal Building, 430 Westfield Avenue, Clark, NJ 07066 |
| Hours | Monday to Friday, 8:30 a.m. to 4:00 p.m. |
| Phone and email | 732-428-8401; const@ourclark.com |
| Construction Official and Zoning Officer | Art Figueiredo |
| Municipal Building main line (DCA roster) | 732-388-3600; fax 732-388-3501 |
| Fire inspections and business registration | Clark Fire Department, 732-381-1150 |
| Zoning Board secretary | 732-428-8401 |
| Health Department | Health officer usually in the office 8:30 to 9:30 a.m. and 2:30 to 3:30 p.m. |
Clark permit types
Clark uses DCA’s forms: the construction permit application, the building, electrical, plumbing and fire technical sections, the mechanical inspector section for heating and cooling in houses, and the chimney verification for fuel-fired equipment. The township’s own packet prints its address and the construction office number on the jacket. Paperwork varies with the work, and every application must be filled out completely.
Residential permits
- Additions and new houses. Zoning approval first, then the full packet and plans. The 2023 setback sheet sets the envelope: a maximum height of 35 feet and two and a half stories, 50% impervious coverage and a 40% floor area ratio in every one-family zone.
- Fences and sheds. Applied for online as zoning projects; larger sheds and fences over 6 feet also need construction review.
- Corner lots. Every yard facing a public street must meet the front yard setback, and the sheet notes that the prevailing setback takes precedence.
- Before digging. The township’s “Before You Dig” notice reminds owners that fences, decks, additions, tree and stump work and new gardens all start with a call to 1-800-272-1000, at least three business days and no more than 10 days before work, and that the mark-out request is good for 30 business days.
| Zone | Principal building | Accessory building | Coverage |
|---|---|---|---|
| R150 | Front 40 ft, rear 35 ft, side 15 ft, both sides 30 ft | Rear 15 ft, side 10 ft | 15% lot coverage |
| R100 | Front 30 ft, rear 25 ft, side 10 ft, both sides 25 ft | Rear 10 ft, side 6 ft | 20% lot coverage |
| R75 | Front 25 ft, rear 20 ft, side 8 ft, both sides 20 ft | Rear 5 ft, side 5 ft | 30% lot coverage |
| R60 | Front 25 ft, rear 20 ft, side 8 ft, both sides 18 ft | Rear 5 ft, side 5 ft | 30% lot coverage |
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
A change of tenant at a commercial property needs a zoning permit application, and the construction permit covers any fit-out. Every business in Clark registers each year online and has an annual fire inspection by the Clark Fire Department, and commercial properties must have a backflow device inspected by an independent backflow inspector, submitting the certificate and fee online every year. Site plans go to the Planning Board. Anyone selling or serving food, including mobile vendors, vending machines and temporary events, needs a Retail Food Establishment License from the Clark Health Department, applied for and paid online; new or renovated public pools, spas and other recreational bathing facilities go through the department’s plan review and a pre-operational checklist and inspection before opening each season.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the construction permit
- Zoning Officer. All prior approvals from the Zoning Officer must be obtained before the construction application is submitted.
- Boards. The Planning Board meets on the first Thursday of the month at 7:30 p.m. and the Zoning Board on Mondays at 7:30 p.m. as listed on the township calendar, both in the Council Chambers at the Police Department, 315 Westfield Avenue. Planning Board applications are filed online.
- Engineering. The Township Engineer reviews building permits and checks compliance with board conditions.
- Monitoring wells. Environmental monitoring wells placed under the permit article of Chapter 310 need a temporary access permit: two copies of the application and six copies of a scaled location and detail plan, with the fee and an access agreement.
- County and soil. The Union County Planning Board reviews site plans and subdivisions as they affect county roads and drainage (908-527-4268); see the Union County guide for county road openings. Disturbing more than 5,000 square feet needs certification from the Somerset-Union Soil Conservation District, 308 Milltown Road, Bridgewater (908-526-2701).
Rather talk it over?
Call 1-855-478-4290 →Clark permit costs and fees
Clark’s construction fees are set in the township code, and the township does not print them on its permit pages. The jacket’s fee summary shows how the bill is built: building, electrical, plumbing, fire and elevator fees, less the share for state plan review, the state permit surcharge and any certificate of occupancy fee. Ask 732-428-8401 for the figure before filing. The state training surcharge is $1.90 per $1,000 of value for alterations and $0.00371 per cubic foot for new buildings and additions.
Several township charges are paid online through the forms they belong to: the Certificate of Resale, the residential smoke detector inspection, the commercial backflow certification, the annual business registration and the dumpster and right-of-way permits. Ask the office for those amounts, and for a worked estimate of the construction fee on your job, before you file.
Trade permits and who may pull them
Trade work is filed on the technical sections in the same packet. In Clark one subcode official covers electrical and fire protection, another plumbing, and the township has its own elevator subcode official; the Construction Official handles building.
- Electrical. State-licensed electrical contractors file the electrical section.
- Plumbing. Licensed master plumbers file the plumbing section; commercial buildings also need the yearly backflow certification.
- Mechanical. Heating and cooling equipment in houses uses the mechanical inspector section, with the chimney verification for fuel-fired units.
- Fire. Sprinkler, alarm and other fire protection work uses the fire section; the Fire Department separately inspects businesses each year.
The township reminds homeowners that home improvement contractors must be registered with the Division of Consumer Affairs, with the registration number on contracts, advertisements and vehicles. New-home builders register with DCA, and an owner working on their own home is exempt from registration.
How to apply for a Clark building permit
Use the 2023 setback sheet, the November 2024 zoning district map or the township’s interactive GIS map.
File fence, shed and other zoning projects online; the Zoning Officer’s approval must come first.
Collect the permit application packet at the Construction Office, 430 Westfield Avenue.
The jacket and each technical section the work needs, with plans, filled out completely.
Bring the packet to the office; the subcode officials review their sections.
Pay the fee the office calculates and request inspections through the online portal.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
State rules give the office 20 business days to act on a complete application. In Clark the common holdups are an application filed before the Zoning Officer has signed off, forms that are not filled out completely, and board approvals for variances or site plans that wait for the monthly Planning Board or the Zoning Board calendar. With inspections on only two days a week, schedule them as soon as each stage is ready.
Inspections and certificates in Clark
Inspections are requested through the township’s online services portal and are performed on Tuesdays and Thursdays, scheduled by availability. Exact arrival times are not given; the inspector arrives some time between 10 a.m. and 4 p.m. Property maintenance concerns are reported through a separate online form.
Selling or renting a property
Every residential, industrial or commercial property sold in Clark needs a Certificate of Resale before the sale; the application is completed and paid online, and the certificate is good for 180 days from issuance. Residential sales also need the online smoke detector inspection form, with its fee paid online. Landlords register every rental unit with the township each year online, with a current certificate of liability insurance (generally at least $500,000; $300,000 may be allowed for owner-occupied buildings of four or fewer units). Units built before 1978 need periodic lead-based paint inspections by a private firm, and the resulting Lead-Safe Certificate, valid for three years, is uploaded with the registration. A commercial change of tenant starts with a zoning permit application. High grass and property maintenance complaints go to the Construction Office, not the Health Department.
New Jersey building code in Clark
Clark applies the New Jersey editions DCA adopted: the 2024 I-codes, the National Standard Plumbing Code and the 2023 NEC since August 17, 2026, and until February 17, 2027 a complete application with its prior approvals may still use the 2021 codes and 2020 NEC. FEMA’s Community Status Book lists the township (community 345290) as a participating National Flood Insurance Program community with flood maps effective September 20, 2006. The Engineering Department also posts a 2023 map of estimated FEMA flood map revisions and shows flood hazard areas on its interactive GIS map; the 2006 maps remain the effective ones.
New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
Want this handled start to finish?
Get a free quote →Clark permit search and official resources
Clark’s permit forms, inspection requests and resale certificates run through its online services portal. Copies of permit files and other records are requested on the township’s online Open Public Records Act form, which the Municipal Clerk or records custodian reviews; police records use a separate form. For a quick look at a lot before you file, the Engineering Department’s interactive GIS map, built with an outside mapping firm, shows zoning districts, flood hazard areas, ward boundaries, recycling zones and open space; the township says it is for general reference, and zoning determinations still come from the office at 732-428-8401. Planning Board and Zoning Board agendas and approved minutes are posted in the township’s Agenda Center, the meetings are recorded and posted online, and the Planning Board page carries the 2023 Master Plan Re-Examination.
- Permits and forms
- Construction Department and inspections
- Construction permit application packet
- Residential housing: Certificate of Resale
- Zoning
- Building setbacks 2023
- Commercial properties
- Planning Board
- Zoning Board
- Engineering Department and GIS map
- Landlord registration
- Health Department
- Environmental health and food licenses
- Before You Dig notice
- Monitoring well access permit application
- Open public records request
- NJ soil conservation district directory
- DCA Local Construction Contacts roster
- DCA construction permit forms
- FEMA Community Status Book, New Jersey
Inspections are where schedules slip.
Get a free quote →Clark building permit FAQs
Do I need a Certificate of Resale to sell my house in Clark?
Yes. Every residential, commercial or industrial sale needs one, applied for and paid online; it is valid for 180 days, and houses also need a smoke detector inspection.
Which days does Clark do inspections?
Tuesdays and Thursdays, booked online; the inspector arrives between 10 a.m. and 4 p.m.
Do I need zoning approval before applying?
Yes, where it applies: all prior approvals from the Zoning Officer must be in hand before the construction application is filed.
What are the setbacks for a shed in an R75 zone?
Accessory buildings in R75 need 5 feet from the rear and side lines, and the lot’s coverage may not pass 30%.
How tall can a house be in Clark?
35 feet and two and a half stories in the one-family zones on the township’s 2023 setback sheet.
Do businesses need a yearly inspection?
Yes. Businesses register every year and have an annual fire inspection by the Clark Fire Department (732-381-1150).
Can I get the permit forms online?
The state forms are linked from the township’s permits page, and the packet is also available at the Construction Office.
Simplify Clark Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Clark Township sooner?
Let Alliance prepare, file, and track your Clark Township permits while your crew stays on the job.
More New Jersey permitting guides
Union County
Read guide →Cranford Township
Read guide →Elizabeth
Read guide →Cliffside Park Borough Building Permit Guide
Read guide →Clifton Building Permit Guide
Read guide →Clinton Township (Hunterdon County) Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Clark Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.