Chatham Township (not Chatham Borough) issues construction permits through its Construction Department in the Municipal Building at 58 Meyersville Road, open weekdays 8:00 a.m. to 3:00 p.m., where Jack Daniels serves as Construction Official and Zoning Officer. Fees follow Ordinance 2026-01, adopted February 24, 2026: $34 per $1,000 for alterations up to $50,000, a $100 minimum per subcode and plan review at 20% of the permit fee. Projects that disturb more than 1,000 square feet, affect drainage near a lot line or involve demolition need a lot grading approval before zoning, and the Board of Health reviews every septic design.
What requires a building permit in Chatham Township?
The department’s rule of thumb: a construction permit is generally required for any building, structural, electrical, HVAC or plumbing project, and no work may begin until a needed permit has been issued. Ordinary maintenance under N.J.A.C. 5:23-2.7 is exempt (the township gives painting, same-size window and door replacement and carpet as examples). Minor work under N.J.A.C. 5:23-2.17A still needs a permit, and Chatham asks for the minor work permit application before the work begins.
Also needs a township permit
- Any road opening, including installing curbing
- Most tree removals (tree contractors register with the township)
- A zoning permit when the footprint, lot coverage or use changes
- A lot grading application for disturbance over 1,000 sq ft, drainage changes within 5 feet of a lot line, demolition, or a critical area under Township Code section 30-6
- New septic systems and septic repairs (Board of Health plan review)
Emergencies
- Work may start at once after the office is notified
- Permit applications are due within 72 hours
- Roof leaks and heater repairs or replacements qualify
- So do other conditions affecting occupants’ safety
What Chatham Township decides and what the state holds
The building code is the state’s. Chatham’s own rules are the fee schedule in Chapter 11 section 11-1.3 (rewritten by Ordinance 2026-01), the Land Development Regulations with their schedule of zoning requirements, the lot grading and critical-area rules, development fees for affordable housing, its own Board of Health for septic systems, and a construction-hours limit (Township Code BH4-3.2): no construction or demolition on Sundays, only 8:00 a.m. to 6:00 p.m. on Saturdays, and 7:00 a.m. to 6:00 p.m. on other days.
Chatham Township building department: who handles permitting
The Construction Department reviews applications, issues permits and inspects residential, commercial and industrial buildings, and it also investigates damaged buildings to make sure they can be safely occupied. The township page names Jack Daniels as Construction Official and Zoning Officer. DCA’s roster as of September 2, 2026 lists the same official (as John K. Daniels) in the construction and building posts, township officials in the electrical and plumbing posts, DCA as elevator subcode official, and leaves the fire protection subcode line blank. Chatham Borough is a separate municipality with its own construction office on Fairmount Avenue.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Construction Department | Municipal Building, 58 Meyersville Road, Chatham, NJ 07928; roster phone 973-406-0309, township main number 973-635-4600; fax 973-635-4002 |
| Hours | Monday to Friday, 8:00 a.m. to 3:00 p.m. |
| Construction Official / Zoning Officer | Jack Daniels |
| Board of Health (septic) | Secretary, 973-635-3209; services by contract with the Union Township Health Department |
| Fire Prevention Bureau | Smoke and CO certificates for sales and rentals |
| Online | SDL portal account for inspections and permit status |
Chatham Township permit types
Applications use the state jacket and technical sections, with the township’s own forms for what surrounds them: the barrier-free worksheet, air barrier checklist, chimney verification, combustion air information form, framing checklist, demolition checklist, COAH (affordable housing) application, lot grading application or waiver request, road opening permit, sanitary sewer and sewer connection applications, soil erosion certification, tree removal permit, and an escrow close-out form.
Residential permits
- Plans: a homeowner may draw the plans for a single-family house he or she lives in; plans are filed in duplicate with the technical sections.
- Fees for common jobs: roof covering or siding $300, a shed $100, an above-ground pool $200 (in-ground pools are priced as alterations), radon systems $100 plus electrical, and a pool enclosure barrier $150.
- Septic: new systems and repairs are designed for Board of Health review, checked by its consulting engineer and inspected in the field by the Union Township Health Department sanitarian.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial plans must be prepared by a New Jersey architect or engineer, filed in duplicate, and followed by final as-built drawings. Commercial fuel-fired appliances, tanks, kitchen hoods and exhaust systems carry higher fire fees than residential ones, and new commercial, industrial or apartment buildings pay $400 for the certificate of occupancy.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the construction permit
- Lot grading. Required first when the project disturbs more than 1,000 square feet, affects drainage within 5 feet of a property line, demolishes a structure or lies in a critical area under section 30-6.
- Zoning permit. The zoning application needs a certified survey and any design plans; an incomplete application gets a notice listing what is missing, and a denial means applying to the appropriate land use board through its administrative secretary.
- Other approvals on the CO checklist: engineering approval, water (American Water) and sewer approvals, PSEG electric and gas, 911 address assignment, historic preservation, fire department, flood hazard permits, health department and state approvals.
- County. All subdivisions, and site plans on a county road or adding more than an acre of impervious cover, go to the Morris County Planning Board; single site plans for one- and two-family homes do not. The township’s own forms include a soil erosion and sediment control certification, and its CO checklist marks county soils approval as part of the township engineering approval; the Morris County Soil Conservation District is at 30 Schuyler Place, Morristown (973-285-2953).
Chatham Township permit costs and fees
Ordinance 2026-01, introduced January 27 and adopted February 24, 2026, restated the township’s construction fees in Chapter 11 section 11-1.3. Each subcode has a $100 minimum, plan review is 20% of the construction permit fee (5% for a prototype plan), and digital plan submissions add $1 per $1,000 of work. Selected fees:
| Item | Fee |
|---|---|
| New construction and additions | $0.06 per cubic foot; minimum $100 ($0.04 for large-volume buildings) |
| Alterations, renovations and repairs | $34 per $1,000 up to $50,000 (minimum $100); an additional $26 per $1,000 above $50,000; $22 per $1,000 over $100,000 |
| Roof covering or siding / shed | $300 / $100 |
| Demolition | $500 one- or two-family; $600 other buildings; $150 pools |
| Plumbing | $35 per fixture or stack; $125 per special device (boiler, AC condenser, sump pump, water softener, lawn sprinkler, generator) |
| Utility connection / capping utilities / septic abandonment | $175 / $195 / $150 |
| HVAC system / gas piping | $150 per system / $75 per connection |
| Mechanical devices | $100 for the first; $75 for each additional |
| Fire: fuel-fired appliance or generator (one-family) | $75 each |
| Fire: residential tank / tank removal up to 2,000 gallons | $140 each |
| Solar supports and footings | $29 per $1,000 up to $30,000; $16 per $1,000 above; minimum $100 |
| Certificates | New one- or two-family $300; addition $150; continued CO $200; change of use $200 |
| Construction records clearance certificate | $50 |
| Inspections outside posted times | $100 an hour, three-hour minimum |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a $40,000 kitchen alteration falls entirely in the first band, so the building fee is 40 × $34 = $1,360. A new sink and dishwasher add 2 × $35 = $70 in plumbing, raised to the $100 subcode minimum, and the state surcharge (N.J.A.C. 5:23-4.19) adds 40 × $1.90 = $76. The ordinance’s wording for jobs above $100,000 can be read more than one way, so ask the department to price large projects. Payment is by cash (exact change) or check to “Township of Chatham”, and a lapsed permit is reinstated for half its original cost. Other charges in the ordinance: $75 to change the contractor or owner on a permit, $150 for a UCC variation request on a one- or two-family house, $300 for a tennis court, and $20 per $1,000 (minimum $300) to move a building to a new foundation.
Trade permits and who may pull them
Electrical, plumbing, fire and mechanical work is filed on the state technical sections, reviewed by each subcode official and signed off last by the Construction Official. New Jersey licenses electrical contractors, master plumbers and HVACR contractors, has no general contractor license, and registers home improvement contractors with the Division of Consumer Affairs; the township’s CO checklist lists a builder, home improvement or Division of Fire Safety license on file as one of its items.
- Plumbing: boilers, AC condensers and coils, water softeners, pressure-reducing valves, sump pumps, lawn sprinklers and radiant floor heat are special devices at $125 each.
- Fire: fuel-fired appliances, tanks, kitchen hoods, fire alarm devices ($100 for the first 12, $15 each after) and extinguishers are priced in the fire part of the schedule; DCA’s September 2, 2026 roster leaves the township’s fire protection subcode post blank, and the township’s page names no one in it.
- Mechanical: furnaces, chimneys and liners, gas appliances and HVAC systems are counted as devices, $100 for the first and $75 for each one after.
Rather not deal with the building department?
Get a free quote →How to apply for a Chatham Township building permit
File the lot grading application, or the waiver request, before the zoning application.
Certified survey and design plans; board approval if the Zoning Officer denies it.
Board of Health for septic, road opening and sewer permits, tree removal, county review if required.
Jacket, technical sections and two sets of plans at 58 Meyersville Road.
Within 20 business days of a complete application the subcodes review, the Construction Official signs off, and the department calls with the total cost.
Pay by cash or check, then book inspections on the SDL portal.
Review, corrections and what causes delay
The 20-business-day clock starts only when the application is complete with every prior approval, which matches the state limit in N.J.A.C. 5:23-2.16; a zoning application missing its survey or plans is returned with an incomplete notice. Amended plans after release are reviewed at $65 an hour per subcode.
Inspections and certificates in Chatham Township
Schedule inspections and check permit status through the township’s SDL portal account. The department follows up every open permit with Notices of Violation and, in some cases, orders to pay penalties under the UCC, so it asks owners to book the final inspection as soon as the work is done. Inspections outside the posted days and times need each inspector’s consent and cost $100 an hour with a three-hour minimum.
The township’s certificate of occupancy checklist shows what must be in before a temporary or final CO: subcode sign-offs, the zoning and board approvals, the engineering approval letter, utility approvals, the remaining half of the affordable housing development fee (half is paid at permit), special inspection documents, and, where they apply, an HVAC balance report, a blower door test and a duct tightness test. A construction records clearance certificate costs $50.
Selling or renting a home
The Fire Prevention Bureau’s smoke detector page applies to homes being sold or rented: battery smoke alarms must be 10-year sealed units, with alarms on each level and outside each sleeping area, carbon monoxide alarms near the sleeping areas where there is a fuel-burning appliance or attached garage, and a portable extinguisher within 10 feet of the kitchen as the state fire code section quoted there describes. In March 2026 the township announced a partnership with LEW Environmental to carry out state-mandated lead paint inspections.
Want this handled start to finish?
Get a free quote →New Jersey building code in Chatham Township
Chatham enforces the Uniform Construction Code as adopted by the state: the 2024 I-codes, 2024 National Standard Plumbing Code and 2023 NEC since August 17, 2026, with the 2021 codes and 2020 NEC still available until February 17, 2027 to applications already complete with all prior approvals. FEMA’s Community Status Book lists Chatham Township (community 340504) as participating in the National Flood Insurance Program, with flood maps dated July 19, 2001.
New Jersey has one Uniform Construction Code for every municipality; the town supplies the enforcing agency, the fee ordinance and the zoning approvals. New Jersey rules
Chatham Township permit search and official resources
The construction page has a permit status lookup, and the SDL portal account shows status and inspections for your own permits. The township also issues a construction records clearance certificate ($50) on its own application form.
- Chatham Township Construction Department
- When is a permit needed
- Construction forms and applications
- Ordinance 2026-01, construction fee schedule (PDF)
- Zoning application process (PDF)
- Certificate of occupancy checklist (PDF)
- SDL portal for Chatham Township
- Board of Health
- Fire Prevention: smoke detectors
- Morris County Planning Board land development review
- Morris County Soil Conservation District
- DCA local construction contacts roster
- FEMA Community Status Book, New Jersey
Inspections are where schedules slip.
Get a free quote →Chatham Township building permit FAQs
How much is a building permit for a renovation in Chatham Township?
$34 per $1,000 of work up to $50,000 under Ordinance 2026-01, with a $100 minimum per subcode, plus plan review and the state surcharge.
What does a re-roofing or re-siding permit cost?
Where the UCC requires a permit for roof covering or siding, Chatham’s fee under Ordinance 2026-01 is $300.
Can I fix a roof leak before getting a permit?
Yes. In an emergency, notify the office and start; the permit applications are due within 72 hours.
When can contractors work?
Weekdays 7:00 a.m. to 6:00 p.m. and Saturdays 8:00 a.m. to 6:00 p.m.; construction and demolition are not allowed on Sundays.
Who approves septic systems?
The Chatham Township Board of Health reviews every new septic design and repair, with field inspections by the Union Township Health Department under contract.
Is Chatham Township the same as Chatham Borough?
No. They are separate municipalities with separate construction offices; Chatham Township’s is at 58 Meyersville Road.
When do I need a lot grading application?
When the project disturbs more than 1,000 square feet, changes drainage within 5 feet of a property line, involves demolition, or is in a critical area.
Simplify Chatham Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New Jersey. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Chatham Township sooner?
Let Alliance prepare, file, and track your Chatham Township permits while your crew stays on the job.
More New Jersey permitting guides
Morris County
Read guide →Denville Township
Read guide →East Hanover Township
Read guide →Cherry Hill Building Permit Guide
Read guide →Cinnaminson Township Building Permit Guide
Read guide →City of Orange Township Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Chatham Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.