Skip to main content
Municipal GuideKentuckyTaylor County · Kentucky

Taylor County, Kentucky Building Permit Guide

To get a building permit in Taylor County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Taylor County has no local building inspection program on HBC’s contact sheet, so the state reviews commercial, apartment and other non-residential projects; Campbellsville issues its own zoning-based permits.

Authority: Kentucky Department of Housing, Buildings and Construction (non-residential)Code: 2018 Kentucky Building and Residential CodesPhone: 502-573-0373
Local building program
None on the HBC sheetsheet updated June 10, 2025
Fiscal court
203 North Court StreetCampbellsville, 270-465-7729
Campbellsville
City Planning and Zoning109 W. Main Street, 270-465-7011
Septic
Health department1880 North Bypass Road, 270-465-4191

The Department of Housing, Buildings and Construction (HBC) lists no local building inspector for Taylor County. Under HBC’s rules, commercial, apartment (three or more units) and other non-residential projects must be submitted to the state for plan review before work starts (502-573-0373), and the published sources show no county building permit for houses. The fiscal court is at 203 North Court Street, Campbellsville (270-465-7729); inside Campbellsville, the city’s Planning and Zoning office issues building permits under its zoning ordinance.

What requires a building permit in Taylor County?

Outside Campbellsville, the answer depends on what you build, because the county runs no building inspection program of its own:

State approval needed

  • Commercial, industrial, institutional and apartment (three or more units) buildings, submitted to HBC before construction
  • A Kentucky industrialized (modular) building, which needs HBC site placement approval for each placement
  • Electrical work (permit and inspection by a certified electrical inspector)
  • Plumbing (state plumbing permit) and HVAC (state HVAC permit)
  • A septic system (health department permit)
  • An entrance on a state highway (Kentucky Transportation Cabinet permit)

No local building permit shown

  • A one- or two-family house or townhouse in the unincorporated county: HBC does not review it, and the county’s published pages show no ordinance requiring a county permit
  • The trade, septic and road permits listed opposite still apply to a house

For a modular building, HBC’s site placement review asks for a site plan, pier or foundation details, tie-down details and all site-built stairs and ramps. Manufactured homes have their own state inspector on HBC’s Taylor County sheet.

What the county decides and what the state holds

A Kentucky county chooses whether to run a building inspection program; it cannot change the code. Taylor County’s fiscal court website lists its offices (clerk, property valuation administrator, road department, emergency management, solid waste, animal shelter, airport and others) but no building, planning or zoning office, and the state sheet, updated June 10, 2025, names no local building inspector. HBC’s jurisdiction page says that where there is no local program, all projects except single-family dwellings go to its Division of Building Code Enforcement; the adopted Kentucky Building Code (Section 104.16) words that exception as dwellings built under the Kentucky Residential Code, which takes in one- and two-family homes and townhouses. Sections 104.15 and 104.16 of the Kentucky Building Code set out the split where a local program does exist.

Short on time to read all of this?

Get a free quote →

Taylor County building department: who handles permitting

HBC’s Taylor County contact sheet lists the state building inspector, manufactured housing inspector, electrical inspector, elevator inspector, HVAC inspector, plumbing inspector and boiler inspector assigned to the county, plus two local electrical inspectors. The county offices that touch a building project are listed below.

Taylor County permitting contacts
OfficeContact
HBC Division of Building Code Enforcement, Building Codes section (plan submittal and approval for non-residential work)502-573-0373; applications through the SmartGov portal
Taylor County Fiscal Court and Judge/Executive203 North Court Street, Campbellsville, KY 42718; 270-465-7729
Taylor County Road Department (county roads)180 Pleasant Drive, Campbellsville; 270-789-1547
Taylor County Clerk (deeds and plats)203 North Court Street; 270-465-6677
Property Valuation Administrator (parcel records)203 North Court Street; 270-465-5811
Taylor County Health Department (septic; state plumbing inspector)1880 North Bypass Road, Campbellsville; 270-465-4191; plumbing inspector office hours Wednesday 8 to 9 a.m. and Friday 8 to 9:30 a.m.
KYTC District 4 (state highways)634 East Dixie Avenue, Elizabethtown; 270-766-5066

Campbellsville

Incorporated city in Taylor County (Census 2025 estimate)
CityWho issues permits
Campbellsville (11,783)City Planning and Zoning, 109 W. Main Street (270-465-7011): its zoning ordinance requires a building permit from the city’s Building Inspector for any building or accessory building, and a certificate of occupancy before use. HBC’s sheet lists no local building-code inspector for the city either.

Taylor County permit types

Residential permits

Building a house in the unincorporated county means collecting the permits that apply to every home rather than a county building permit: an onsite sewage permit from the Taylor County Health Department where there is no sewer, an electrical permit with inspection by a certified electrical inspector, a state plumbing permit, and a state HVAC permit bought by a licensed contractor. A modular home built to the Kentucky industrialized building program needs HBC’s site placement approval, and a manufactured home is inspected under the state’s manufactured housing program. Inside Campbellsville, the city’s own building permit is required for houses, additions and accessory buildings.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and other non-residential projects anywhere in the county go to HBC’s Building Codes section for plan review and approval before construction, through the department’s SmartGov portal; questions about whether HBC has jurisdiction go to 502-573-0373. HBC’s state building inspector for Taylor County then inspects the work. A Campbellsville site also needs the city’s zoning-based permit, fire and engineering review of the plot plan, and the city’s stormwater permit.

What comes before the building permit

  • Zoning. The fiscal court’s website shows no county zoning office; Campbellsville has a planning commission, zoning ordinance and Board of Zoning Adjustment for land inside the city.
  • Septic. Apply to the health department at 1880 North Bypass Road before building on an unsewered lot.
  • Roads. An entrance on a state highway needs a KYTC encroachment permit from District 4; county road questions go to the road department on Pleasant Drive.
  • Floodplain. Taylor County participates in the National Flood Insurance Program, so check the flood map before building near a stream and ask the fiscal court office how the county handles floodplain development.
  • Records. Deeds and plats are recorded with the county clerk, and parcel data is kept by the property valuation administrator, both at 203 North Court Street.

Taylor County permit fees

Because the county runs no building permit program, it publishes no building permit fees. The fees on a Taylor County project are the state’s and those of the health department:

Rather talk it over?

Call 1-855-478-4290 →
Fees on a Taylor County project
ItemFee
County building permitNone: no county program on the HBC sheet
State plumbing permit, one- or two-family home$50 base fee plus $14 per opening (HBC, from March 1, 2022)
State plumbing permit, water heater only$50
State plumbing permit, commercial$50 base fee plus $20 per opening
HVAC permitBought by the licensed contractor through HBC’s SmartGov portal
Non-residential plan reviewSet by HBC
Septic permitTaylor County Health Department
Campbellsville building permitSet by the city; call 270-465-7011

Worked example. A new house in the county with 12 plumbing openings pays HBC $50 + 12 × $14 = $218 for the plumbing permit. A house with 20 openings pays $50 + 20 × $14 = $330. There is no county building permit fee to add.

Trade permits and who may pull them

  • Electrical. Electrical work needs a permit and an inspection by a certified electrical inspector. HBC’s Taylor County sheet lists two local electrical inspectors as well as the state electrical inspector; ask either for the permit. HBC licenses electrical contractors and electricians, and a homeowner may do the electrical work on their own home with a permit.
  • Plumbing. HBC’s plumbing inspector for the county keeps office hours at the health department on Wednesday (8 to 9 a.m.) and Friday (8 to 9:30 a.m.). HBC’s plumbing division issues permits to licensed master plumbers, or to homeowners for plumbing in their own personal residence; other plumbing work must be done by a licensed journeyman under a licensed master plumber.
  • HVAC. Licensed HVAC contractors buy permits through HBC’s SmartGov portal; the state HVAC inspector for the county inspects.
  • Elevators and boilers. Each has its own state inspector on the sheet.

Rather not deal with the Taylor County building department?

Get a free quote →

How to get permits for a Taylor County project

1. Check the location

Inside Campbellsville, start with the city’s Planning and Zoning office; elsewhere, the state and trade permits apply.

2. Decide who reviews the building

A one- or two-family home or townhouse needs no state plan review; apartment buildings and commercial or other non-residential buildings go to HBC before construction.

3. Submit non-residential plans to HBC

Through SmartGov, with the construction documents for the building.

4. Get the septic permit

From the Taylor County Health Department on an unsewered lot.

5. Arrange road access

KYTC District 4 for a state highway entrance; the road department for county roads.

6. Pull the trade permits

Electrical through a certified electrical inspector, plumbing and HVAC through HBC.

Review, corrections and what causes delay

The biggest risk is starting a non-residential building without HBC approval on the assumption that no county office means no review: HBC’s rule is that such projects are submitted before construction begins. Another is building a house without the septic permit or the trade inspections, which still apply where there is no county permit. For a project near Campbellsville, confirm whether the lot is inside the city limits before you file, because the city’s permit, fire and engineering review and stormwater permit apply only inside.

Inspections in Taylor County

For buildings HBC approves, the state building inspector assigned to Taylor County makes the inspections. Electrical inspections are made by a certified electrical inspector (local or state), plumbing by the state plumbing inspector, and heating and air by the state HVAC inspector; schedule each one through the inspector who covers the county on HBC’s sheet. Modular units are inspected in the factory by an approved third-party agency, and each placement needs HBC’s approval. Inside Campbellsville, the city’s Building Inspector makes a final inspection within three days of notice and issues the certificate of occupancy.

Kentucky building code in Taylor County

With no local program, HBC enforces the 2018 Kentucky Building Code on Taylor County’s non-residential buildings directly. FEMA’s Community Status Book lists both Taylor County and Campbellsville as participating in the National Flood Insurance Program, on flood maps dated May 24, 2011.

Want this handled start to finish?

Get a free quote →

Kentucky has one mandatory statewide building code that local governments may not add to. Cities and counties enforce it and run zoning. The state reviews plans for larger and higher-risk buildings, and the local program reviews smaller ones. Kentucky rules

Taylor County permit search and official resources

For state-reviewed buildings, HBC’s Building Codes section offers an online plan search, and state applications are filed through its SmartGov portal. County records (deeds, plats, parcel data) are at the clerk’s and PVA offices at 203 North Court Street; a request for fiscal court records goes to the fiscal court office.

Inspections are where schedules slip.

Get a free quote →

Taylor County permit FAQs

Does Taylor County issue building permits?

The published sources show no county building inspection program: HBC’s contact sheet names no local building inspector, and the county’s website lists no building office.

Do I need a permit to build a house in the county?

No county building permit is shown for a single-family home, and HBC does not review houses. You still need septic, electrical, plumbing and HVAC permits.

Who reviews a commercial building in Taylor County?

HBC’s Division of Building Code Enforcement, before construction starts (502-573-0373, SmartGov portal).

What about Campbellsville?

The city requires its own building permit for any building, including accessory buildings; apply at Planning and Zoning, 109 W. Main Street (270-465-7011).

Where do I get a septic permit?

The Taylor County Health Department, 1880 North Bypass Road, Campbellsville (270-465-4191).

Can I do my own plumbing?

Yes, in your own residence, with a homeowner plumbing permit from HBC.

Who inspects electrical work?

A certified electrical inspector; HBC’s sheet lists two local electrical inspectors and the state electrical inspector for the county.

Simplify Taylor County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Kentucky. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Taylor County sooner?

Let Alliance prepare, file, and track your Taylor County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Taylor County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.