Garrard County requires a county building permit for houses and business buildings. Its building inspection program, approved by the state as a Level 1 program, works from Building Code Enforcement at 15 Public Square, Suite 3, Lancaster (859-339-0739), and the state’s contact sheet says it covers the City of Lancaster too. A new house needs a septic soil evaluation from the health department before the permit, sits on at least 1 acre with 150 feet of road frontage unless the fiscal court grants an exception, and is typically inspected four times. The county has no planning and zoning.
What requires a building permit in Garrard County?
Ordinance No. 0-4-9-18-1, amended September 30, 2024 and March 10, 2025, sets up the county’s building inspection program under KRS 198B.060(8). It applies to all buildings, including single-family dwellings, with one carve-out: on parcels of more than 10 acres it reaches only residential and business structures, so other buildings there fall outside it.
County permit needed
- New houses and additions
- Business and change-of-occupancy work
- Attached garages, decks, porches, pavilions and outbuildings (boxes on the application)
- Manufactured and mobile homes (placement and habitation permit)
- Tiny homes and other pre-manufactured dwellings, treated as mobile homes
- Floating docks, mooring and swim platforms (water structure permit)
Outside the county program
- Structures other than residential and business ones on parcels over 10 acres
- A dwelling, barn, garage or other building on a farm of 10 acres or more covered by a farmstead exemption permit
- Inspection of retaining walls (walls over 4 feet still need an architect’s or engineer’s plan)
The ordinance adds site rules a builder must follow: silt and mud kept off neighboring land and roads, unsafe conditions marked or fenced, no burying or burning of construction waste, and a portable toilet on each work site. Everyone working in the county registers with the occupational tax administrator for a vendor number.
What the county decides and what the state holds
Garrard County adopts the Kentucky Building Code and Kentucky Residential Code by reference, plus the state plumbing code and the National Electrical Code edition HBC has adopted. In June 2026 the fiscal court attached the 2018 International Existing Building Code to the ordinance, after the building inspector reported that many older buildings being refurbished could not meet the new-construction rules. The state Department of Housing, Buildings and Construction (HBC) still reviews and inspects the larger and higher-risk buildings the Kentucky Building Code reserves to it. The county has no planning and zoning: its attorney told the court in November 2025 that without it the court can only check projects against the ordinance’s specifications.
Garrard County building department: who handles permitting
Building Code Enforcement issues building permits and inspects; the Judge/Executive’s office issues the manufactured home, tiny home, water structure and farmstead permits, and the fiscal court approves plats and grants lot-size exceptions. HBC’s Garrard County contact sheet, updated June 12, 2026, names the local building inspector as including the City of Lancaster and lists the state building, manufactured housing, electrical, elevator, HVAC, plumbing and boiler inspectors for the county.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Building Code Enforcement (building permits, inspections) | 15 Public Square, Suite 3, Lancaster, KY 40444; 859-339-0739 |
| Garrard County Fiscal Court and Judge/Executive (manufactured homes, docks, farmstead exemptions) | 15 Public Square, Lancaster; 859-792-3531; fax 859-792-2010 |
| Garrard County Road Department (culverts) | 859-792-3531 |
| Garrard County Health Department (septic; state plumbing inspector) | 89 Farra Drive, Lancaster; 859-792-2153; plumbing inspector Wednesday, 8 to 9:30 a.m. |
| City of Lancaster (city zoning, business license) | City Hall, 308 West Maple Avenue; 859-792-2241 |
| KYTC District 7 permits (state highways) | 800 Newtown Court, Lexington; 859-246-2355 |
Lancaster, the only city
| City | Building inspection | Zoning |
|---|---|---|
| Lancaster (4,111) | County building inspector (HBC sheet: “includes City of Lancaster”) | The city’s own planning and zoning ordinances, which the county ordinance says also bind mobile homes in the city |
Garrard County permit types
The county building permit application (document AF01) is one page: applicant, site address, total square footage and a box for each project type, plus two screening questions, whether the lot is at least 1 acre and whether it lies in a flood zone. By signing, the applicant accepts that no dwelling may be occupied without a certificate of occupancy and that builders and contractors must register with the county tax office and carry workers’ compensation and liability insurance.
Residential permits
For a new house the county asks for the septic soil evaluation report, the property address, plans with a typical wall section, floor plan and lot diagram, any deed or neighborhood restrictions, truss diagrams and engineered beam sizing where used, and the workers’ affidavit of assurances. A dwelling needs a lot of at least 1 acre and 150 feet of road frontage unless the fiscal court grants an exception or variance, and each parcel may hold only one dwelling. Manufactured homes need septic or sewer approval and an electric permit before the placement permit, a certified installer, skirting within 60 days and a certificate of occupancy after two inspections. A tiny home must get its own address and sit on a permanent foundation, carry an engineer’s or architect’s letter, or be set like a mobile home by a licensed installer.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Business buildings use the same application with the commercial/change-of-occupancy box, and the county guidelines tell owners to ask the health department about the extra steps for any business. Buildings above the state’s thresholds also need HBC plan approval.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Septic. A soil evaluation from the health department, then a septic permit for the certified installer.
- Lot and plat. New lots go to the fiscal court as plats; the court has approved subdivisions whose lots exceed 1 acre with the required frontage.
- Subdivision roads. Under the subdivision regulations, a developer posts a roadway completion bond and builds the road base and asphalt base to county specifications before any building permits are issued, with Road Foreman inspections at each phase.
- Culverts and state roads. Under the county drainage ordinance, the Road Supervisor decides whether a new driveway onto a county road needs a culvert, the property owner pays for it, and it must meet the state transportation drainage specifications the county adopted; no drain may send water onto a county road. Entrances on state highways go through KYTC District 7.
- Flood zones. A construction-in-a-floodplain permit, and a state Water Quality Certification for any work that disturbs a stream.
- Data centers. The fiscal court passed a data center ordinance on second reading on July 27, 2026, after setting its setback at 2,000 feet at first reading; with no zoning, the court said a moratorium was not available.
Garrard County permit fees
Section 8 of the building ordinance leaves building permit and inspection fees to orders of the fiscal court. The fee sheet posted on the Building Code Enforcement page, headed “Garrard County Building Permit Fees” and marked “Effective 2017”, prices a house by floor area; it cites no fiscal court order, so confirm the charge with Building Code Enforcement (859-339-0739) before you apply. The ordinance lets the Judge/Executive set reasonable charges for manufactured home permits and inspections, and it says the State Electrical Inspector sets electrical permit and inspection fees.
| Item | Fee |
|---|---|
| House, 1,999 sq ft or less | $200 |
| House, 2,000 to 3,000 sq ft | $250 |
| House, 3,001 to 4,000 sq ft | $300 |
| House, 4,001 sq ft and greater | $350 |
| Room addition | $100 |
| Decks, porches and similar | $50 |
| Accessory building under 144 sq ft / 144 to 750 sq ft / next band (printed “750”) | $25 / $50 / $100 |
| In-ground pool | $50 |
| Mobile home | $150 |
| Commercial: assembly, high hazard, institutional | 16 cents per sq ft |
| Commercial: business, day care, educational, industrial, mercantile, residential, storage | 15 cents per sq ft |
| Utility and miscellaneous / production greenhouse | 13 cents / 10 cents per sq ft |
| Type 1 commercial exhaust hood | $100 |
Rather talk it over?
Call 1-855-478-4290 →Lancaster-only charges on the same sheet include signs ($25 plus $1 per square foot over 4), business awnings and carports ($20), demolition ($75), cell tower applications ($2,500), zone changes and plats.
| Item | Fee |
|---|---|
| Septic soil evaluation (health department guidelines) | $200 |
| Septic system permit (health department guidelines) | $250 |
| State plumbing permit, one- or two-family home | $50 base plus $14 per opening (HBC) |
| State plumbing permit, water heater only | $50 (HBC) |
| State plumbing permit, commercial | $50 base plus $20 per opening (HBC) |
| Building ordinance violation | $25 to $500 fine per offense |
Worked example. A 2,400 sq ft house with 12 plumbing openings: $250 county permit + $200 soil evaluation + $250 septic permit + $50 + (12 × $14) = $218 plumbing, or $918 before the HVAC and electrical fees. The septic figures come from guidelines posted in March 2024, so confirm them with the health department.
Trade permits and who may pull them
- Electrical. The state contact sheet sends applicants to the Judge/Executive’s office, or to the city office for work inside Lancaster, for the local electrical inspector, and the county application lists that inspector for electrical inspections. HBC licenses electricians and electrical contractors, and an owner may wire their own home with a permit.
- Plumbing. HBC’s state plumbing inspector keeps office hours at the health department on Wednesdays from 8 to 9:30 a.m., and the county guidelines say the septic permit must be issued before the plumbing permit. HBC issues plumbing permits to licensed master plumbers or to homeowners for plumbing in their own residence.
- HVAC. Permits come from HBC’s Division of HVAC (502-573-0395), bought online by licensed contractors; the state HVAC inspector covers the county.
- Manufactured homes and elevators. Each has its own state inspector on the HBC sheet.
Kentucky has no state general contractor license; Garrard County’s own requirement is the occupational tax registration and the insurance named on the application.
Rather not deal with the Garrard County building department?
Get a free quote →How to apply for a Garrard County building permit
At least 1 acre and 150 feet of road frontage for a dwelling, one dwelling per parcel, and whether it is in a flood zone.
Apply at the health department, 89 Farra Drive, and have a backhoe on site for the test pits.
Floor plan, typical wall section, lot diagram, truss and beam details, and any deed restrictions.
Contractors register with the county tax administrator and sign the affidavit of assurances.
Turn in form AF01 with the soil report at Building Code Enforcement, 15 Public Square, Suite 3.
Septic installer permit, state plumbing and HVAC permits, electrical permit, and a culvert or KYTC entrance if needed.
Review, corrections and what causes delay
A lot under 1 acre or short of 150 feet of frontage needs a fiscal court exception or variance, which waits for a court meeting. In a new subdivision, permits wait until the developer’s bonded road base is in. Buildings on state jurisdiction need HBC plan approval first. Anyone affected by a notice under the building ordinance may ask the fiscal court for a hearing by written petition filed with the Judge/Executive within 20 days.
Inspections in Garrard County
New construction typically gets four county inspections: footer and foundation, framing, insulation and final. The application makes the owner responsible for calling inspectors in time and tells anyone who missed an inspection or the certificate of occupancy to contact the office at once. Manufactured homes get two: a review of the site sketch, septic approval, installation instructions or seal and installer, then a field check of skirting, crawl-space ventilation and access, vents, utility approvals, landings, decks and final grade. Docks are inspected before they are finished and used. A building framed with engineered lumber (I-joists, truss joists, truss rafters, laminated beams or studs) must carry a reflective sticker from Building Code Enforcement on each electric meter, so firefighters know how it was built. Plumbing, HVAC and electrical work is inspected by the trade inspectors, and the septic system must be installed and approved before anyone moves in.
Kentucky building code
The county ordinance adopts the state codes and, since June 8, 2026, the 2018 International Existing Building Code for work on older buildings. FEMA’s Community Status Book lists Garrard County as participating in the National Flood Insurance Program on a flood map dated December 21, 2017; the county’s code enforcement office helps owners find mapped flood areas and explains letters of map amendment, which need a surveyor’s elevation certificate.
Kentucky has one mandatory statewide building code that local governments may not add to. Cities and counties enforce it and run zoning. The state reviews plans for larger and higher-risk buildings, and the local program reviews smaller ones. Kentucky rules
Garrard County permit search and official resources
Building permit files are kept by Building Code Enforcement and manufactured home, dock and farmstead files by the Judge/Executive’s office; the county site has an Open Records Request page for copies. Fiscal court minutes, with each reading of the ordinance amendments, are on the Minutes page.
Want this handled start to finish?
Get a free quote →- Garrard County Building Code Enforcement
- Building ordinance 0-4-9-18-1 as amended March 10, 2025
- County building permit fee sheet (effective 2017)
- County building permit application
- Workers affidavit of assurances
- Health department guidelines for sewage, plumbing and building permits
- Farmstead exemption instructions and affidavit
- Tiny home affidavit
- Floodplain enforcement
- County forms
- County ordinances
- Fiscal court minutes
- Minutes, June 9, 2025: farmstead exemption permits
- Minutes, January 27, 2026: subdivision road bonds
- Minutes, June 8, 2026: existing building code amendment adopted
- Minutes, July 13, 2026: data center ordinance, first reading
- Minutes, July 27, 2026: data center ordinance, second reading
- City of Lancaster
- HBC Garrard County inspector contact sheet
- HBC Building Codes: state and local jurisdiction
- HBC Division of Plumbing: permits and fees
- HBC Division of HVAC
- HBC SmartGov portal
- KYTC district permit contacts
- FEMA Community Status Book, Kentucky
Inspections are where schedules slip.
Get a free quote →Garrard County permit FAQs
Does a new house in Garrard County need a building permit?
Yes. The county’s Level 1 program covers single-family dwellings, unless the house is on a farm and the owner files a farmstead exemption.
How much is a county building permit for a house?
$200 to $350 by floor area on the county’s posted fee sheet (effective 2017), for example $250 for 2,000 to 3,000 sq ft; confirm the current charge with Building Code Enforcement.
How big must my lot be?
At least 1 acre with 150 feet of road frontage for a dwelling or a manufactured home, unless the fiscal court grants an exception or variance.
Who issues permits in Lancaster?
The county building inspector covers the city, per the state contact sheet; zoning inside Lancaster is the city’s.
Can I build on my farm without a permit?
Since June 2025 the county offers a farmstead exemption for farms of 10 acres or more in farming use: a notarized affidavit, an agricultural exemption number from the Department of Revenue and a PVA plat. A farm dwelling still needs 150 feet of road frontage.
How much does a septic system cost to permit?
The health department guidelines list $200 for the soil evaluation and $250 for the septic permit.
Do I need a permit for a boat dock on Herrington Lake?
Yes, a water structure permit from the Judge/Executive’s office, with marine-grade floats and an inspection before use.
Does Garrard County have zoning?
No. The county regulates by ordinance (building, subdivision, solar, data centers); Lancaster has its own zoning.
Simplify Garrard County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Kentucky. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Garrard County sooner?
Let Alliance prepare, file, and track your Garrard County permits while your crew stays on the job.
More Kentucky permitting guides
Madison County
Read guide →Jessamine County
Read guide →Lincoln County
Read guide →Georgetown Building Permit Guide
Read guide →Glasgow Building Permit Guide
Read guide →Grant County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Garrard County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.