Medford is the largest city in southern Oregon at about eighty-nine thousand residents, the commercial, medical and retail hub of the Rogue Valley in Jackson County. Building permits are issued by the city’s Building Safety Division, which handles plan review, permits and inspections under the uniform statewide code, in a region still rebuilding after the destructive 2020 fires.
This guide covers the Building Safety Division and how to reach it, the uniform statewide code, the current wildfire-mitigation picture after the 2025 repeal of the statewide map, and how fees and inspections work.
This guide covers work inside the City of Medford limits. Jackson County and neighbouring Central Point, Phoenix and Ashland are separate authorities.
Medford anchors a Rogue Valley that is still rebuilding after the 2020 fires, and the wildfire rules changed in 2025. After the state repealed its statewide wildfire hazard map and mandatory defensible-space requirements, wildfire mitigation is now a local decision — confirm what standards, if any, the city applies. The Building Safety Division administers the uniform state code, with land-use and design review alongside.
What requires a building permit in Medford?
Oregon runs a single, uniform building code statewide — the Oregon Specialty Codes, administered by the Building Codes Division of the Department of Consumer and Business Services. The code is the same in every jurisdiction; what varies is who administers it and the local land-use approvals layered on top. So in Medford, the technical requirements come from the state code, while the Building Safety Division handles the permit, the inspections and the zoning and land-use side.
Permit required
- New residential and commercial construction, additions, alterations and conversions
- Structural and load-bearing work, foundations, decks over the exempt height, and retaining walls above the code threshold
- Finishing basements and attics, garage conversions and any change of use or occupancy
- Electrical work under the Oregon Electrical Specialty Code, including services, circuits, solar and EV charging
- Plumbing under the Oregon Plumbing Specialty Code, and mechanical work under the mechanical code
- Re-roofing above the exempt scope, siding, most window changes, pools, signs and demolition
Typically exempt
- Painting, papering, tiling, carpeting, cabinets and similar finish work
- One-story detached accessory structures below the code floor-area exemption
- Wood, wire-mesh and chain-link fences, exempt by statewide code
- Minor repairs replacing materials in kind, and like-for-like fixture swaps
Because the exemptions are written into the statewide code, they are consistent across Oregon — but an exemption from a building permit is never an exemption from zoning, land use, floodplain rules or an electrical or plumbing permit. Confirm scope with the Building Safety Division before work starts rather than after.
Which code applies — OSSC or ORSC
The Oregon Residential Specialty Code (ORSC) governs one- and two-family dwellings and townhouses and their accessory structures; the Oregon Structural Specialty Code (OSSC) governs commercial buildings, apartments of three or more units and everything outside the residential scope. Alongside them sit the mechanical, plumbing, electrical, energy and fire specialty codes. In Medford, the city’s Building Safety Division administers the state code alongside land-use review; with the statewide wildfire map repealed in 2025, any wildfire-mitigation standards are now set locally.
Two design factors reach nearly every Oregon project. Seismic design under the Cascadia Subduction Zone affects foundations, connections and lateral bracing across much of the state, with site-specific values available through the state Design Criteria Hub. And Oregon’s statewide land-use system means a building permit sits downstream of zoning and land-use compatibility — the land-use question is settled first.
Who handles permitting in Medford?
The Building Safety Division handles plan review, permit issuance and inspections inside the city, with land-use and planning review alongside.
| Detail | Information |
|---|---|
| Authority | City of Medford Building Safety Division |
| Offices | Medford |
| Serves | Work inside the City of Medford limits |
| Region | Commercial, medical and retail hub of the Rogue Valley |
| Wildfire | Statewide map repealed in 2025; mitigation now set locally |
| Code | Oregon Specialty Codes (uniform statewide) |
| Seismic | Design via the state Design Criteria Hub |
| Contractor credentials | CCB licence required regardless of value |
The Building Safety Division reviews plans, issues permits and inspects construction inside the city. Wildfire recovery has been a defining recent theme in the Rogue Valley; since the state repealed the statewide wildfire hazard map and its mandatory defensible-space and construction requirements in 2025, any wildfire-mitigation standards now come from the city or an adopted model code. Land-use and design review can clear ahead of the building permit.
As the regional medical and retail hub, Medford keeps commercial and institutional volume high; the technical code is the uniform state code.
Permit types
Residential permits
Residential work includes continued rebuilding alongside infill and subdivision growth. Re-roofs, solar and EV chargers need permits, any local defensible-space standard should be confirmed, and every contractor must hold a current CCB licence regardless of the size of the job.
How Oregon contractor licensing works
Oregon licensing runs through the Construction Contractors Board (CCB), and its defining feature is that it has no dollar threshold: general contractors, specialty contractors and subcontractors must all hold a current CCB licence to bid or perform construction, regardless of the size or value of the job. This is the opposite of the value-triggered systems in many states.
In Oregon, the licensing question is answered before you look at the project value, not after. Almost any construction for pay requires a CCB licence, so the check is simply whether the contractor holds a current one in the right structure. A narrow exemption lets homeowners do certain work on their own primary residence, but a homeowner who hires out the work is expected to use CCB-licensed contractors.
Commercial permits
Commercial work runs from the regional medical centre and retail corridors to office and institutional projects, all subject to plan review, land use, and the CCB licence requirement, with electrical and plumbing tied to state-licensed installers.
Credentials: CCB plus state trade licensing
Beyond the CCB licence, the trades are licensed by the state: electricians and electrical contractors under the Oregon Electrical Specialty Code, and plumbers under the plumbing code, both administered through the Building Codes Division. So an electrical or plumbing permit is tied to a state-licensed installer, not just a CCB registration. Confirm the CCB licence and the relevant trade licence before filing rather than after the first correction notice.
Medford permit costs and fees
Budget the city building permit and plan-review fees, the statewide surcharge, separate trade permits, and any land-use or design review a parcel triggers. Fees follow Oregon’s statewide valuation method with the city schedule.
| Fee component | How it works |
|---|---|
| Building permit | Based on Oregon’s statewide valuation method; the schedule is set locally |
| Plan review | A percentage of the building permit fee, charged at submittal |
| Trade permits | Separate electrical, plumbing and mechanical fees |
| State surcharge | A statewide percentage surcharge added to permit fees |
| Land-use review | Zoning, design or land-use review where the project triggers it |
| Re-inspections and revisions | Additional fees for failed inspections, revisions and expired permits |
Oregon uses statewide valuation methods to calculate building-permit fees, but the schedules and the plan-review percentages are set by each jurisdiction, and a statewide surcharge is added on top. A figure quoted from a neighbouring city or an older packet is not a reliable number, so ask the Building Safety Division for the schedule in force on your filing date, and ask separately about plan review, trade permits, the state surcharge and any land-use review fees.
Need a real number for a specific Medford project? Send us the scope, address and valuation and we will identify the filing path, the reviews it will trigger and the fee categories that will apply.
Trade permits and who may pull them
Trade permits are separate from the building permit and are issued to the state-licensed installer. Because Oregon licenses electricians and plumbers at the state level and requires a CCB licence for the contracting business, the credential check has two parts on almost every project: the CCB licence and the relevant trade licence. Confirm both before filing.
Oregon’s trade licensing is a state system, so it is consistent across jurisdictions. An electrical permit is tied to a state-licensed electrical contractor and a plumbing permit to a state-licensed plumbing contractor, wherever the project is. What varies locally is the counter that issues the permit and the inspection schedule, not the licence itself.
- Electrical work is permitted under the Oregon Electrical Specialty Code and tied to a state-licensed electrical contractor.
- Plumbing work is permitted under the plumbing code and tied to a state-licensed plumbing contractor.
- Mechanical work is permitted under the mechanical code; the CCB licence still applies to the business.
Permit required
- Service installations, panel upgrades, new circuits, solar PV and EV chargers
- New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
- HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
- Sprinkler, standpipe and fire alarm work on commercial and multi-family structures
Typically exempt
- Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
- Clearing a stoppage without replacing or rearranging concealed piping
- Filter, thermostat and routine component service
- Like-for-like appliance repair that does not alter the connection
How to apply for a Medford building permit
Central Point, Phoenix, Ashland and unincorporated ground are separate authorities.
The statewide map was repealed in 2025; any standards are now local.
Some parcels raise it ahead of the building permit.
Oregon requires it regardless of project value.
Trade permits are tied to state-licensed installers.
Confirm the sets and forms Building Safety needs.
Review, corrections and what actually causes delay
In Oregon, delay tends to come from the land-use and site side rather than the code text, since the code itself is uniform statewide. The common causes are an unresolved zoning or land-use question, a seismic or site-design value that was not pulled from the Design Criteria Hub, a missing CCB or trade licence, or a submittal that did not match what the Building Safety Division needs. Settle the land-use question first, then file the building permit.
Approvals do not stay live indefinitely. An Oregon building permit carries a validity period and can expire if work does not start or stalls between inspections. On phased work or a project waiting on financing, confirm the expiry before it passes — reviving a lapsed permit is more work than keeping one active.
Inspections in Medford
Standard checkpoints include footing and foundation, under-floor and slab, framing, rough-in electrical, plumbing and mechanical, insulation and energy, fire systems on commercial work, and final, with occupancy approval before use. Rebuild and wildland-interface work adds site and, where locally required, defensible-space verification.
Many Oregon jurisdictions schedule inspections online or by interactive phone system, often through the state ePermitting platform; confirm the method the Building Safety Division uses and give the notice it asks for.
Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, the seismic and energy documentation, product listings and your correction responses available on site.
Medford permit search and official resources
Permit records in Oregon sit with the authority that issued them — where the Building Safety Division administers the code, it holds the building permit, the inspection history and the certificate of occupancy for work in the City of Medford limits. Many jurisdictions expose permit search through the state ePermitting portal. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was.
The code is statewide, but the counter is local. Fees, submittal lists, review turnaround and land-use requirements are set by the administering jurisdiction; the technical code is not. Confirm current requirements, fees and review turnaround for your filing date.
These are the primary sources behind this guide. Codes, fee schedules and portal procedures change — confirm the position for your filing date.
- City of Medford Building Safety
- Oregon Building Codes Division
- Oregon Construction Contractors Board (CCB)
- Oregon State Fire Marshal (defensible space)
- Oregon Design Criteria Hub (seismic and site)
Frequently asked questions
Where do I get a Medford building permit?
From the city’s Building Safety Division, which handles plan review, permits and inspections inside the city.
Do I have to meet statewide wildfire building rules?
Not automatically. Oregon repealed its statewide wildfire hazard map and mandatory defensible-space requirements in 2025; any wildfire standards are now set locally, so confirm the city’s position.
Is the building code different from Jackson County?
No. Oregon runs one uniform code statewide; what differs is the administering office, the fee schedule and the land-use rules.
Do I need a contractor licence for a small Medford job?
Yes. Oregon requires a current CCB licence for construction regardless of value; a narrow exemption covers homeowners on their own residence.
Is wildfire rebuilding still active here?
Yes. The Rogue Valley continues to rebuild after the destructive 2020 fires, alongside normal construction.
How do I run a Medford permit search?
Use the city’s permit portal or the state ePermitting system; the permit and inspection history sit with the city.
Simplify Medford permitting with Alliance Permitting
Medford anchors a Rogue Valley still rebuilding after 2020, and the wildfire rules changed in 2025. Confirming jurisdiction, land use and the current local mitigation position up front keeps a southern Oregon project on track.
Trusted by leading builders, developers, and national contractors — 22 years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Medford because the work is done by people who have stood at the counter:
- We confirm city-versus-county jurisdiction from the parcel.
- We confirm the current local wildfire-mitigation position.
- We clear land-use and design review before the building permit.
- We verify every contractor holds a current CCB licence.
- We assemble the city plan set and track the review.
Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Medford sooner?
Let Alliance prepare, file, and track your Medford permits while your crew stays on the job.