Municipal Guide Arizona Yavapai County · Arizona

Yavapai County Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Yavapai County building permit — the four units inside Development Services and what each one controls, the twenty eighteen codes and the specific exemptions written into the county's amendments, the ADEQ-delegated wastewater role that makes this county its own environmental regulator, the temporary dwelling permit that lets you live on site while you build, and how enforcement escalates.

Authority: Yavapai County Development Services DepartmentCodes: The twenty eighteen building codes with county amendmentsEnvironmental: On-site wastewater delegated from the state agency
Codes
Twenty eighteenAdopted with county amendments
Wastewater
The county does itDelegated from the state agency
Live on site
Twenty-four monthsWhile you build the house
Grading
Always permittedThroughout the unincorporated county

Building permits in unincorporated Yavapai County are issued by the Development Services Department through four units: Building Safety, Customer Service and Permitting, Environmental Services, and Land Use and Planning. This is a county that regulates its own water and wastewater under state delegation, which changes how a rural project runs.

This guide covers what requires a permit in unincorporated Yavapai County — including grading — the twenty eighteen codes and the precise exemptions written into the county amendments, the ADEQ-delegated wastewater role, the temporary dwelling permit that lets you live on site while you build, and how enforcement escalates.

This guide covers unincorporated Yavapai County. Prescott, Prescott Valley, Sedona, Cottonwood and the other towns are separate.

📍

You can live on site while you build — for twenty-four months. The county issues a temporary dwelling or office permit allowing occupancy of temporary housing, including travel trailers, recreational vehicles, park models and single-wide manufactured homes, during construction of a permanent dwelling. The allowance runs for twenty-four months from issuance. On a rural owner-build that provision is often what makes the project possible — but it is a fixed window that starts at issuance, not at first inspection.

What requires a permit in Yavapai County?

The Yavapai County Development Services Department handles development and construction-related services through four units: Building Safety, Customer Service and Permitting, Environmental Services, and Land Use and Planning. Permits for buildings, structures and grading are required in all of the unincorporated areas of Yavapai County — grading being included explicitly, which catches out people who assume earthwork is separate from building.

Yavapai County has adopted the twenty eighteen building codes, including the twenty eighteen International Building Code with specified appendices, adopted by reference by the Board of Supervisors with county amendments. That is behind the Phoenix-area cities and behind Pima County — and the county has been candid that this was partly deliberate, framing the twenty eighteen codes as carrying a layer of common sense and a reduction in the cost to construct a home, as part of a wider effort to reduce regulation.

The county's amendments carry precise exemptions worth knowing. Water tanks supported directly upon grade are exempt where the capacity does not exceed five thousand gallons and the ratio of height to diameter or width does not exceed two to one. Uncovered decks are exempt where they do not exceed two hundred square feet, are not more than thirty inches above grade at any point, are not attached to a dwelling, and do not serve the exit door required by the residential code. Every clause in those two tests has to hold.

Enforcement is not nominal. Violations are handled through the enforcement sections of the county Planning and Zoning Ordinance, and it is unlawful to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy or maintain any building, structure or building service equipment in violation of the code. A violation is punishable as a class two misdemeanour.

Permit required

  • New residential and commercial construction, additions and alterations
  • Grading, which is permit-required throughout the unincorporated county
  • Structural work, relocation and demolition
  • On-site wastewater systems, permitted by the county under state delegation
  • Water and sewer line extensions
  • Manufactured and factory-built home installation
  • Right-of-way encroachments
  • Solar photovoltaic systems and battery storage

Typically exempt

  • Water tanks on grade within the published capacity and height-to-width ratio
  • Uncovered detached decks within the published area and height limits
  • Purely cosmetic finish work that alters no regulated system
  • Other work listed in the county's adopted amendments as exempt
⚠️ You can live on site while you build — for twenty-four months. Yavapai County issues a temporary dwelling or office permit allowing occupancy of temporary housing, including travel trailers, recreational vehicles, park models and single-wide manufactured homes, during the construction of a permanent dwelling, whether site-built or manufactured. The allowance runs for a twenty-four month period after issuance. On a rural owner-build that provision is often what makes the project possible at all — but it is a fixed window, and a build that overruns it is a problem worth anticipating rather than discovering.

Yavapai County building department: who handles permitting

The Environmental Services Unit makes Yavapai County its own environmental regulator in a way most counties are not. It performs functions delegated by the state environmental agency, carrying out all aspects of permitting and inspection for conventional and alternative on-site wastewater disposal systems up to twenty-four thousand gallons per day, permitting water and sewer line extensions, and approving sanitary facilities for subdivisions.

That delegation extends to subdivisions specifically. The county holds delegation to implement the subdivision certificate of sanitary facilities approval process, including extensions of water and sewer lines. Projects received by the environmental unit are reviewed for completeness, payment is processed, and the file is then sent to a contracted review engineer for the technical review against the state's adopted rules. Knowing that a third party performs the technical review explains both the timeline and the nature of the comments.

For commercial work the county offers a preliminary code review process, which provides assistance to anyone seeking to develop, improve or rehabilitate a commercial property in the unincorporated county. It enables the various county departments and other applicable jurisdictions to review proposed applications and give timely feedback and direction before detailed design and construction drawings are submitted. On anything of scale that is the cheapest hour you will spend.

Yavapai County permitting contact
DetailInformation
AuthorityDevelopment Services Department, unincorporated Yavapai County
UnitsBuilding Safety, Customer Service and Permitting, Environmental Services, Land Use and Planning
Adopted codesThe twenty eighteen building codes, with county amendments
PortalCounty Citizenserve portal, for applications, status and inspections
Permit scopeBuildings, structures and grading throughout the unincorporated county
WastewaterDelegated from the state agency, up to twenty-four thousand gallons per day
Subdivision sanitationCertificate of sanitary facilities process, with a contracted review engineer
Commercial pre-reviewPreliminary code review before detailed drawings
Temporary occupancyTemporary dwelling or office permit, twenty-four month window
ViolationsHandled under the Planning and Zoning Ordinance; a class two misdemeanour
💻

This county permits your septic system as well as your house. Yavapai County's Environmental Services Unit operates under delegation from the state environmental agency and handles conventional and alternative on-site wastewater systems up to twenty-four thousand gallons per day, water and sewer line extensions, and sanitary facilities approval for subdivisions. On a rural parcel that means the building permit and the wastewater approval are the same relationship rather than two agencies — which is an advantage if you engage both at once.

Yavapai County is not Prescott, and it is not Prescott Valley. Those two are separate municipalities a few miles apart with confusingly similar names, each running its own permitting operation with its own portal and adopted codes. Sedona, Cottonwood, Camp Verde, Chino Valley and Clarkdale permit their own work too. The county permits the unincorporated remainder, which is most of the land area and a minority of the population.

Yavapai County permits: record types and what each covers

The record catalog here is organised by unit, and the environmental records are as central as the building ones on any parcel without a public sewer connection.

Residential permit types

Residential permit types in Yavapai
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the jurisdiction's adopted residential code and local amendments, plus zoning and setbacksValuation-based
AdditionAdded conditioned or unconditioned space attached to an existing dwellingStructural and energy review; most of Arizona sits in a hot-dry climate zone, so envelope and equipment sizing draw attentionValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not moveValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural checkValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageSingle local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in ArizonaFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation, ventilation, and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiringLocal trade review and local inspection against the National Electrical Code edition the jurisdiction has adoptedPer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementLocal trade review; performed by a contractor holding the matching Registrar of Contractors specialty classificationPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationLocal trade review; changeout volume is heavy in Arizona given summer design temperaturesPer-permit minimum or per-unit
Patio cover and shade structureAttached and detached covers, ramadas, and carportsStructural review for wind uplift and attachment, plus zoning for setbacks and lot coverageValuation or flat
Swimming poolIn-ground and above-ground pools and spasBarrier, bonding, and electrical review; Arizona sets a statewide minimum pool barrier standard that applies on top of local rulesValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured or modular homeState plan approval through the Arizona Department of Housing, with local zoning, floodplain, foundation, and utility connection reviewFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation, dust control where earthmoving is involved, and site restoration checkFlat
Temporary dwelling or office permitOwner-builders needing to live on site during constructionOccupancy of temporary housing for a twenty-four month periodPer the county's published permit information
On-site wastewater permitAny parcel without a public sewer connectionPermitted and inspected by the county under state delegationAssessed by Environmental Services

Commercial permit types

Commercial permit types in Yavapai
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the jurisdiction's adopted building code and amendments, plus fire and zoningValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workLocal trade review and local inspection; Arizona has no central state electrical permit for either residential or commercial workPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteLocal trade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationLocal trade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Grading and drainageClearing, grading, and site work that alters drainageCivil review of grading and drainage, separate from the building permit; monsoon-season flows drive the designAcreage or valuation
Dust control permitEarthmoving, trenching, and construction dust on a qualifying siteCounty air quality department, not the building department; required in the fine-particulate nonattainment areasCounty air quality fee schedule
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, dust control, and site restorationFlat or valuation
Preliminary code reviewCommercial development, improvement or rehabilitationCounty departments give feedback before detailed drawings are preparedPer the county's published permit information
Subdivision sanitary facilitiesSubdivisions requiring a certificate of sanitary facilitiesTechnical review performed by a contracted review engineerAssessed by Environmental Services

Residential

  • Building and trade permits are issued and inspected by the same local authority
  • There is no separate state electrical permit — electrical is a local record
  • A Registrar of Contractors licence is required whenever a permit is required, at any job value
  • Properties on septic need on-site wastewater approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's classification must match the actual scope of work
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Yavapai

Yavapai record catalog
RecordWhat it covers
Residential building permitOne- and two-family dwellings, remodels, additions, alterations and accessory structures
Commercial building permitCommercial work, usually preceded by preliminary code review
Grading permitRequired throughout the unincorporated county
On-site wastewater permitConventional and alternative systems up to the delegated threshold
Water or sewer line extensionPermitted by Environmental Services
Temporary dwelling or office permitOccupancy of temporary housing during construction, for twenty-four months
Right of way permitAny encroachment into the county right of way
Minor land divisionLand division filed under the county's published application
Home occupationA business operated from a dwelling, on its own application

Solar permits in Yavapai

Solar is reviewed on two tracks in Arizona, but unlike some neighbouring states both tracks belong to the same government. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — and the electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — are both permitted and inspected by the local Authority Having Jurisdiction. There is no state electrical record to buy alongside the local one, and no state inspector to book.

Solar in unincorporated Yavapai County is permitted and inspected by the county under the twenty eighteen codes as amended. Confirm the electrical edition adopted alongside them, because three separate authorities operate within a short drive here — the county, Prescott and Prescott Valley — and they do not necessarily match. At Yavapai's elevations, snow and wind loading on an array are real structural considerations rather than a Valley formality, and the county publishes its own amendments that apply over the model text.

What varies instead is the code edition. Because each Arizona city, town and county adopts its own editions on its own timetable, the National Electrical Code edition your array is judged against in one jurisdiction may not be the one enforced a few miles away. The Office of the State Fire Marshal sets a minimum electrical standard for the state, but the edition actually enforced is the local one. Confirm it with the jurisdiction before the design is finalised rather than after a correction notice.

Interconnection runs on a third clock and is not something the building department controls. Arizona properties are served by utilities including Arizona Public Service, Salt River Project, Tucson Electric Power and UniSource, alongside municipal utilities and irrigation districts, and each sets its own application, meter and witness-test sequence. Permission to operate follows the utility's process on the utility's schedule, so plan for the tracks to finish at different times.

Roofing permits in Yavapai

A roof covering replacement needs a permit in most Arizona jurisdictions, and the assumption that a like-for-like replacement is exempt travels badly here. The permit is usually quick, but the inspection that matters happens before the covering goes on rather than after.

Arizona operates no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the edition of the code the jurisdiction has adopted and with the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Reroofing is permitted work and follows the ordinary sequence. Yavapai County spans a wide elevation range from the Verde Valley to the high country, so roofing design conditions differ sharply within the same jurisdiction and a single assumption will not serve. Note also that grading is permit-required throughout the unincorporated county, so any site work accompanying a roof or structural project carries its own permit rather than riding along.

Two Arizona-specific pressures shape the work. Sustained summer heat and ultraviolet exposure age a covering faster than the same assembly would age in a milder climate, and monsoon-season wind and driven rain test the fastening and the flashing details rather than the field of the roof. Sequencing is where reroofs go wrong regardless: the deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Yavapai County permit cost

Yavapai County publishes permit fee, impact fee and permit processing information together, alongside a separate planning and zoning fee schedule. Building fees are valuation-driven with plan review assessed alongside, and the environmental and planning scopes are assessed on their own bases.

On a rural build the environmental side is a real budget line rather than an afterthought. On-site wastewater permitting, water and sewer line extension approval and — on a subdivision — the certificate of sanitary facilities process all sit with the county, and the subdivision technical review is performed by a contracted review engineer, which is a cost and a timeline the county does not fully control.

How Yavapai fees are structured
Fee componentHow it works
Building permit feeValuation-based under the county's published fee information
Plan reviewAssessed alongside the building permit
Impact feesPublished with the permit fee and processing information
On-site wastewater permitAssessed by Environmental Services under state delegation
Water and sewer line extensionPermitted and assessed by Environmental Services
Subdivision sanitary facilitiesTechnical review performed by a contracted review engineer
Planning and zoning applicationsUnder a separate published fee schedule
🧮

Want a precise number for a specific Yavapai project? Send us the scope and we will price the permit path before you file.

Yavapai County trade permits

The trades are permitted and inspected by the county under the twenty eighteen codes as amended. Arizona has no state electrical permit, so nothing is filed with the state alongside — though the wastewater scope runs under state-delegated rules.

Electrical permits

Required for service work, panel changes, photovoltaic systems, electric vehicle chargers and most wiring alterations. Confirm the electrical code edition adopted alongside the twenty eighteen building codes; three separate authorities operate within a short drive here and they do not necessarily match.

Plumbing permits

Required for new piping, repipes, fixtures and water heaters. At Yavapai's elevations freeze protection on exterior and unconditioned-space piping is a genuine design item, and on rural parcels the plumbing scope connects directly to a county-permitted on-site wastewater system.

Mechanical permits

Required for heating, ventilation and air-conditioning work, ductwork and refrigeration. The county spans a wide elevation range from the Verde Valley to the high country, so heating and cooling loads differ sharply within the same jurisdiction.

On-site wastewater

Not a building trade, but permitted by the same county under state delegation. Conventional and alternative systems up to twenty-four thousand gallons per day are handled by Environmental Services, together with water and sewer line extensions and subdivision sanitary facilities.

🧢 Arizona licenses contractors through the state Registrar of Contractors (the ROC), and the rule is uniform across the state: a licence is required whenever a job's labour and materials exceed one thousand dollars, or whenever a building permit is required at all — a permitted job needs a licensed contractor regardless of its dollar value. The ROC licence is a state licence that is valid statewide, so there is no separate city or county contractor licence, though a municipality may require its own business licence. The one thousand dollar exemption covers only work that both stays under that combined labour-and-materials figure and does not require a permit. The moment a permit is required, a licensed contractor is required, whatever the price.

Yavapai County permit application: how to apply step by step

Here is how to get a building permit in Yavapai County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm the parcel is unincorporated

Prescott, Prescott Valley, Sedona, Cottonwood, Camp Verde, Chino Valley and Clarkdale all permit their own work. The county permits the unincorporated remainder — most of the land, a minority of the people.

2. Design to the twenty eighteen codes as amended

Yavapai adopted the twenty eighteen family with county amendments and specified appendices. Read the amendments, because the exemptions — water tanks, uncovered decks — are written there with precise tests.

3. Engage Environmental Services early on a rural parcel

On-site wastewater, water and sewer line extensions and subdivision sanitary facilities all sit with the county under state delegation. On a parcel with no public sewer, this determines what is buildable.

4. Use preliminary code review on commercial work

The process lets county departments and other applicable jurisdictions give feedback and direction before detailed design and construction drawings are submitted.

5. Sort temporary occupancy if you will live on site

The temporary dwelling or office permit allows occupancy of a travel trailer, recreational vehicle, park model or single-wide manufactured home during construction, for a twenty-four month period after issuance.

6. Apply and inspect through the portal

Applications, status checks and inspection scheduling run through the county's online portal. Keep the permit and approved plans on site through the inspection sequence.

Inspections in Yavapai County

Inspections are scheduled through the county's online portal alongside applications and status checks. The department covers building safety, permitting, environmental services and planning together, so a project on a rural parcel meets one department rather than several agencies — but it meets several units within it.

The twenty-four month temporary dwelling window is the timeline most worth managing actively on an owner-build. It is the period during which you may occupy temporary housing while constructing the permanent dwelling, and it starts at issuance rather than at first inspection. A self-build that stalls for a winter can consume a substantial share of it without much visible progress.

Enforcement runs through the Planning and Zoning Ordinance rather than the building code alone, and a violation is punishable as a class two misdemeanour. Where the building official has issued orders and the violation is not abated according to them, the county's provisions contemplate a continuing violation. Engage at the first notice rather than arguing after the fact.

Close-out follows the ordinary sequence to the occupancy certificate. On a rural parcel expect the on-site wastewater approval to be part of reaching occupancy rather than a parallel errand, since the same county holds both records.

Yavapai County permit search and official resources

These are the primary Yavapai County and Arizona sources behind this guide. The county adopts and amends on its own schedule, so confirm the current position before you file.

Frequently asked questions

Which codes does Yavapai County enforce?

The twenty eighteen building codes, including the twenty eighteen International Building Code with specified appendices, adopted by reference by the Board of Supervisors with county amendments. That is behind the Phoenix-area cities, and the county has framed the choice as part of a wider effort to reduce regulation and construction cost.

Do I need a permit for grading?

Yes. Permits for buildings, structures and grading are required in all of the unincorporated areas of Yavapai County. Earthwork is not treated as outside the permit system here, which catches out people who assume grading is a separate matter from building.

Can I live on site while I build?

Yes, with a permit. The county issues a temporary dwelling or office permit allowing occupancy of temporary housing — including travel trailers, recreational vehicles, park models and single-wide manufactured homes — during construction of a permanent dwelling, for a twenty-four month period after issuance.

Who permits my septic system?

The county. Yavapai County's Environmental Services Unit performs functions delegated by the state environmental agency, covering permitting and inspection of conventional and alternative on-site wastewater disposal systems up to twenty-four thousand gallons per day, plus water and sewer line extensions and subdivision sanitary facilities.

What is preliminary code review?

A process for anyone seeking to develop, improve or rehabilitate a commercial property in the unincorporated county. It lets the various county departments and other applicable jurisdictions review the proposal and give timely feedback and direction before detailed design and construction drawings are submitted.

Is a small deck exempt?

Only if every part of the test holds. Uncovered decks are exempt where they do not exceed two hundred square feet, are not more than thirty inches above grade at any point, are not attached to a dwelling, and do not serve the exit door required by the residential code. Fail any one of those and the deck is permitted work.

What about a water tank?

Water tanks supported directly upon grade are exempt where the capacity does not exceed five thousand gallons and the ratio of height to diameter or width does not exceed two to one. Both tests have to hold, and the ratio test is the one people forget.

How serious is a code violation here?

A violation is punishable as a class two misdemeanour. Violations are handled through the enforcement sections of the county Planning and Zoning Ordinance, and the code makes it unlawful to erect, alter, move, convert, demolish, use, occupy or maintain any building or building service equipment in violation. Engage at the first notice.

Who does the subdivision sanitary review?

A contracted review engineer. Projects received by the environmental unit are reviewed for completeness and payment processed, then sent out for the technical review against the state's adopted rules. That is worth knowing because it shapes both the timeline and the character of the comments you get back.

Do the state accessory dwelling unit rules apply here?

No. Arizona's twenty twenty-four accessory dwelling unit statute sits in the state's cities and towns title and binds municipalities above a population threshold. It does not reach counties. Accessory dwelling units in unincorporated Yavapai County are governed by the county's own Planning and Zoning Ordinance.

Is Yavapai County the same as Prescott or Prescott Valley?

No. Prescott and Prescott Valley are two separate municipalities a few miles apart with similar names, each permitting its own work under its own codes and portal. Sedona, Cottonwood, Camp Verde, Chino Valley and Clarkdale do the same. The county permits the unincorporated remainder.

What ends a Yavapai County project on paper?

The occupancy certificate, once every required inspection has passed. On a rural parcel the on-site wastewater approval is part of getting there rather than a separate errand, because the same county department holds both records.

Simplify Yavapai County permitting with Alliance Permitting

Yavapai County is a rural county that regulates its own water and wastewater under state delegation, sits on older code editions deliberately, and gives owner-builders a two-year window to live on site. The environmental side is usually the critical path. Alliance Permitting prepares, files and tracks Yavapai County permits through issuance.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Yavapai because the work is done by people who have stood at the counter:

  • We engage Environmental Services at the start, because on rural parcels wastewater decides feasibility.
  • We work to the county's twenty eighteen amendments rather than a newer edition from a neighbouring city.
  • We book preliminary code review on commercial work, before detailed drawings are commissioned.
  • We diary the twenty-four month temporary dwelling window from issuance, not from first inspection.

Alliance Permitting is a permit documentation and expediting service in Arizona. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Yavapai sooner?

Let Alliance prepare, file, and track your Yavapai permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Yavapai County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.