Municipal GuideCaliforniaUnion City · Alameda County

Union City Building Permit — Filed & Tracked For You

Everything contractors, builders and developers need for a City of Union City building permit — the Building Division, the 2025 codes and inspections.

Authority: Building DivisionCode: Union City (Title 24)Phone: 510-675-5313
Alameda County city
About sixty-six thousandCity is its own AHJ
Economic and Community Development
2025 code from January 2026Building Division
Inspections capped daily
Call early to secure a slotDepartment sets the cap
City licence required
Alongside the state licenceBefore the application

Union City is an Alameda County city of about sixty-six thousand residents in the southern East Bay, between Hayward and Fremont, with established residential neighbourhoods and a substantial industrial and logistics base. Its Building Division, within the Economic and Community Development Department on Alvarado-Niles Road, is the sole building authority inside the city.

This guide covers the Building Division, the local licence rule, the capped inspection calendar, the undergrounding trigger on larger additions, and the codes in force.

This guide covers work inside the City of Union City limits. Unincorporated Alameda County and neighbouring cities are separate authorities.

📋

Inspections are capped per day and a city licence sits alongside the state one. The Building Department caps the number of inspections it will take each business day, so calling early is not advice but scheduling strategy. Separately, the construction permit application requires a contractor to hold a valid state licence and a Union City licence before applying. On larger residential work there is a third trap: a new single family residence, or an addition that increases total floor area by fifty percent or more, triggers the municipal code requirement to underground new utilities.

What requires a building permit in Union City?

California builds on a single statewide code — the California Building Standards Code, known as Title 24 — adopted on a three-year cycle by the California Building Standards Commission. The 2025 edition took effect on January 1, 2026 and governs statewide. Cities and counties enforce Title 24 and may adopt local amendments, but an amendment must be filed with the state and may only be equal to or more restrictive than the state code, justified by local climatic, geologic or topographic conditions. So the first question in Union City is which authority has jurisdiction — the city on incorporated parcels, the county in unincorporated territory — and what local amendments sit on top of Title 24.

Permit required

  • New commercial, multi-family and residential construction, additions and change of occupancy
  • Structural alterations, load-bearing changes, foundations, decks and retaining walls
  • Electrical work — services, panels, circuits, solar and EV charging — under the California Electrical Code
  • Plumbing under the California Plumbing Code, tied to a licensed contractor
  • Mechanical and HVAC change-outs, and work affecting the Title 24 energy envelope
  • Re-roofing above the exempt scope, pools, signs, and demolition

Often exempt

  • Minor repairs and maintenance replacing materials in kind
  • Small accessory structures below the local threshold, where zoning allows
  • Painting, flooring, cabinetry and other finish work
  • Like-for-like fixture or appliance swaps with no alteration to wiring or piping

Local amendments and thresholds differ from one jurisdiction to the next, so an exempt list from a neighbouring city is not reliable — a project waved through in one place needs a full permit set in the next. An exemption from a building permit is never an exemption from zoning, the statewide energy or green-building codes, or an electrical or plumbing permit. Confirm scope with Building Division before work starts.

The statewide layers that apply everywhere

Several parts of Title 24 apply on top of the base building code and routinely catch projects owners assume are exempt: the California Energy Code (Part 6), among the strictest in the nation; CALGreen (Part 11), California’s mandatory statewide green-building code; and the accessibility provisions in Chapters 11A and 11B. Seismic design is built into the code statewide, and in fire-prone areas the wildland-urban-interface rules of Chapter 7A and Cal Fire defensible-space requirements add a further layer. In the City of Union City, the Building Division administers Title 24 with city amendments adopted by ordinance, with the 2025 codes in force from January 2026.

⚠️ Confirm the authority and the local amendments, then permit before you build. Building without a required permit exposes the job to stop-work orders, penalties, correction orders, delayed occupancy and problems at resale, refinancing or insurance. The safe first step is to confirm the authority having jurisdiction and the code edition in force for the parcel.

Who handles permitting in Union City?

The Building Division issues construction permits and carries out plan check and inspection for residential, commercial and industrial work inside the city limits.

Union City permitting contact
DetailInformation
AuthorityCity of Union City Building Division
ServesThe City of Union City limits
Phone510-675-5313
Counter34009 Alvarado-Niles Road; alternating Friday closure
Code2025 codes in force from January 2026
FilingCounter submittal; email route for defined simple scopes
LicensingState CSLB license plus a Union City licence
RecordsPermit records held by the division

The counter runs Monday to Thursday with a short window on alternating Fridays, and takes over-the-counter permits, plan submittals and resubmittals in person. State licensed contractors can also use an email or mail-in route for a defined list of simple scopes: minor plumbing, mechanical and electrical work, water heater replacement, residential electrical service replacement, wall furnace and heating replacement with the energy form attached, reroofs that add no weight, like-for-like window replacement, and water or gas line repair.

Two referrals are the applicant’s responsibility rather than the division’s: plans go to the county health department and to the sanitary district directly where the project needs them. The city also runs a construction and demolition recycling ordinance requiring full recycling of concrete, asphalt, clean soils and plant debris and at least half of other debris on covered projects.

Permit types

Residential permits

Residential work inside the city is permitted and inspected by the division under the 2025 codes and city amendments. The exempt list is specific: detached accessory structures under a hundred and twenty square feet with no mechanical, electrical or plumbing, fences under seven feet, retaining walls under four feet measured from the bottom of the footing with limited surcharge, and finish work such as painting, tiling, carpeting, cabinets and countertops. Planning or public works approval can still apply to work that is exempt from a building permit.

How California contractor credentials work

California licenses contractors statewide through the Contractors State License Board, not locally. The CSLB issues three license types — Class A for general engineering, Class B for general building, and the Class C specialty classifications for individual trades — and a contractor must hold the classification that matches the work. A license is required for any project valued at one thousand dollars or more in combined labour and materials, and, in practice, for any work that requires a permit regardless of value.

💼

In California the license lives with the state, not the city. The same CSLB license is recognised in every jurisdiction, so there is no separate local contractor registration to secure before pulling a permit. What the permitting authority does check is that the license number is active and carries the right classification for the scope, along with workers’ compensation coverage. Confirm the classification matches before filing.

Commercial permits

Commercial work goes through division plan check against the California Building Code, the Fire Code, the Energy Code and CALGreen, with multiple plan sets and specifications for assemblies and equipment. The division routes plans to the appropriate city departments, but the applicant delivers plans to the county health department and the sanitary district where those apply. All newly constructed commercial buildings fall under the construction and demolition recycling ordinance.

Licenses, trade classifications and design professionals

Practically, three credential layers appear on California projects: a CSLB license in the correct classification for the contractor pulling the permit; the specialty C-classifications for the electrical, plumbing and mechanical trades; and, on commercial and larger residential work, drawings stamped by a California-licensed architect or engineer. Confirm what Building Division requires for the specific building before filing.

Union City permit costs and fees

Budget the city building permit and plan-check fees, separate trade permits, the state Building Standards and seismic surcharges, sanitary district charges, and any development impact fees. A receipt of payment is presented to the building department before the construction permit is issued, so the payment step sits inside the issuance sequence rather than after it.

How Union City permit fees are structured
Fee componentHow it works
Building permitBased on project valuation or square footage; set by the local schedule
Plan checkA percentage of the permit fee or a flat charge, at submittal
Trade permitsSeparate electrical, plumbing and mechanical fees
State surchargesBuilding Standards and seismic (SMIP) fees collected with the permit
Impact and school feesDevelopment impact and school-district fees in growth areas
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

California layers two uniform state surcharges — the Building Standards Administration fee and the Strong Motion Instrumentation seismic fee — on top of the local charges, so they appear on permits everywhere. The building and plan-check fees themselves are local and change, and California law limits them to the reasonable cost of providing the service, so a figure from a neighbouring city is not reliable — ask Building Division for the schedule in force on your filing date.

🧮

Need a real number for a specific Union City project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.

Trade permits and who may pull them

Trade permits are separate from the building permit and, on projects that require one, generally cannot be issued until the building permit is in place. Each trade follows its own part of Title 24 — the California Electrical, Plumbing and Mechanical Codes — and is tied to a contractor holding the matching CSLB specialty classification, the same license statewide.

🛠️

California runs the trades on one statewide license. Electrical work is tied to a C-10 contractor, plumbing to a C-36, and heating and air to a C-20, each licensed by the CSLB rather than the city, so the credential travels with the contractor from one jurisdiction to the next. What changes locally is the permit itself and any local amendments — confirm both with the authority that issues it.

  • Electrical work follows the California Electrical Code and a C-10 electrical contractor.
  • Plumbing work follows the California Plumbing Code and a C-36 plumbing contractor.
  • Mechanical work follows the California Mechanical and Energy codes and a C-20 HVAC contractor.

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work on commercial and multi-family structures

Typically exempt

  • Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
  • Clearing a stoppage without replacing or rearranging concealed piping
  • Filter, thermostat and routine component service
  • Like-for-like appliance repair that does not alter the connection

How to apply for a Union City building permit

1. Confirm the parcel is inside the city

Unincorporated Alameda County and neighbouring cities are separate authorities.

2. Obtain the Union City licence

Contractors need a valid state and city licence before applying.

3. Choose the counter or email route

Defined simple scopes can be emailed by state licensed contractors.

4. Check the undergrounding trigger

New homes and additions adding half the floor area trigger it.

5. Deliver health and sanitary district plans yourself

The division does not route those two referrals.

6. Book inspections early against the daily cap

The department limits how many inspections it takes each day.

Review, corrections and what actually causes delay

In California, the first cause of delay is uncertainty over jurisdiction — filing with the county when a city should have it, or missing a local amendment on top of Title 24. After that come Title 24 energy and CALGreen documentation, a CSLB classification that does not match the scope, and, in fire or coastal areas, defensible-space or coastal-zone requirements that were not addressed up front. Build the plan-check time into the schedule and confirm the checklist with Building Division before filing.

📅

Approvals do not stay live indefinitely. A California building permit carries a validity period and can expire if work does not start or stalls between inspections. On phased or financed work, keep the permit active with periodic progress inspections and confirm the expiry window before it passes.

Inspections in Union City

Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and Title 24 energy, CALGreen measures, fire systems on commercial work, and final, with a certificate of occupancy before use. The department caps inspections per business day, so requests are made as early as possible and the inspection request handout issued with the permit governs the detail.

California inspections are keyed to the code editions in force when the permit issued, so the approved plans and any energy and green-building documentation need to be on site for the inspector to check against. Confirm the notice Building Division needs and schedule around its inspection windows.

Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, Title 24 energy documentation and your correction responses available on site.

Union City permit search and official resources

Permit records in California sit with the local authority that issued them. Where the City of Union City Building Division is the authority for the City of Union City limits, it holds the building permit, the inspection history and the certificate of occupancy. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — and confirm the code edition that was in force.

🔍

Confirm the authority having jurisdiction and the local amendments first. California enforces one statewide code, Title 24, but each city and county adds its own amendments and fee schedule, so the requirements that apply vary by parcel. Confirm current requirements, fees and review turnaround for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Frequently asked questions

Who issues building permits in the City of Union City?

The Building Division within the Economic and Community Development Department on Alvarado-Niles Road; unincorporated Alameda County and neighbouring cities are separate authorities.

Do I need a city licence as well as a state one?

Yes. The construction permit application states that a contractor shall hold a valid state licence and a Union City licence before applying for a construction permit.

Why can I not get an inspection when I want one?

The Building Department caps the number of inspections it takes each business day, so requests are best made early and against the inspection request handout issued with the permit.

Can I email a permit application?

State licensed contractors can email or post a defined list of simple scopes, including water heater and wall furnace replacement, reroofs adding no weight, like-for-like window replacement, and water or gas line repair.

When does undergrounding apply?

A new single family residence, or an addition increasing the total floor area by fifty percent or more, triggers the municipal code requirement to underground new utilities.

Which code edition applies?

The 2025 codes are in force, adopted by city ordinance and effective from January 2026.

Simplify Union City permitting with Alliance Permitting

Union City rewards booking inspections the moment the permit issues and holding the city licence before the application, not after the correction.

250K+Permits approved
All 50States covered
22 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 22 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Union City because the work is done by people who have stood at the counter:

  • We clear the Union City licence before the application is filed.
  • We book inspections against the daily cap rather than on demand.
  • We route health and sanitary district plans ourselves.
  • We test the undergrounding trigger on any substantial addition.
  • We use the email route where the scope actually qualifies.

Alliance Permitting is a permit documentation and submission company. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Union City sooner?

Let Alliance prepare, file, and track your Union City permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Union City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.